NA1.7.1 Third Party Quality Control Program Responsibilities

p.4812025 Nonresidential Appendices choose to reanalyze compliance and choose different measures that will achieve compliance. In this case a new Certificate of Compliance shall be completed and submitted to the ECC-Provider, the ECC-Rater, and the enforcement agency. The ECC-Rater shall conduct field verification and diagnostic testing for each of these measures to verify that problems have been corrected and that the requirements for compliance have been met. Upon verification of compliance, the ECC-Rater shall enter the test results into the Data Registry. Whereupon the Provider shall make available to the ECC-Rater, the builder, the enforcement agency, and other authorized users of the Data Registry a copy of the registered Certificate of Verification for each individual unit in the group.

p.481The ECC-Provider shall file a report with the enforcement agency explaining all action taken (including field verification, diagnostic testing, and corrective action,) to bring into compliance systems or dwelling units for which full testing has been required. If corrective action requires work not specifically exempted by the CMC or the CBC, the builder shall obtain a permit from the enforcement agency prior to commencement of any of the work.

p.481Corrections to avoid reporting a failure to the Data Registry shall not be made to a sampled or re-sampled feature after the ECC-Rater selects the sample feature, or during the course of testing of the unit. If it becomes evident that such corrections have been made to a sampled or re-sampled feature to avoid reporting a failure, field verification and diagnostic testing shall be required to be performed on 100 percent of the individual systems or dwelling units in the group.

p.481Third Party Quality Control Programs

Figure on PDF page 481
p.481 Needs alt text review

p.481The Energy Commission may approve Third Party Quality Control Programs (TPQCP) to verify the work of participating installers, collect and evaluate more detailed data than necessary for compliance, identify in real time during the installation invalid and inaccurate installer testing and noncompliant installations, and enable corrected testing with the goal of bringing installations into compliance before the installer leaves the job site. TPQCP personnel and participating TPQCP installation contractors do not have the authority to sign Certificate of Verification documentation as an ECC-Rater.

p.481NA1.7.1 Third Party Quality Control Program Responsibilities

p.481An approved Third Party Quality Control Program shall:

p.481(a) Provide training to participating program installers (including contractors, subcontractors,

p.481and technicians) to ensure proficiency in:

p.481i. Quality HVAC installation procedures, common causes of failure, and corrections.

p.481ii. Understanding of the Standards requirements for field verification and diagnostic

p.481testing of measures, which are subject to TPQCP program procedures

p.481iii. Understanding all applicable specifications for field verification and diagnostic testing

p.481procedures specified in the Reference Residential Appendices.

p.481iv. Any applicable specialized TPQCP-specific procedures.

p.481(b) Collect field verification and diagnostic test data (data) from participating installers for

p.481each installation completed.

p.481Appendix NA1– Nonresidential Verification, Testing, and Documentation Procedures