RA2.6.4.2 Re-sampling procedures for an “open” group of up to five dwellings:

p.3152025 Residential Appendices to confirm compliance for the feature that failed to comply with re-sampling. In cases where corrective action would require destruction of building components, the builder may choose to reanalyze compliance and choose different measures that will achieve compliance. In this case a new Certificate of Compliance shall be completed and submitted to the ECC-Provider, the ECC- Rater, and the enforcement agency. Even with a new Certificate of Compliance, the dwelling unit must be individually field verified and diagnostically tested. Upon verification of compliance, the ECC-Rater shall enter the test results into the ECC-Provider data registry. Whereupon the Provider shall make available to the ECC-Rater, the builder, the enforcement agency, and other authorized users of the ECC-Provider data registry, a registered copy of the Certificate of Verification for each individual dwelling in the group.

p.315RA2.6.4.2 Re-sampling procedures for an “open” group of up to five dwellings:

p.315The ECC-Rater shall randomly select for re-sampling one of the remaining untested dwelling units in the group for retesting of the feature that failed. If the failed dwelling was entered in an “open” group, and there are no other untested dwellings entered in the “open” group at the time of the failed verification, subsequent dwellings entered into the “open” group shall not receive a Certificate of Verification until a second dwelling in the “open” group is tested and successfully complies. If the subsequent testing of the second dwelling unit in the group confirms that the requirements for compliance credit are met on that unit, then the dwelling unit with the initial failure shall not be considered an indication of failure in the untested dwelling units in the group. The ECC-Rater shall transmit the compliant re-sample test results to the ECC-Provider data registry, whereupon the Provider shall make available to the ECC-Rater, the builder, the enforcement agency, and other authorized users of the ECC-Provider data registry, a registered copy of the Certificate of Verification, for the re-sampled dwelling, and the remaining not yet tested dwelling units entered in the “open” group at the time of the re-sample test, and the group shall be allowed to remain open and eligible to receive additional dwelling units. Dwelling units entered into the “open” group of up to 5 dwellings following the successful verification of the re-sampled dwelling shall receive a Certificate of Verification as a “not tested” dwelling subject to registration of the Certificate of Installation by the ECC-Provider data registry for the dwelling.

p.315If field verification and diagnostic testing of the second sample results in a failure, the ECC-Rater shall report the second failure to the ECC-Provider, the builder, and the enforcement agency, and the Provider shall require the “open” group to be “closed”. All remaining untested dwelling units entered in the group at the time of the re-sample must thereafter be individually field verified and diagnostically tested. In cases where corrective action would require destruction of building components, the builder may choose to reanalyze compliance and choose different measures that will achieve compliance. In this case, a new Certificate of Compliance shall be completed and submitted to the ECC-Provider, the ECC-Rater, and the enforcement agency. Even with a new Certificate of Compliance, the dwelling unit must be individually field verified and diagnostically tested. Upon verification of compliance, the ECC-Rater shall enter the test results into the ECC- Provider data registry. Whereupon the Provider shall make available to the ECC-Rater, the builder, the enforcement agency, and other authorized users of the ECC-Provider data registry, a registered copy of the Certificate of Verification for each individual dwelling in the group.

p.315Appendix RA2– Residential Field Verification and Diagnostic Testing Documentation Procedures