p.6022025 Nonresidential Appendices NA7.18.3.2 Functional Testing
p.602Step 1: Measure and record environmental data at the beginning and conclusion of each test including ambient temperature, indoor temperature and barometric pressure.
p.602Step 2: Install static pressure probe in main plenum pointing into airstream induced by the test. If the test fan is on the roof, the static pressure probe will need to be connected to the measurement device at the test site with a tube long enough to make the connection.
p.602Step 3: If the test fan is mounted inside, with the building open to the outside, use the building as reference pressure. If the test fan is located on the roof, use the outside as the reference pressure.
p.602Step 4: Attach the test fan to the duct system:
p.602a) For roof top and wall mounted exhaust systems, remove the fan from the curb
p.602or opening and seal the test fan to the curb following test equipment manufacturer’s instructions, making sure the dampers are open (NOP).
p.602b) Alternatively, the test fan may be applied to a grille opening on the inside of the
p.602building following test equipment manufacturer’s instructions.
p.602Step 5: Temporarily seal the system including:
p.602a) All of the grilles on the system using masking tape and air impermeable
p.602sheeting or duck mask made for this application.
p.602b) Air handler access door or panel (do not use permanent sealing material, metal
p.602tape is acceptable).
p.602c) For systems with an air handler with supply and return plenums, the entire duct
p.602system including the air- handler shall be included in the test.
p.602Step 6: Adjust the test fan speed to maintain 25 Pa or 50 Pa at the static pressure probe location.
p.602Step 7: Record the air flow (CFM) and temperature.
p.602Step 8: Determine the nominal fan airflow using the product specifications of the installed equipment for the design static pressure.
p.602Step 9: Divide the duct leakage flow by the nominal fan flow and convert to a percentage. If the duct leakage flow percentage is equal to or less than the target compliance criterion of 6% leakage the system passes.
p.602The leakage test can be conducted at rough-in or after the grilles or registers are installed. If the leakage test is conduct at rough-in, the spaces between the grille or register boots and the wallboard shall be sealed, and at least one grille or register must be removed to verify proper sealing.
p.602For compliance with the leakage requirements in Section 160.2(b)2Ci, an ATT shall identify a group of up to three central ventilation duct systems in the building from which a sample will be selected for testing.
p.602Appendix NA7 – Installation and Acceptance Requirements for Nonresidential Buildings and Covered Processes