JA12.3.3.2.4 Controls for Separate Battery Energy Storage Systems

Scanned crop of table from PDF page 263
Text in this table

JA12.3.3.2.4 Controls for Separate Battery Energy Storage Systems When a BESS is installed separately from (not in combination with) an on-site solar photovoltaic system, including when the building is served by a community solar PV system, to qualify for the compliance credit, the BESS shall be programmed to: 1. Start Charging from the grid during the lowest priced TOU hours of the day and start discharging during the highest priced TOU hours of the day, or 2. Meet the demand response control requirements specified in Section 110.12(a)1 and Section 110.12(a)2, and shall have the capability to change the charging and discharging periods in response to signals from the load serving entity or a third- party aggregator. JA 12.3.3.2.5 Alternative Control Approved by the Executive Director The Executive Director may approve applications for alternative control strategies that demonstrate equal or greater benefits to one of the JA12 control strategies. To qualify for Alternative Control, the BESS shall be operated in a manner that increases self- utilization of the photovoltaic array output, responds to utility rates, responds to demand response signals, minimizes greenhouse gas emissions from buildings, and/or other strategies that achieve equal or greater benefits than specified in Sections JA12.3.3.2.1, JA12.3.3.2.2, JA12.3.3.2.3, or JA12.3.3.2.4. The application to the Executive Director for the alternative control option shall be accompanied with clear and easy to implement algorithms for incorporation into the compliance software for compliance credit calculations. JA12.4 Enforcement Agency The local enforcement agency shall verify that all Certificate of Installations are valid. The BESS shall be verified as a model certified to the Energy Commission as qualified for credit as a BESS. In addition, the enforcement agency shall verify that the BESS is commissioned and operational with one of the controls listed in JA12.3.3.2.1, JA12.3.3.2.2, JA12.3.3.2.3, JA12.3.3.2.4, JA12.3.3.2.5. The control strategy and the compliance cycling capacity at system installation, commissioning, and final inspection by the enforcement agency shall be the control strategy and the compliance cycling capacity that was used in the Certificate of Compliance. JA12.5 Certification Documentation Requirements The following information shall be submitted to CEC for JA12 certification: a) For all buildings, a specification sheet showing usable capacity, compliance cycling capacity, round-trip efficiency and identification as a field assembled or integrated BESS. b) In addition, for single-family buildings: 1. A document showing the software operation of cycling control strategy as described in JA12.3.3.1(e), and

p.263Appendix JA12 – Qualification Requirements for Battery Energy Storage Systemp.264

p.264Appendix JA12 – Qualification Requirements for Battery Energy Storage System