p.4862025 Nonresidential Appendices Acceptance as specified in Section NA1.5, and a copy of the registered Certificate of Verification as specified in NA1.6.
p.4872025 Nonresidential Appendices
p.486Third Party Quality Control Programs, as specified in NA1.7, shall not use group sampling for alterations. When a Third Party Quality Control Program is used, the enforcement agency may approve compliance based on the Certificate of Installation prior to completion of the Certificate of Verification, where data checking has indicated that the unit complies, on the condition that a Certificate of Verification will be submitted.
p.486Acceptance Test Technicians Alternative Procedure
p.486When field verification and diagnostic testing is required to be performed in accordance with NA1 and NA2 procedures, compliance with verification may alternatively be satisfied by a certified Acceptance Test Technician (ATT) according to the requirements specified in this section.
p.487(This page intentionally left blank.)
p.486NA1.9.1 Field Verification by the Acceptance Test Technician
p.486Under this alternative procedure, when the Certificate of Compliance indicates that field verification and diagnostic testing is required as a condition for compliance with Title 24, Part 6, a certified ATT may perform the verification to satisfy the condition of compliance. Systems verified under this procedure are not eligible for use of the sampling procedures described in NA1.6.
p.486NA1.9.2 Certificate of Acceptance Documentation
p.486The ATT shall perform the required field verification and diagnostic testing according to the procedures specified in Reference Nonresidential Appendix NA2 and verify that the work meets the requirements for compliance as shown on the Certificate of Compliance. The owner or installer shall complete a Certificate of Installation and sign the certificate to certify that the installation work meets the requirements for compliance credit.
p.486The ATT shall sign a copy of the Certificate of Acceptance and submit a copy to the approved ATTCP. The acceptance procedures for the Certificate of Acceptance shall conform to the requirements in NA1.5.
p.486A signed copy of the Certificate of Acceptance shall be posted at the job site for review by the enforcement agency, in conjunction with requests for final inspection in accordance with NA1.3.4.
p.486The Certificate of Acceptance that is posted in the field for review by the enforcement agency at final inspection shall conform to all applicable requirements of 10-103(a)4.
p.486Appendix NA1– Nonresidential Verification, Testing, and Documentation Proceduresp.487
p.487Appendix NA1– Nonresidential Verification, Testing, and Documentation Proceduresp.488