p.5352025 Nonresidential Appendices (b) For split or packaged cooling systems with only one indoor unit, the nominal air
p.535handler airflow shall be 400 CFM per nominal ton of outdoor condensing unit cooling capacity as specified by the manufacturer.
p.535(c) For small duct high velocity systems, the nominal air handler airflow shall be 250
p.535CFM per nominal ton of outdoor condensing unit cooling capacity as specified by the manufacturer.
p.535(d) For multiple-split systems that provide cooling, the nominal air handler airflow for
p.535each indoor unit shall be 350 CFM per nominal ton of indoor unit cooling capacity as specified by the manufacturer.
p.535NA7.5.3.2.3.2 Diagnostic Duct Leakage
p.535Diagnostic duct leakage measurement shall be used by installers and ATTs to verify that duct leakage meets the compliance criteria for sealed duct systems for which acceptance testing is required. Table NA7.5.3-1 summarizes the test procedures that shall be used to demonstrate compliance.
p.535Table NA7.5.3-1 – Duct Leakage Verification and Diagnostic Test Protocols
| Case | User and Application | Procedure(s) |
|---|---|---|
| Sealed and tested new duct systems | Installer Testing ATT Testing | NA7.5.3.2.3.2.1 |
| Sealed and tested altered existing duct systems | Installer Testing ATT Testing | NA7.5.3.2.3.2.1 |
| Sealed and tested altered existing duct systems | Installer Testing and Inspection ATT Testing and Verification | NA7.5.3.2.3.2.2 NA7.5.3.2.3.2.3 NA7.5.3.2.3.2.4 |
p.535NA7.5.3.2.3.2.1 Diagnostic Duct Leakage from Fan Pressurization of Ducts
p.535The objective of this procedure is for an ATT to verify, the leakage of a new or altered duct system. The duct leakage shall be determined by pressurizing the entire duct system ducts to 25 Pa (0.1 inches water) with respect to outside. The following procedure shall be used for the fan pressurization tests:
p.535(a) Verify that the air handler, supply and return plenums and all the connectors, transition
p.535pieces, duct boots, and registers are installed, and ensure the following locations have been sealed:
p.5351. Connections to plenums and other connections to the air-handling unit.
p.5352. Refrigerant line and other penetrations into the air-handling unit.
p.5353. Air handler access door or panel (do not use permanent sealing material, metal tape is acceptable).
p.535The entire duct system including the air- handler shall be included in the test.
p.535Appendix NA7 – Installation and Acceptance Requirements for Nonresidential Buildings and Covered Processes