p.4502025 Residential Appendices (b) The equipment manufacturer shall certify to the Commission that water use does not
p.450exceed 7.5 gallons per ton hour based on the Title 20 Appliance Standards testing criteria.
p.450(c) Equipment shall be permanently installed (no window or portable units).
p.450(d) Installation shall provide for automatic relief of supply air from the house with maximum
p.450air velocity through the relief dampers not exceeding 800 fpm (at the Title 20 rated airflow). Pressure relief dampers and ductwork shall be distributed to provide adequate airflow through all habitable rooms. For installations with an attic, ceiling dampers shall be installed to relieve air into the attic, and then to outside through attic vents. For installations without an attic, sidewall relief dampers are acceptable.
p.450(e) To minimize water consumption, bleed systems shall not be allowed.
p.450(f) A water quality management system (either “pump out” or conductivity sensor) is
p.450required. “Pump out” systems can either be integral to the evaporative cooler or they can be accessories that operate on a timed interval. The time interval between dumps shall be set to a minimum of six hours of cooler operation. Longer intervals are encouraged if local water quality allows.
p.450RA4.4 Water Heating Measures
p.450RA4.4.1 Proper Installation of Pipe Insulation Insulation must meet the requirements specified in §150.0(j). Pipe insulation shall fit tightly to the pipe and all elbows and tees shall be fully insulated. No piping should be visible due to insulation voids with the exception of the last segment of piping that penetrates walls and delivers hot water to the sink, appliance, etc. All domestic hot water piping shall be insulated as specified in Section 609.12 of the California Plumbing Code.
p.450Pipe insulation may be omitted where hot water distribution piping is buried within attic, crawlspace or wall insulation, as described below: In attics and crawlspaces the insulation shall completely surround the pipe with at least 1 inch of insulation and the pipe shall be completely covered with at least 4 inches of insulation further away from the conditioned space. In walls, the insulation must completely surround the pipe with at least 1 inch of insulation. If burial within the insulation does not meet these specifications, then this exception does not apply, and the section of pipe not meeting the specifications must be insulated as specified in §150.0(j).
p.450RA4.4.2 The Standard Distribution System (STD)
p.450The Standard Distribution System design requires that hot water distribution piping meets the requirements of Proper Installation of Pipe Insulation R4.4.1.
p.450RA4.4.3 Thermostatic Balancing Valve
p.450To receive the thermostatic balancing valve credit, calculations shall be completed that demonstrate that the length of the return piping portion of the domestic hot water recirculation loop does not exceed 160 feet. If the domestic hot water has multiple recirculation pipe loops, the length of any hot water return pipe shall not exceed 160 feet to receive credit.
p.450– Eligibility Criteria for Energy Efficiency Measures