JA12.3.3.2.1 Basic Control

p.262(c) Discharge Behavior: During discharge, the BESS shall be programmed to first

p.262meet the electrical load of the property. If during the discharge period the electrical load of the property is less than the maximum discharge rate, the BESS shall have the capability to discharge electricity into the grid upon receipt of a demand response signal from the load serving entity or a third-party aggregator.

p.262(d) At the time of enforcement agency inspection, the BESS shall be installed and

p.262commissioned to meet one of the control strategies in JA12.3.3.2 below.

p.262The requirements below are applicable to single-family only.

p.262(e) If the cycling capacity of the BESS drops below the level of the compliance

p.262cycling capacity as a result of changes in the reserve level, the BESS shall automatically reset the cycling capacity back to the compliance cycling capacity level after 72 hours. This reset requirement does not apply to reserve level changes that are controlled by a load serving entity or the California Independent System Operator, third-party aggregator, or manufacturer due to severe weather or Public Safety Power Shutoff events. At the conclusion of the severe weather or Public Safety Power Shutoff event, the BESS shall return to the compliance cycling capacity.

p.262JA12.3.3.2 Strategy Specific Requirements

p.262BESS shall be commissioned to meet the requirements of one of the following control strategies below.

p.262JA12.3.3.2.1 Basic Control

p.262To qualify for the Basic Control strategy, when combined with an on-site solar photovoltaic system, the BESS shall only allow charging when the photovoltaic system production is greater than the on-site electrical load. The BESS shall discharge whenever the photovoltaic system production is less than the on-site electrical load.

p.262JA12.3.3.2.2 Time-of-Use (TOU) Control

p.262To qualify for the TOU Control strategy, when combined with an on-site solar photovoltaic system, the BESS shall begin discharging during the highest priced TOU hours of the day. The operation schedule shall be preprogrammed from the factory, updated remotely, or commissioned during the installation/commissioning of the system. At a minimum, the system shall be capable of programming three separate seasonal TOU schedules, such as spring, summer, and winter.

p.262JA12.3.3.2.3 Advanced Demand Flexibility Control

p.262To qualify for the Advanced Demand Flexibility Control strategy, when combined with an on-site solar photovoltaic system, the BESS shall be programmed as either Basic Control as described in JA12.3.3.2.1 or TOU control as described in JA12.3.3.2.2. The BESS shall meet the demand response control requirements specified in Section 110.12(a)1 and Section 110.12(a)2. Additionally, the BESS shall have the capability to change the charging and discharging periods in response to signals from the load serving entity or a third-party aggregator.

p.262Appendix JA12 – Qualification Requirements for Battery Energy Storage System