RA2.7.2 Requirements for Data Collected by a Third Party Quality Control Program

p.3172025 Residential Appendices i. Quality HVAC installation procedures, common causes of failure, and corrections.

p.317ii. Understanding of the Standards requirements for field verification and diagnostic testing

p.317of measures, which are subject to TPQCP program procedures.

p.317iii. Understanding all applicable specifications for field verification and diagnostic testing

p.317procedures specified in the Reference Residential Appendices.

p.317iv. Any applicable specialized TPQCP-specific procedures.

p.317b. Collect field verification and diagnostic test data (data) from participating installers for each

p.317installation completed.

p.317c. Automatically confirm the location of the system undergoing testing using an electronic

p.317tracking means such as Global Positioning System (GPS) technology if available.

p.317d. Provide data checking analysis to evaluate the validity and accuracy of the collected data to

p.317independently determine whether compliance has been achieved. Data checking based on more detailed data than is required for showing compliance must be able to uncover invalid or erroneous information supplied by installers.

p.317e. Provide direction to the installer to retest and correct problems when data checking

p.317determines that compliance has not been achieved. The direction to the installer shall occur in real time so that testing can be redone, and corrections can be made before the installer leaves the site.

p.317f. Ensure the installer resubmits updated data from new testing when retesting and correction

p.317is completed.

p.317g. Maintain a database of all data submitted by all participating TPQCP installers.

p.317h. Provide functionality that enables Energy Commission staff to query retained TPQCP data or

p.317documents.

p.317i. TPQCP shall not impose restrictions on the ECC-Rater or the ECC-Provider that limit their

p.317independence, or the ability of the ECC-Rater or the ECC-Provider to properly perform their functions.

p.317j. TPQCP shall not impose restrictions on the ECC-Rater’s use of equipment beyond those

p.317required by the Energy Commission.

p.317RA2.7.2 Requirements for Data Collected by a Third Party Quality Control Program

p.317TPQCP data collection shall conform to the following requirements:

p.317a. Data shall be more detailed than the data required for showing compliance with the

p.317Standards.

p.317b. Data shall enable the TPQCP to conduct an independent check on the validity and accuracy of

p.317the installer’s claim that compliance has been achieved.

p.317c. Data shall not be alterable by the installer to indicate that compliance has been achieved

p.317when in fact compliance has not been achieved.

p.317Appendix RA2– Residential Field Verification and Diagnostic Testing Documentation Procedures