
Text in this table
2025 Residential Appendices RA4.4.19.3 Startup (a) Startup testing of MMV during recirculation only operation. 1. Close all hot fixtures in the domestic water system. 2. Ensure that the water heater is operational and idling with storage tank plumbed to the mixing valve and meeting the hot inlet temperature specified in the plumbing plans. 3. Start the recirculation pump and set mixed outlet temperature or setpoint temperature on the MMV. Start the circulation pump at the specified water flow rate and adjust as needed to meet recirculation return temperature specified in the plumbing plans. 4. Let distribution system warm up and stabilize for 30 minutes and adjust mixing parameters as needed to realign with values in plumbing plans. 5. Let the recirculation pump operate for three hours without any water draws to ensure there is no temperature creep. 6. If during or after the three-hour period the MMV outlet and return temperature stays elevated by greater than 2°F and doesn’t return back to the specified temperature, then make necessary adjustments to the MMV. If temperature creep persists with mechanical MMV, adjust the balancing valve as necessary on the recirculation return line leading back to the water heater to ensure average MMV outlet temperature meets the specified temperature. 7. If adjustments are made to MMV or balancing valve in Step 6, then repeat Step 5. (b) Startup testing of MMV for a combination of recirculation and hot water draws. 1. Once the MMV is operational in a closed loop, make a water draw for 10 minutes using one of the following options: A. With a shower operating at full flow at every: three dwelling units in a building with 15 or fewer dwelling units, five dwelling units in a building with 16 to 30 dwelling units, eight dwelling units in a building with 31 to 60 dwelling units, ten dwelling units in a building than 60 to 20 dwelling units, twenty dwelling units in a building with more than 200 dwelling units. B. The hot water valve on a hose bib, mop sink, or other fixture on the branch line or location on the hot water distribution line is opened to a draw volume of 1 gpm for every: three dwelling units in a building with 15 or fewer dwelling units, five dwelling units in a building with 16 to 30 dwelling units, eight dwelling units in a building with 31 to 60 dwelling units, ten dwelling units in a building than 60 to 200 dwelling units, twenty dwelling units in a building with more than 200 dwelling units. 2. Monitor recirculation return temperature on the thermometer during the 10-minute draw period and ensure design return water temperature is maintained at the specified temperature documented in the plumbing plans.
p.460– Eligibility Criteria for Energy Efficiency Measures