NA7.4.4.3 Field Technician or Responsible Person Shall Meet the Following Protocols After Installation:

p.5262025 Nonresidential Appendices NA7.4.4.3 Field Technician or Responsible Person Shall Meet the Following Protocols After Installation:

p.526(a) Verify the Certificate of Installation and the Declaration Statement is signed before

p.526inspection of the installation; and

p.526(b) If operable shading is installed on the clerestory fenestration, verify that the

p.526clerestory fenestration shading is controlled separately from other fenestration shading control.

p.526(c) After clerestory fenestration inspection is completed, complete the Certificate of

p.526Acceptance Test, and sign the Declaration Statements of the certificate; and

p.526(d) Provide certificates and additional copies to the builder, enforcement agency and

p.526building owner at occupancy.

p.526NA7.4.4.4 Documentation at Occupancy:

p.526The following documentation shall be made available to the responsible party of construction or building owner at occupancy;

p.526(a) A completed and signed copy of the Certificate of Installation and the Certificate of

p.526Acceptance Test, form(s);

p.526(b) If supplied by the manufacturer, a copy of the manufacturer’s warranty and user

p.526manual.

p.526NA7.4.5 Interior and Exterior Horizontal Slats

p.526NA7.4.5.1 Procedures

p.526These procedures detail the installation and verification protocols necessary to meet acceptance requirements of interior and exterior horizontal slats for PAF. In addition, the responsible person shall fill out the Certificate of Installation and the Certificate of Acceptance. The responsible person shall verify the horizontal slat to be installed matches the energy compliance documentation (Certificate of Compliance) and building plans. A copy of the Installation and Acceptance certificate shall be given to the building owner and the enforcement agency for their records.

p.526For buildings with up to and including seven (7) horizontal slat assemblies claiming the Interior and Exterior Horizontal Slats for PAF or RSHGC for exterior horizontal slats, all horizontal slat assemblies shall be tested. For buildings with more than seven (7) horizontal slat assemblies claiming, random sampling may be done to select the seven horizontal slat assemblies. If any of the horizontal slat assemblies in the sample group or seven horizontal slat assemblies fails the acceptance test, another group of seven horizontal slat assemblies must be tested.

p.526Each horizontal slat assembly shall be provided with documentation of visible reflectance testing per ASTM E903 and may come with documentation of visible transmittance testing per ASTM E1175. The documentation shall be located at the job site for verification by the enforcement agency.

p.526Appendix NA7 – Installation and Acceptance Requirements for Nonresidential Buildings and Covered Processes