p.519Appendix NA7 – Installation and Acceptance Requirements for Nonresidential Buildings and Covered Processes

p.519Purpose and Scope

Figure on PDF page 519
p.519 Needs alt text review

p.519This appendix defines acceptance procedures that must be completed on certain controls and equipment before the installation is deemed to be in compliance with the Standards. These requirements apply to all newly installed equipment for which there are acceptance requirements in new and existing buildings. The procedures apply to nonresidential, multifamily, hotel/motel buildings and covered processes as defined by the California Energy Commission’s Energy Efficiency Standards for Nonresidential Buildings (Standards). The purpose of the acceptance tests is to assure:

p.519(a) The presence of equipment or building components according to the specifications

p.519in the compliance documents.

p.519(b) Installation quality and proper functioning of the controls and equipment to meet

p.519the intent of the design and the Standards.

p.519Modifications and additions to these acceptance requirements needed to improve clarity or to better ensure proper installation and functionality may be approved by the Energy Commission.

p.519Introduction

Figure on PDF page 519
p.519 Needs alt text review

p.519Acceptance requirements are defined as implementation of targeted inspection checks and functional and performance testing to determine whether specific building components, equipment, systems, and interfaces between systems conform to the criteria set forth in the Standards and to related construction documents (plans or specifications). Acceptance requirements improve code compliance effectiveness and help meet the expected level of performance.

p.519Acceptance testing is not intended to take the place of commissioning or test and balance procedures that a building owner might incorporate into a building project. It is an adjunct process focusing only on demonstrating compliance with the Standards.

p.519Roles and Responsibilities

Figure on PDF page 519
p.519 Needs alt text review

p.519Individuals who perform the field testing and verification work, and provide the information required for completion of the Certificate of Acceptance documentation are not required to be licensed professionals. The person who signs the Certificate of Acceptance document to certify compliance with the acceptance requirements shall be licensed as specified in Standards Section 10-103(a)4.