RA3.1.4.3.7 Visual Inspection of Accessible Duct Sealing

p.3352025 Residential Appendices (a) Inject either theatrical or other non-toxic smoke into a fan pressurization device that is

p.335maintaining a duct pressure difference of 25 Pa (0.1 inches water) relative to the duct surroundings, with all grilles and registers in the duct system sealed.

p.335(b) Visually inspect all accessible portions of the duct system during smoke injection.

p.335(c) The system shall pass the test if one of the following conditions is met:

p.3351. No visible smoke exits the accessible portions of the duct system. 2. Smoke only emanates from the furnace cabinet which is gasketed and sealed by the manufacturer and no visible smoke exits from the accessible portions of the duct system.

p.335RA3.1.4.3.7 Visual Inspection of Accessible Duct Sealing

p.335The objective of this inspection in conjunction with the smoke test (RA3.1.4.3.6) is to confirm that all accessible leaks have been sealed. Visually inspect to verify that the following locations have been sealed:

p.335(a) Connections to plenums, evaporator coils, and other connections to the forced air unit.

p.335(b) Refrigerant lines, p-traps and other penetrations into the forced air unit.

p.335(c) Air handler door panel (do not use permanent sealing material, metal tape is acceptable).

p.335(d) Register boots sealed to surrounding material at all registers and grilles.

p.335(e) Connections between lengths of duct, as well as connections to takeoffs, wyes, tees, and

p.335splitter boxes.

p.335RA3.1.4.3.8 Verification of Low Leakage Ducts Located Entirely In Conditioned Space

p.335A visual inspection shall confirm the duct system location as specified by Section RA3.1.4.1.3. Additionally, ducts shall be confirmed to have less than or equal to 25 cfm leakage to outside when measured as specified by Section RA3.1.4.3.4.

p.335RA3.1.4.3.9 Verification of Low Leakage Air-Handling Unit with Sealed and Tested Duct System

p.335An additional performance compliance credit is available for verified low leakage ducts if a qualified low leakage air-handling unit is installed. The low leakage air-handling unit cabinet (furnace, or heat pump fan and inside coil) shall conform to the qualification requirements given in Reference Joint Appendix JA9 and shall be included in the list of low leakage air handling units published by the Energy Commission. The qualified air handler must be connected to a sealed and tested new duct system to receive the credit.

p.335In order to comply with this credit, the duct system shall be verified to leak less than or equal to the leakage rate specified on the Certificate of Compliance using the methods in Section RA3.1.4.3.1, and the air handler manufacturer make and model number shall be verified to be a model certified to the Energy Commission as qualified for credit as a low leakage air handler.

p.335Appendix RA3– Residential Field Verification and Diagnostic Test Protocols