RA3.1.4.3.2.1 Ducts with the Air Handling Unit Installed and Connected:

p.3322025 Residential Appendices RA3.1.4.3.2.1 Ducts with the Air Handling Unit Installed and Connected:

p.332For total leakage:

p.332(a) Verify that supply and return plenums and all the collars, connectors, transition pieces,

p.332duct boots, and return boxes have been installed. If a platform or other building cavity is used to house portions of the air distribution system, it shall contain a duct, be lined with duct board or sheet metal, and all duct connectors and transition parts shall be installed and sealed. The platform, ducts, and connectors shall be included in the total leakage test. All joints shall be inspected to ensure that no cloth backed rubber adhesive duct tape is used.

p.332(b) Seal all the supply duct boots and return boxes except for one return duct box.

p.332(c) Attach the fan flowmeter device at the unsealed return duct box.

p.332(d) Insert a static pressure probe at one of the sealed supply duct boots located close to the

p.332supply plenum or at the supply plenum.

p.332(e) Adjust the fan flowmeter to maintain a positive 25 Pa (0.1 inches water) pressure in the

p.332duct system with respect to the outside, or with respect to the building space with the entry door open to the outside.

p.332(f) Record the flow through the flowmeter; this is the leakage flow at 25 Pa (0.1 inches

p.332water).

p.332(g) Divide the leakage flow by the total air handler airflow determined by the procedure in

p.332Section RA3.1.4.2 and convert to a percentage. If the leakage flow percentage is less than or equal to the compliance criterion required by the Standards, the system passes.

p.332RA3.1.4.3.2.2 Ducts with Air Handling Unit Not Yet Installed:

p.332For total leakage:

p.332(a) Verify that supply and return plenums and all the collars, connectors, transition pieces,

p.332duct boots, and return boxes have been installed. If a platform or other building cavity is used to house portions of the air distribution system, it shall contain a duct, be lined with duct board or sheet metal, and all duct connectors and transition parts shall be installed and sealed. The platform, ducts and connectors shall be included in the total leakage test. All joints shall be inspected to ensure that no cloth backed rubber adhesive duct tape is used.

p.332(b) Supply and return leaks may be tested separately, or the supply and return plenums may

p.332be connected together using suitable temporary air-tight means to facilitate testing the total system. If the supply and return systems are to be tested separately, the opening to the supply or return plenums shall be sealed to prevent leakage unless used as the point of attachment for the fan flowmeter.

p.332(c) Seal all the supply duct boots and/or return duct boxes except for a location where the

p.332fan flowmeter device will be attached.

p.332(d) Attach the fan flowmeter device at the unsealed location.

p.332Appendix RA3– Residential Field Verification and Diagnostic Test Protocols