NA5.4 Run Preliminary Test

p.509Run Preliminary Test

Figure on PDF page 509
p.509 Needs alt text review

p.509Pressurize the building to 75 Pa to approximate if building is expected to pass test and to confirm that pre-test set up is complete and that temporary sealing stays in place while under pressure.

p.509Enclosure Measurement Procedures

Figure on PDF page 509
p.509 Needs alt text review

p.509NA5.5.1 Pressurization Test

p.5091. Reference ASTM E3158-18 for Whole Building Air Leakage Testing.

p.5092. Record interior and exterior weather conditions.

p.5093. Record average wind speeds.

p.5094. Record interior and exterior temperatures before the testing begins.

p.5095. Record site elevation in feet above sea level.

p.5096. Measure bias pressures with fans off and covered.

p.5097. Perform a multi-point pressurization test from at least +25 to +50 Pa (leakage is reported at 75 Pa, as attained or extrapolated).

p.5098. Record a minimum of 5 points between minimum and maximum induced pressures.

p.5099. Measure bias pressures at end of multi-point test with fans off and covered.

p.50910.Record interior and exterior temperatures.

p.50911.If the pressure exponent n is less than 0.45 or greater than 1.0 per Section 9.5.1 of ASTM E3158-18, then the pressurization test is invalid and shall be repeated.

p.509Appendix NA45– Field Verification and Diagnostic Testing of Whole Building Air Leakagep.510

p.5102025 Nonresidential Appendices NA5.5.2 Depressurization Test