NA1.2 Documentation and Communication Requirements for Verification Compliance

p.4692025 Nonresidential Appendices

Table NA1-1 describes verification and diagnostic Reference Nonresidential Rater field verification and Table NA1-1 – Summarythe measures that require installer certification and testing and identifies the protocol or test procedure Appendices that shall be used for completing diagnostic testing. of Measures Requiring Field Verification andECC-Rater field in the installer and ECC- Diagnostic Testing
Measure TitleDescriptionProcedure(s)
Dwelling-Unit Mechanical Ventilation Airflow – Continuous OperationVerify that whole-building ventilation system complies with the airflow rate required by ASHRAE Standard 62.2.NA2.2.4.1
Dwelling-Unit Mechanical Ventilation Airflow – Intermittent OperationVerify that whole-building ventilation system complies with the airflow rate required by ASHRAE Standard 62.2.NA2.2.4.2
Kitchen Local Mechanical Exhaust VerificationVerify using certified performance rating data from the HVI Directory or the AHAM Directory for determining that the kitchen exhaust system complies with listed requirements.NA2.2.4.1.4
Heat Recovery Ventilation (HRV) or Energy Recovery Ventilation (ERV) Rated Performance VerificationVerify that HRV or ERV system meets or exceeds the performance required for compliance.NA2.2.4.1.5
Dwelling Unit CompartmentalizationThe purpose of this test procedure is to measure the air leakage rate through a multifamily dwelling unit enclosures measured in cubic feet per minute.NA2.3

p.469Documentation and Communication Requirements for Verification Compliance

Figure on PDF page 469
p.469 Needs alt text review

p.469The required building energy compliance features and the required field verification and diagnostic testing procedures shall be identified on a Certificate of Compliance completed in accordance with the requirements in Standards Sections 10-103(a)1 and 10-103(a)2. The builder or subcontractor shall complete all applicable Certificate of Installation documentation in accordance with the requirements in Standards Section 10-103(a)3 and the procedures described in NA1, and shall provide certification that the construction or installation complies with the applicable requirements on the Certificate of Compliance and all applicable field verification and eligibility criteria. The person responsible for the acceptance testing shall perform the required field verification and diagnostic testing and report the results on the Certificate of Acceptance documentation submitted in accordance with the requirements in Standards Section 10-103(a)4 and the procedures described in NA1, and shall provide certification that the construction or installation information reported on the Certificates of Installation are consistent with applicable requirements on the

p.469Appendix NA1– Nonresidential Verification, Testing, and Documentation Procedures