NA7.4.5.2 The Responsible Person or Installer Shall Meet the Following Protocols before Installation:

p.5272025 Nonresidential Appendices NA7.4.5.2 The Responsible Person or Installer Shall Meet the Following Protocols before Installation:

p.527(a) Verify the horizontal (not diagonal or vertical) distance from the front edge of the

p.527slat to the back edge of the slat matches the building plans;

p.527(b) Verify the vertical (not diagonal or horizontal) distance from the lowest edge of the

p.527slat to the highest edge of the slat below it matches the building plans;

p.527(c) Verify there is a factory installed label permanently affixed and prominently located

p.527at a mounting point of the slat to the building;

p.527(d) Verify the visible reflectance on the ASTM E903 test results matches the building

p.527plans;

p.527(e) If the horizontal slat surfaces are not opaque and free of perforations, verify that

p.527the horizontal slat’s ASTM E1175 test results match the building plans;

p.527(f) Installation of horizontal slats shall meet the manufactures installation instructions;

p.527and

p.527(g) After the installation the installer completes and signs the Declaration Statement

p.527on the Certificate of Installation. A signed copy of the Certificate(s) shall remain at the job site for verification by the building inspector.

p.527NA7.4.5.3 Field Technician or Responsible Person Shall Meet the Following Protocols After Installation:

p.527(a) Verify the Certificate of Installation and the Declaration Statement is signed before

p.527inspection of the installation;

p.527(b) Verify that horizontal slats are permanently mounted;

p.527(c) If the horizontal slats extend beyond each side of the window jamb, then verify the

p.527extension matches the length shown on the building plans;

p.527(d) If the horizontal slats do not extend beyond each side of the window jamb, then

p.527verify that the horizontal slats are entirely within the window rough opening or that fins at the window jambs match the building plans;

p.527(e) Verify that horizontal slat assemblies extend the entire height of the window;

p.527(f) Verify that exterior horizontal slats are horizontal or slope downwards from the

p.527window and that interior horizontal slats are horizontal or slope upwards from the window;

p.527(g) After horizontal slats inspection is completed, complete the Certificate of

p.527Acceptance Test, and sign the Declaration Statements of the certificate; and

p.527(h) Provide certificates and additional copies to the builder, enforcement agency and

p.527building owner at occupancy.

p.527Appendix NA7 – Installation and Acceptance Requirements for Nonresidential Buildings and Covered Processes