JA12.3.2.1 Prescriptive Compliance

p.261Minimum System Performance Requirements

Figure on PDF page 261
p.261 Needs alt text review

p.261JA12.3.2.1 Prescriptive Compliance

p.261The installed BESS shall meet or exceed the following specifications:

p.261(a) Single charge-discharge cycle AC to AC (round-trip) efficiency of at least 80

p.261percent.

p.261(b) Energy capacity retention of 70 percent of nameplate capacity after 4,000 cycles

p.261covered by a warranty, or 70 percent of nameplate capacity under a 10-year warranty.

p.261JA12.3.2.2 Performance Compliance

p.261The installed BESS shall meet or exceed the following specifications:

p.261(a) Usable capacity of at least 5 kWh per building.

p.261(b) Energy capacity retention of 70 percent of nameplate capacity after 4,000

p.261cycles covered by a warranty, or 70 percent of nameplate capacity under a 10-year warranty.

p.261Control Requirements

Figure on PDF page 261
p.261 Needs alt text review

p.261All control strategies shall meet the General Control Requirements specified in Section JA12.3.3.1, except for the requirement specified in Section JA12.3.3.1(e), which is only applicable to BESS used in single-family residential buildings. The BESS may have one or more of the control strategies specified in Section JA12.3.3.2. Each of the control strategies shall meet the relevant requirements for that control strategy as specified in Section JA12.3.3.2. The BESS shall also have the capability to switch to any of the control strategies with which the BESS is programmed.

p.261JA12.3.3.1 General Control Requirements

p.261The requirements below are applicable to all control strategies.

p.261(a) Remote Capability: The BESS shall have the capability of:

p.261I. Being remotely programmed to change the charge and discharge periods, and

p.261II. Remotely switching between control strategies.

p.261(b) Charging Behavior: When combined with an on-site solar photovoltaic system,

p.261the BESS shall first charge from an on-site photovoltaic system when the photovoltaic system production is greater than the on-site electrical load. The BESS also may charge from the grid during off-peak TOU hours of the day if allowed by the load serving entity. In anticipation of severe weather, Public Safety Power Shutoff events, or demand response signal, the BESS may charge from the grid at any time if allowed by the load serving entity.

p.261Appendix JA12 – Qualification Requirements for Battery Energy Storage System