NA5.7 Visual Inspection and Diagnostic Evaluation of Air Leakage After Test Failure Visual Inspection

p.5112025 Nonresidential Appendices Visual Inspection and Diagnostic Evaluation of Air Leakage After Test Failure Visual Inspection

p.5122025 Nonresidential Appendices b. All joints, interconnections, and penetrations of the continuous air barrier

Figure on PDF page 511
p.511 Needs alt text review

p.512components are identified on construction documents.

p.512c. The continuous air barrier extends on all surfaces of the building envelope

p.5111. Ensure that all temporary seals and covers for intentional openings such as at louvers, exhaust/intake vents, fireplaces, and rooftop units are properly sealed and not damaged or loosened during the construction.

p.512(walls, roof, and lowest floor).

p.512d. The continuous air barrier is designed to resist positive and negative

p.5112. Ensure that all plumbing-traps are filled with water.

p.512pressures from wind, stack effect, and mechanical ventilation.

p.5113. Ensure that all operable windows, trickle-vents, and doors are properly shut and locked.

p.512e. The compliance documents indicate the intent to verify the continuous air

p.512barrier by way of on-site visual inspection.

p.5114. Ensure that all mechanical systems are shut-off and any mechanical dampers set to the closed position.

p.5122. Inspection shall occur during construction when the continuous air barrier is accessible for a visual inspection. The entire continuous air barrier shall be inspected. The third-party entity conducting the verification shall coordinate with the construction team to schedule site visits such that the entire continuous air barrier is verified.

p.511Diagnostic Evaluation

p.5115. Identify locations with air leakage using infrared thermography or smoke pens in accordance with ASTM E1186-17, while the building is maintained at a minimum 25 Pa pressure (during pressurization) or -25 Pa (during depressurization). The following locations shall be evaluated:

p.5123. Inspection of the continuous air barrier materials and assemblies shall verify the following are installed correctly:

p.511a. The perimeter of windows and doors.

p.512a. Transitions to adjacent air barrier systems – including but not limited to roof

p.511b. Around operable window hardware and door hardware.

p.512parapet transitions, glazed framing systems to adjacent framed wall assembly transitions, plaza waterproofing to podium transitions, vertical wall to soffit transitions.

p.511c. Penetrations through the roof, wall, and floor assemblies along the plane of

p.511the intended air-barrier.

p.511d. Electrical outlets located on exterior-facing walls.

p.512b. Detailing of penetrations through air barrier systems.

p.511e. Lighting and other electrical penetrations through the roof level ceiling.

p.512c. Building assemblies used as ducts or plenums.

p.511f. Above- and below-grade vestibules.

p.512d. Contractor internal quality control/quality assurance.

p.511g. Stairs leading to unconditioned space.

p.511Reporting

Figure on PDF page 511
p.511 Needs alt text review

p.5111. Generate report in accordance with ASTM E3158 reporting instructions.

p.5112. The report shall include information on the tested building envelope area, conditioned floor area, conditioned air-by-volume, stories above grade, and air leakage rates.

p.5113. Results shall be reported at the upper 95 percent confidence interval.

p.511Verification of Continuous Air Barrier

Figure on PDF page 511
p.511 Needs alt text review

p.511An independent third-party verification shall be conducted in accordance with the following requirements:

p.5111. A design review shall be conducted to verify and document compliance with the requirements Section 140.3(a)9, specifically:

p.511a. All air barrier components are identified on construction documents.

p.511Appendix NA45– Field Verification and Diagnostic Testing of Whole Building Air Leakagep.512

p.512Appendix NA45– Field Verification and Diagnostic Testing of Whole Building Air Leakage