RA2.7.3 ECC-Provider Responsibilities

p.3182025 Residential Appendices RA2.7.3 ECC-Provider Responsibilities

p.318ECC-Providers shall conform to the following requirements:

p.318a. ECC-Providers shall assign an ECC-Rater to conduct independent field verification and

p.318diagnostic testing of the installation work performed by the participating Third Party Quality Control Program installing contractors, and to submit Certificates of Verification at the close of the sampling group.

p.318b. ECC-Providers shall notify enforcement agencies when groups close or exceed six months

p.318without closing.

p.318c. ECC-Providers shall explain, in their applications for approval by the Energy Commission, the

p.318way in which their program will work with TPQCPs.

p.318RA2.7.4 ECC-Rater Responsibilities

p.318ECC-Raters shall conform to the following requirements:

p.318a. Complete all of the responsibilities of an ECC-Rater as specified in Appendix RA2, with the

p.318b. ECC-Raters shall be independent entities from the Third Party Quality Control Program.

p.318c. If re-sampling is required, the ECC-Rater shall perform full testing and corrective action as

p.318specified in Section RA2.6.4 with the exception that re-sampling as defined in RA2.6.4 shall be completed for a minimum of one out of every thirty dwelling units from the group.

p.318RA2.7.5 Conflict of Interest Guidelines

p.318The TPQCP shall meet the requirements imposed on a ECC-Rater specified in the Energy Commission’s program regulations (Title 24, Part 1, Section 10-103.3), including the requirement to be an independent entity from the builder, the ECC-Provider, the ECC-Rater that provides independent field verifications, and the subcontractor installer as specified by Section 1673(j). However, a Third Party Quality Control Program may have business relationships with installers participating in the program to advocate or promote the program and an installer’s participation in the program, and to advocate or promote products that the Third Party Quality Control Program sells to installers as part of the Program.

p.318RA2.7.6 Conditions of TPQCP Approval

p.318Prior to approval by the Commission, the Third Party Quality Control Program shall provide a detailed explanation to the Commission of the following:

p.318a. The data that is to be collected from the installers.

p.318b. The data checking process that will be used to evaluate the validity and accuracy of the data

p.318submitted by the TPQCP installation contractors.

p.318c. The justification for why this data checking process will provide strong assurance that the

p.318installation complies.