NA7.4.2.3 Field Technician or Responsible Person Shall Meet the Following Protocols After Installation:

p.5232025 Nonresidential Appendices compliance Certificate of Installation documentation and building plans, if the U- factor and SHGC values do not match refer back to the Responsible Person of the building construction or enforcement agency. Energy recompliance may have to be done and building plans updated;

p.523(d) Verify the NFRC Window Film Label Certificate is filled out and includes an

p.523NFRC’s Certified Product Directory (CPD) number;

p.523(e) List the NFRC Certified Product Directory (CPD) identification (ID) number

p.523provided on the label on the Certificate of Installation;

p.523(f) If no NFRC Label is included on the box or identification of the window film, then

p.523verify with the Responsible Person of the building construction or enforcement agency to ensure the window film is actually meets or exceeds the energy specifications before installation;

p.523(g) Installation of window films shall follow the International Window Film

p.523Association (IWFA) Visual Quality Standards for Applied Window Film (dated January 1, 2015); and

p.523(h) After the installation the installer completes and signs the Declaration Statement

p.523on the Certificate of Installation. A signed copy of the Certificate(s) of Installation shall remain at the job site for verification by the building inspector.

p.523NA7.4.2.3 Field Technician or Responsible Person Shall Meet the Following Protocols After Installation:

p.523(a) Verify the Certificate of Installation and the Declaration Statement is signed before

p.523inspection; and

p.523(b) The window film(s) label on the box matches the Certificate of Installation and

p.523building plan’s schedule, U-factor, SHGC, and VT for each of the installed window films; and

p.523(c) If any of the acceptance procedures fails, refer back to the Responsible Person,

p.523Installer, or the enforcement agency for correction; and, after correction verify failed procedures have been corrected and re-inspect again; and

p.523(d) After window film inspection, complete all parts of the Certificate of Acceptance,

p.523including the signature of the Declaration Statements; and

p.523(e) Provide certificates and additional copies to the builder, enforcement agency and

p.523building owner at occupancy.

p.523NA7.4.2.4 Documentation at Occupancy:

p.523The following documentation shall be made available to the responsible party of construction or building owner at occupancy;

p.523(a) A completed and signed Certificate of Installation and Certificate of Acceptance,

p.523form(s);

p.523(b) The IWFA Visual Quality Standards for Applied Window Film (dated January 1,

p.5232015), a copy can be obtained through www.iwfa.com;

p.523Appendix NA7 – Installation and Acceptance Requirements for Nonresidential Buildings and Covered Processes