p.5242025 Nonresidential Appendices (c) A sample (8” by 10”) of the film installed with a copy of its Performance
p.524Specification Sheet attached; and
p.524(d) 15 or more year Warranty Certificate(s).
p.524NA7.4.3 Dynamic Glazing
p.524NA7.4.3.1 Procedures
p.524These procedures detail the installation and verification protocols necessary to meet acceptance requirements of dynamic glazing. Each dynamic glazing product shall be provided with a temporary NFRC Label on the glazing or an NFRC Label Certificate to identify the thermal performance (e.g., U-factor, Solar Heat Gain Coefficient (SHGC), and Visible Transmittance (VT)) of each product being installed. The NFRC label certificate shall be located at the job site for verification by the enforcement agency. In addition, the responsible person shall fill out the Certificate of Installation and the Certificate of Acceptance, Fenestration Acceptance Certificate. The responsible person shall verify 1) the dynamic glazing to be installed matches the energy Certificate of Compliance documentation and building plans. A copy of the Installation and Acceptance certificate shall be given to the building owner and the enforcement agency for their records.
p.524NA7.4.3.2 The Responsible Person or Installer Shall Meet the Following Protocols before Installation:
p.524(a) Verify the dynamic glazing matches with building plans and Energy Compliance
p.524forms;
p.524(b) From the building plans or energy compliance forms, identify the azimuth
p.524orientation in degrees or in cardinal orientation for each of the dynamic glazing to be installed to ensure the correct dynamic glazing specifications or model are installed in the appropriate orientation;
p.524(c) Verify dynamic glazing controls if applicable matches the building plans schedule;
p.524(d) Verify NFRC’s Certified Product Directory (CPD) number if applicable;
p.524(e) If no NFRC Label Form is included, then the default values of Table 110.6-A and
p.524110.6-B in Section 110.6 of the Standards are being specified;
p.524(f) Installation of dynamic glazing shall meet the manufacturer’s installation
p.524instructions;
p.524(g) After the installation the installer completes and signs the Declaration Statement
p.524on the Installation Certificate of Installation. A signed copy of the Certificate(s) of Installation shall remain at the job site for verification by the building inspector.
p.524NA7.4.3.3 Field Technician or Responsible Person Shall Meet the Following Protocols After Installation:
p.524(a) Verify the Certificate of Installation and the Declaration Statement is signed before
p.524inspection of the installation; and
p.524Appendix NA7 – Installation and Acceptance Requirements for Nonresidential Buildings and Covered Processes