NA7.19.1.2 Functional Testing

p.6042025 Nonresidential Appendices b) Visual confirmation of the central steam trap monitoring system installation,

p.604operation and programmed as designed.

p.604c) Confirm the central steam trap monitoring system displays status of all installed

p.604steam trap sensors with a descriptive label or cross-references to a look-up table with location of sensor.

p.604NA7.19.1.2 Functional Testing

p.604For steam systems with up to seven (7) steam traps required to have fault detection in accordance with Section 120.6(i), all steam traps would be tested. For steam systems with more than seven (7) steam traps; sampling would include a minimum of 1 steam trap for each group of up to 7 additional steam traps. If the first steam trap in the sample group passes the acceptance test, the remaining steam traps in the sample group also pass. If the first steam trap in a sample group fails, the rest of the steam traps in that group must be tested. If any tested steam trap fault detection sensor fails it must be repaired, replaced, or adjusted until it passes the test.

p.604For each fault detection sensor, test the following:

p.604Step 1: Identify the status of the steam trap and note if the steam line is operational or

p.604non-operational at the time of the functional test.

p.604Step 2: Confirm that central steam trap monitoring system is receiving a signal that

p.604reflects the status of the steam trap.

p.604Step 3: Generate a fault at the steam trap sensor for each tested steam trap.

p.604Step 4: Verify that the central steam trap monitoring system detects the fault and reports

p.604the fault detection to the operator.

p.604Step 5: Reconnect steam trap sensor and verify the fault detection sensor is

p.604communicating with the central steam trap monitoring system.

p.604Step 6: Verify that central steam trap monitoring system does not report a fault.

p.604Transcritical CO2 Systems Acceptance Tests

Figure on PDF page 604
p.604 Needs alt text review

p.604NA7.20.1 Transcritical CO2 Gas Cooler and Gas Cooler Fan Motor Variable Speed

p.604Control for Refrigerated Warehouses and Commercial Refrigeration The purpose of these tests is to confirm proper operation of gas cooler control, including variable speed fan operation and variable setpoint control logic, which are both important elements of floating head pressure control, with the intent to operate with the lowest total system energy (considering both compressors and gas cooler fan power) through the course of the year.

p.604Appendix NA7 – Installation and Acceptance Requirements for Nonresidential Buildings and Covered Processes