NA1.6.4.1 Re-sampling procedures for a “closed” group

p.4802025 Nonresidential Appendices for sampling. Systems or dwelling units completed by new subcontractors shall either be individually tested or shall be included in a new separate group for sampling.

p.480The ECC-Rater shall not notify the builder when sample testing will occur prior to the completion of the work that is to be tested, or prior to entry of the data from the Certificate of Installation.

p.480The ECC-Provider shall close a group within 6 months after the group was started/opened. When such group closure occurs, the ECC-Provider shall notify the builder or contractor and ECC-Rater that the group has been closed, and a sample shall be selected for field verification and diagnostic testing.

p.480NA1.6.4 Procedures - Re-sampling, Full Testing and Corrective Action

p.480“Re-sampling” refers to the procedure that requires testing of additional systems or dwelling units within a group when the selected sample from a group fails to comply with the verification requirements.

p.480When a failure is encountered during sample testing, the failure shall be entered into the Provider’s Data Registry. Corrective action shall be taken on the failed system and then retested to verify that corrective action was successful. Corrective action and retesting on the system shall be repeated until the testing indicates compliance and the results have been entered into the Data Registry, whereupon a registered Certificate of Verification for the system shall be made available to the ECC-Rater, the builder, the enforcement agency, and other authorized users of the Data Registry.

p.480In addition, the ECC-Rater shall conduct re-sampling to assess whether the first failure in the group is unique or if the rest of the units in the group are likely to have similar failings.

p.480NA1.6.4.1 Re-sampling procedures for a “closed” group

p.480The ECC-Rater shall randomly select for re-sampling one of the remaining untested systems or dwelling units in the group for testing.

p.480If testing in the re-sample confirms that the requirements for compliance credit are met, then the system or dwelling unit with the failure shall not be considered an indication of failure in the other units in the group. The ECC-Rater shall transmit the re-sample test results to the Data Registry, whereupon the Provider shall make available to the ECC-Rater, the builder, the enforcement agency, and other authorized users of the Data Registry, a copy of the registered Certificate of Verification for each of the remaining units in the group including the dwelling unit in the re-sample.

p.480If field verification and diagnostic testing of the second sample results in a failure, the ECC- Rater shall report the second failure to the ECC-Provider, the builder, and the enforcement agency. All systems or dwelling units in the group must thereafter be individually field verified and diagnostically tested.

p.480NA1.6.4.2 Corrective Action

p.480The builder shall take corrective action on any system or dwelling unit in the group that failed to comply when tested. In cases where corrective action would require destruction of building components, and the performance compliance method is used, the builder may

p.480Appendix NA1– Nonresidential Verification, Testing, and Documentation Procedures