p.3762025 Residential Appendices following procedures. If a system has more than one indoor unit, then all of the system's applicable indoor units shall be verified according to this procedure.
p.3772025 Residential Appendices The procedure applies to wood and metal construction of framed and non-framed envelope assemblies. Framed assemblies include wall stud cavities, roof/ceiling assemblies, and floors typically insulated with: (1) batts of mineral fiber and mineral wool; (2) loose-fill materials of mineral fiber, mineral wool, and cellulose; (3) spray polyurethane foam; and (4) rigid board sheathing materials. Non-framed assemblies include wall, roof/ceiling, and floors constructed of structural insulated panels and insulated concrete forms.
p.376(a) If possible, locate the manufacturer's indoor unit + outdoor unit combination in the
p.376Energy Commission listing of systems that have been certified by the manufacturer as systems that do not operate the air distribution fan during periods when the space does not require heating or cooling, which is located at: https://www.energy.ca.gov/rules-and regulations/building-energy-efficiency/manufacturer-certification-building-equipment.
p.377Note 1: For newly constructed buildings, this procedure applies to the entire thermal envelope of the building. In many instances, residential homes will use several types of insulation material, even in the same framed assembly. Each insulation material and the integrity of air leakage control for the building's entire thermal envelope must be verified by the ECC-rater for the home to comply with the Standards.
p.376Record the result of the search for the system model(s). If the manufacturer's indoor unit + outdoor unit combination is not included in the CEC listing, then the indoor unit does not comply.
p.376(b) Switch the system to heating mode.
p.377Note 2: Structural bracing, tie-downs, and framing of steel or specialized framing used to meet structural requirements of the California Building Code (CBC) are allowed. These areas shall be called out on the building plans with diagrams and/or specific design drawings indicating the R- value amount and fastening method to be used. All structural framing areas shall be insulated in a manner that resists thermal bridging from the outside to the inside of the assembly separating conditioned from unconditioned space. The insulation and air barrier integrity shall be verified by the ECC-rater.
p.376(c) Switch on the heating system by setting the thermostat to a setpoint that is greater than
p.376the room temperature.
p.376(d) Verify the thermostat activates the indoor unit airflow.
p.376(e) Switch off the heating system by setting the thermostat to a setpoint that is less than the
p.376room temperature.
p.376(f) Verify the indoor unit air circulation fan does not operate when the compressor is off,
p.376except for a fan overrun (fan off delay) of less than 10 minutes that may occur at the end of the compressor on cycle.
p.376(g) Switch the system to cooling mode.
p.376(h) Switch on the cooling system by setting the thermostat to a setpoint that is less than the
p.376room temperature.
p.376(i) Verify the thermostat activates the indoor unit airflow.
p.376(j) Switch off the cooling system by setting the thermostat to a setpoint that is greater than
p.376the room temperature.
p.376(k) Verify the indoor unit air circulation fan does not operate the indoor fan when the
p.376compressor is off, except for a fan overrun (fan off delay) of less than 10 minutes that may occur at the end of the compressor on cycle.
p.376If the system does not operate the indoor unit air distribution fan(s) during periods when the spaces served by the system do not require heating or cooling to meet the thermostat setpoint, then the system complies.
p.376RA3.5 Quality Insulation Installation Procedures
p.376RA3.5.1 Purpose and Scope
p.376RA3.5 is a procedure for verifying the quality of insulation installation and air leakage control used in low-rise residential buildings. This procedure is to be followed by the insulation installer and an ECC-rater must verify its conformance for meeting the requirements of Sections 150.1(c) or 170.2(a)6, and 110.7of the Standards.
p.376– Residential Field Verification and Diagnostic Test Protocolsp.377
p.377Appendix RA3– Residential Field Verification and Diagnostic Test Protocols