p.5692025 Nonresidential Appendices NA7.6.4.1 Construction Inspection
p.569Prior to functional testing, verify and document the following:
p.569(a) The construction documents specify which lighting systems shall have their
p.569maximum light output or maximum power draw set to no greater than 85 percent of full light output or full power draw.
p.569(b) The controls or the methods of controlling the maximum output of luminaires is
p.569such that the maximum light output of the controlled lighting system can be limited, and that normal operation of the controlled lighting does not override the maximum light output.
p.569(c) The controls are not readily accessible to unauthorized personnel.
p.569NA7.6.4.2 Functional Testing
p.569For each area to be tested, follow the procedures in Method 1 or Method 2 below:
p.569(a) The acceptance test technician shall either observe the first seven (7) systems being
p.569successfully tuned or shall verify systems that have already been tuned using the sampling protocol described in NA7.6.4.
p.569(b) If the acceptance test technician is observing the tuning of the system, the party
p.569responsible for the tuning shall certify that the remainder of the system is tuned in a similar manner.
p.569NA7.6.4.2.1 Method 1: Observation of the Systems During Institutional Tuning
p.569Step 1: Determination of maximum power or light output prior to institutional tuning
p.569(a) Set all lighting controls to provide maximum output of the tested system without
p.569applying the limits specified for institutional tuning.
p.569(b) Measure the full light output at a location where the illuminance is due to the
p.569controlled lighting, or measure the power draw of the controlled lighting. Current measurements may be used instead of power measurements.
p.569Step 2: Institutional Tuning and Post-tuning Measurement
p.569(a) Apply the limits specified for institutional tuning to the lighting system. Do not alter
p.569any other control settings.
p.569(b) Verify the light or power reduction after institutional tuning by measuring the light
p.569output at the same location as in Step 1 or measure the power draw of the same circuit as in Step 1. Current measurements may be used instead of power measurements.
p.569(c) If the light output or power draw measured in Step 2(b) is 85% or less of the light
p.569output or power draw measured in Step 1(b), the system passes this test; otherwise, the system fails this test.
p.569Appendix NA7 – Installation and Acceptance Requirements for Nonresidential Buildings and Covered Processes