NA1.7.3 ECC-Provider Responsibilities

p.4832025 Nonresidential Appendices NA1.7.3 ECC-Provider Responsibilities

p.483ECC-Providers shall conform to the following requirements:

p.483(a) ECC-Providers shall assign an ECC-Rater to conduct independent field verification

p.483and diagnostic testing of the installation work performed by the participating Third Party Quality Control Program installing contractors, and to submit Certificates of Verification at the close of the sampling group.

p.483(b) ECC-Providers shall notify enforcement agencies when groups close or exceed six

p.483months without closing.

p.483(c) ECC-Providers shall explain, in their applications for approval by the Energy

p.483Commission, the way in which their program will work with TPQCPs.

p.483NA1.7.4 ECC-Rater Responsibilities

p.483ECC-Raters shall conform to the following requirements:

p.483(a) Complete all of the responsibilities of an ECC-Rater as specified in Appendix NA1,

p.483with the exception that sampling procedures utilized for TPQCP installations shall be limited to sampling of a “closed” group as described in Section NA1.6. However, the sample tested shall be selected and field verified from within a group of up to thirty dwelling units.

p.483(b) ECC-Raters shall be independent entities from the Third Party Quality Control

p.483Program.

p.483(c) If re-sampling is required, the ECC-Rater shall perform full testing and corrective

p.483action as specified in Section NA1.6 with the exception that re-sampling shall be completed for a minimum of one out of every thirty dwelling units from the group.

p.483NA1.7.5 Conflict of Interest Guidelines

p.483The TPQCP shall meet the requirements imposed on an ECC-Rater specified in the Energy Commission’s program regulations ( Title 24, Part 1, Section 10-103.3), including the requirement to be an independent entity from the builder, the ECC-Provider, the ECC-Rater that provides independent field verifications, and the subcontractor installer as specified by Section 1673(j). However, a Third Party Quality Control Program may have business relationships with installers participating in the program to advocate or promote the program and an installer’s participation in the program, and to advocate or promote products that the Third Party Quality Control Program sells to installers as part of the Program.

p.483NA1.7.6 Conditions of TPQCP Approval

p.483Prior to approval by the Commission, the Third Party Quality Control Program shall provide a detailed explanation to the Commission of the following:

p.483(a) The data that is to be collected from the installers.

p.483(b) The data checking process that will be used to evaluate the validity and accuracy of

p.483the data submitted by the TPQCP installation contractors.

p.483(c) The justification for why this data checking process will provide strong assurance that

p.483the installation actually complies.

p.483Appendix NA1– Nonresidential Verification, Testing, and Documentation Procedures