RA2.4.4 Enforcement Agency

p.3062025 Residential Appendices An approved Third Party Quality Control Program shall:

p.306(a) Provide training to participating program installers, installing but not limited to

p.306contractors, subcontractors, and technicians, to ensure proficiency in:

p.306i. Quality HVAC installation procedures, common causes of failure, and corrections.

p.306ii. Understanding of the Standards requirements for field verification and diagnostic testing of measures, which are subject to TPQCP program procedures.

p.306iii. Understanding all applicable specifications for field verification and diagnostic testing procedures specified in the Reference Residential Appendices.

p.306iv. Any applicable specialized TPQCP-specific procedures.

p.306(b) Collect field verification and diagnostic test data (data) from participating installers for

p.306each installation completed,

p.306(c) Confirm the location of the system undergoing testing using an electronic tracking means

p.306such as Global Positioning System (GPS) technology,

p.306(d) Provide data checking analysis to evaluate the validity and accuracy of the collected data

p.306to independently determine whether compliance has been achieved, and to uncover invalid or erroneous information,

p.306(e) Provide real-time direction to the installer to retest and correct problems when data

p.306checking determines that compliance has not been achieved, or erroneous information is present, so that testing can be redone and corrections can be made before the installer leaves the site,

p.306(f) Ensure the installer resubmits updated data from new testing when retesting and

p.306correction is completed,

p.306(g) Maintain a database of all data submitted by participating TPQCP installers, and

p.306(h) Enable Energy Commission staff to query retained TPQCP data or documents.

p.306TPQCPs do not impose restrictions on ECC-Raters or Providers that limit their independence or ability to properly perform their functions, nor do they impose restrictions on the ECC-Rater’s use of equipment (beyond those required by the Energy Commission).

p.306Refer to RA2.7 for additional detail describing the roles and responsibilities and approval procedures for TPQCP.

p.306RA2.4.4 Enforcement Agency

p.306The enforcement agency at its discretion may require independent testing and field verification to be scheduled so that it can be completed in conjunction with the enforcement agency’s required inspections, or observe the field verification and diagnostic testing performed by builders, subcontractors or the certified ECC-Rater in conjunction with the enforcement agency’s required inspections to corroborate the results documented on the Certificate(s) of Installation and on the Certificate(s) of Verification.

p.306Appendix RA2– Residential Field Verification and Diagnostic Testing Documentation Procedures