p.5092025 Nonresidential Appendices 6. Close and lock exterior windows and doors. Close any vents within window frames.
p.5097. Prop interior doors open to create a single uniform zone.
p.5098. Where drop ceilings are installed in a location that constitutes a barrier to air flow between the testing equipment and the plane of air tightness of the space being tested, remove ceiling tiles at a rate of one per 500 ft2 to prevent movement of tiles during test and to ensure a uniform pressure within plenum space. Additional tiles can be removed to ensure a uniform pressure distribution in the plenum space.
p.5099. Install exterior electrical box caps (if applicable).
p.509Run Preliminary Test
p.509Pressurize the building to 75 Pa to approximate if building is expected to pass test and to confirm that pre-test set up is complete and that temporary sealing stays in place while under pressure.
p.509Enclosure Measurement Procedures
p.509NA5.5.1 Pressurization Test
p.5091. Reference ASTM E3158-18 for Whole Building Air Leakage Testing.
p.5092. Record interior and exterior weather conditions.
p.5093. Record average wind speeds.
p.5094. Record interior and exterior temperatures before the testing begins.
p.5095. Record site elevation in feet above sea level.
p.5096. Measure bias pressures with fans off and covered.
p.5097. Perform a multi-point pressurization test from at least +25 to +50 Pa (leakage is reported at 75 Pa, as attained or extrapolated).
p.5098. Record a minimum of 5 points between minimum and maximum induced pressures.
p.5099. Measure bias pressures at end of multi-point test with fans off and covered.
p.50910.Record interior and exterior temperatures.
p.50911.If the pressure exponent n is less than 0.45 or greater than 1.0 per Section 9.5.1 of ASTM E3158-18, then the pressurization test is invalid and shall be repeated.
p.509Appendix NA45– Field Verification and Diagnostic Testing of Whole Building Air Leakage