p.481Third Party Quality Control Programs
p.481The Energy Commission may approve Third Party Quality Control Programs (TPQCP) to verify the work of participating installers, collect and evaluate more detailed data than necessary for compliance, identify in real time during the installation invalid and inaccurate installer testing and noncompliant installations, and enable corrected testing with the goal of bringing installations into compliance before the installer leaves the job site. TPQCP personnel and participating TPQCP installation contractors do not have the authority to sign Certificate of Verification documentation as an ECC-Rater.
p.481NA1.7.1 Third Party Quality Control Program Responsibilities
p.481An approved Third Party Quality Control Program shall:
p.481(a) Provide training to participating program installers (including contractors, subcontractors,
p.481and technicians) to ensure proficiency in:
p.481i. Quality HVAC installation procedures, common causes of failure, and corrections.
p.481ii. Understanding of the Standards requirements for field verification and diagnostic
p.481testing of measures, which are subject to TPQCP program procedures
p.481iii. Understanding all applicable specifications for field verification and diagnostic testing
p.481procedures specified in the Reference Residential Appendices.
p.481iv. Any applicable specialized TPQCP-specific procedures.
p.481(b) Collect field verification and diagnostic test data (data) from participating installers for
p.481each installation completed.
p.481Appendix NA1– Nonresidential Verification, Testing, and Documentation Proceduresp.482
p.4822025 Nonresidential Appendices (c) Automatically confirm the location of the system undergoing testing using an electronic
p.482tracking means such as Global Positioning System (GPS) technology if available.
p.482(d) Provide data checking analysis to evaluate the validity and accuracy of the collected
p.482data to independently determine whether compliance has been achieved. Data checking based on more detailed data than is required for showing compliance must be able to uncover invalid or erroneous information supplied by installers.
p.482(e) Provide direction to the installer to retest and correct problems when data checking
p.482determines that compliance has not been achieved. The direction to the installer shall occur in real time so that testing can be redone, and corrections can be made before the installer leaves the site.
p.482(f) Ensure the installer resubmits updated data from new testing when retesting and
p.482correction is completed.
p.482(g) Maintain a database of all data submitted by all participating TPQCP installers.
p.482(h) Provide functionality that enables Energy Commission staff to query retained TPQCP
p.482data or documents.
p.482(i) TPQCP shall not impose restrictions on the ECC-Rater or the ECC-Provider that limit
p.482their independence, or the ability of the ECC-Rater or the ECC-Provider to properly perform their functions.
p.482(j) TPQCP shall not impose restrictions on the ECC-Rater’s use of equipment beyond
p.482those required by the Energy Commission.