p.3072025 Residential Appendices For dwelling units that have used a compliance alternative that requires field verification and diagnostic testing, the enforcement agency shall not approve a dwelling unit until the enforcement agency has received, in accordance with Title 24, Part 1 Section 10-103(a), Section 10-103(d) and the procedures in Appendix RA2, a registered copy of the Certificate of Compliance that has been completed and signed by the person responsible for the design; all applicable registered Certificates of Installation that have been completed and signed by the builder or subcontractor, and all applicable registered Certificates of Verification that have been completed and signed by the ECC-Rater in conjunction with requests for final inspection for each dwelling unit. The ECC-Provider shall make document verification services available to enforcement agencies, builders and contractors, ECC-Raters, the Energy Commission, and other authorized users of the Provider data registry.
p.307If necessary to avoid delay of approval of dwelling units completed when outside temperatures are below 55°F, the enforcement agency may approve compliance with the refrigerant charge verification requirements when installers have used the Weigh-in Charging Method described in Reference Residential Appendix RA3, Section RA3.2.3.1 and have not used the Section RA3.2.3.2 option for verification compliance. This approval will be on the condition that installers submit to the enforcement agency a registered Certificate of Installation that includes a signed declaration indicating agreement to return to correct refrigerant charge if an ECC-Rater determines at a later time when the outside temperature is 55°F or above, that correction is necessary. Installers must also notify homeowners that their systems have not had their charge verified. The ECC-Provider shall track these projects to ensure a ECC-Rater conducts the required refrigerant charge verification for all such systems. When the outdoor temperature is 55°F or above, the ECC-Rater shall use the RA3.2.2 standard charge verification procedure, or a procedure approved by the HVAC system manufacturer and Energy Commission for the refrigerant charge verification. The ECC-Rater shall report the diagnostic results on the applicable Certificate of Verification and shall register the certificate with the ECC-Provider. When refrigerant charge verification testing performed by the ECC-Rater indicates adjustment to the charge is required, the ECC-Provider shall notify the installer, and the builder or building owner that corrective action is required. The ECC-Provider may also notify the enforcement agency that corrective action is required. All air- cooled air conditioners and air-source heat pumps that utilize the Weigh-In Method shall be verified by a ECC-Rater using one of the applicable refrigerant charge verification procedures. Compliance with verification requirements cannot utilize group sampling procedures when the installer utilized the Weigh-In Method.
p.307RA2.5 Installer Requirements - Certificate of Installation Documentation
p.307Certificates of Installation are required when dwelling units utilize features, materials, components, or manufactured devices that are required for compliance with the Appliance Efficiency Regulations and Title 24, Part 6. Certificates of Installation shall indicate the installed features, materials, components, or manufactured devices are in conformance with the specifications listed on the Certificate of Compliance for the dwelling. The builder or the installing subcontractor eligible under Division 3 of the Business and Professions Code to accept responsibility for construction or installation, in the applicable classification for the scope of work, shall sign and submit Certificate of Installation documentation and post a copy of the
p.307Appendix RA2– Residential Field Verification and Diagnostic Testing Documentation Procedures