JA12.3.1 Safety Requirements

p.260JA12.1 Purpose and Scope

p.260Joint Appendix JA12 provides the qualification requirements for battery energy storage system (BESS) to meet the requirements specified in Title 24, Part 6, Sections 150.1(b), 150.1(c)14 140.10, and 170.2(h) in combination with an on-site or community solar photovoltaic system, or a separate BESS. The primary function of the BESS is daily cycling for the purpose of load shifting, maximized solar self-utilization, and grid- harmonization.

p.260JA12.2 Definitions

p.260Cycling Capacity is the battery energy storage capacity in kWh available for daily cycling.

p.260Compliance Cycling Capacity is the cycling capacity in kWh of the BESS that is commissioned during the installation of the system as specified on the Certificate of Compliance. Once commissioned, the ratio between compliance cycling capacity and usable capacity shall be maintained for the life of the BESS.

p.260Field-Assembled BESS is a BESS with a combination of battery energy storage modules and inverter components that are installed to operate as a system in the field, and the combination has more than one model number.

p.260Integrated BESS is a BESS that contains both battery energy storage and inverter components and has a single model number.

p.260Reserve Level is the battery energy storage capacity in kWh in excess of the compliance cycling capacity that is available for other functions, and is not subject to the control requirements in section JA12.3.3.1(e).

p.260Usable Capacity is the battery energy storage capacity in kWh that a manufacturer allows to be used for charging and discharging.

p.260JA12.3 Qualification Requirements

p.260To qualify as a BESS for use for compliance with applicable Standards requirements and/or performance compliance credits, the BESS shall be certified to the Energy Commission to meet the following requirements:

p.260Safety Requirements

Figure on PDF page 260
p.260 Needs alt text review

p.260The BESS shall be tested in accordance with the applicable requirements specified in UL1973 and UL9540. Inverters used with BESS shall be tested in accordance with the applicable requirements in UL1741, UL1741 Supplement SA, or UL1741 Supplement SB.

p.260Appendix JA12 – Qualification Requirements for Battery Energy Storage System