| Table JA18.4-1 Required | Guideline 36 Logic for Certified Programming Library | ||
| Guideline 36 Logic Section | Minimum Validation Requirements | ||
| Section 5.1 General Sections 5.1.14 and 5.1.17.3 only | Trim and Respond Setpoint Reset Logic, including Importance Multipliers, Request-Hours Accumulator, and Trim and Respond Variables per 5.1.14 Air Economizer High Limits based on device type and climate zone, per 5.1.17.3 | ||
| Section 5.2 Generic Ventilation Zones (Section 5.2.1.3 is not required) | Zone minimum outdoor air setpoints and occupied minimum airflow calculations per 5.2.1.4 Time-averaged ventilation logic per 5.2.2 | ||
| Section 5.3 Generic Thermal Zones | Independently adjustable zone heating and cooling setpoints, demand limit setpoint adjustments, and setbacks per 5.3.2 Heating Loop and Cooling Loop are separate control loops per 5.3.4 | ||
| Section 5.4 Zone Groups | Separate schedules for each Zone Group per 5.4.2 All zones in a Zone Group are in the same Operating Mode per 5.4.3 Zone Group Operating Modes per 5.4.6 | ||
| Section 5.5 VAV Terminal Unit— Cooling Only | Airflow endpoints determined by Zone Group Mode per 5.5.4 Airflow setpoint is reset by Heating Loop or Cooling Loop signals per 5.5.5 System Requests per 5.5.8 | ||
| Section 5.6 VAV Terminal Unit with Reheat | Airflow endpoints determined by Zone Group Mode per 5.6.4 Airflow setpoint is reset by Heating Loop or Cooling Loop signals per 5.6.5 System Requests per 5.6.8 | ||
| Section 5.15 Air-Handling Unit System Modes | All Operating Modes defined for Zone Groups (see Section 6.4) are also defined for air-handling units per 5.15.1 |
p.282Purpose and Scope
p.282Title 24, Part 6, Section 140.4(r) requires that HVAC control systems with DDC use programming originating from a certified programming library based on control sequences of operation described in ASHRAE Guideline 36. This section describes the requirements of the Guideline 36 programming library.
p.282HVAC Controls technology companies shall certify to the Energy Commission that the Guideline 36 Programming Library meets the requirements of Reference Joint Appendix
p.282Certification Submittal Requirements
p.282Each company wishing to certify that their Guideline 36 programming library conforms to the Guideline 36 library requirements of Title 24, Part 6, may do so in a written declaration. This requires that a letter be sent to the California Energy Commission declaring that the Guideline 36 library is complete and conforms to the requirements listed in JA18.3. The declaration at the end of this section shall be used to submit to the California Energy Commission.
p.282Information that shall be included with the Declaration
p.282The certifying company shall provide evidence of compliance with these requirements, including the following at a minimum:
p.282• Evidence: List of hardwired points and control points used in the library. • Evidence: Documentation of test plan and results, including inputs and outputs for each test. • Evidence: Documentation of programming, such as screenshots of programming function blocks or programming script.
p.282The programming library to be certified shall include complete control logic for all sections from ASHRAE Guideline 36 listed in Table JA18.4-1, and shall meet the minimum validation requirements listed.
p.282Appendix JA18 – Guideline 36 Programming Library Requirementsp.283
p.283Appendix JA18 – Guideline 36 Programming Library Requirements