p.472NA1.3.1 Builder

p.472The builder shall make arrangements for submittal of a copy of the Certificate of Compliance, for buildings with features requiring verification, to the ECC-Provider. The builder shall make arrangements for the services of a certified ECC-Rater prior to installation of the features, so that once the installation is complete the ECC-Rater has ample time to complete the field verification and diagnostic testing without delaying final approval of occupancy for the building permit by the enforcement agency. The builder shall

p.472Appendix NA1– Nonresidential Verification, Testing, and Documentation Proceduresp.473

p.4732025 Nonresidential Appendices make available to the ECC-Rater a copy of the Certificate of Compliance that was approved/signed by the principal designer or owner and submitted to the enforcement agency.

p.473The builder’s employees or subcontractors responsible for the installation shall perform diagnostic testing, as specified in Reference Nonresidential Appendix NA1.4, NA1.5 and NA2, and shall complete and sign the Certificate of Installation and Certificate of Acceptance to certify the diagnostic testing results and that the installation work meets the requirements for compliance as shown on the Certificate of Compliance. The builder or subcontractor shall post a copy of the Certificate of Installation and Certificate of Acceptance at the construction site for review by the enforcement agency, in conjunction with requests for final inspection. Alternatively, contingent upon approval of a Nonresidential Data registry, the enforcement agency may elect to view the certificates on an approved Data Registry. The builder or subcontractor shall also make available a completed signed copy of the Certificate of Installation and Certificate of Acceptance to the ECC-Rater.

p.473If the builder chooses to utilize group sampling for verification compliance, the builder, the builder’s authorized representative, or the ECC-Rater shall identify the units to be included in the sample group for field verification and diagnostic testing. The ECC-Rater, with no direction from the installer or builder, shall randomly select one system from a sample group for field verification and diagnostic testing upon receiving the builder’s or builder representative’s request for verification of that group. The builder or the ECC-Rater shall arrange for registered copies of all Certificates of Verification to be posted at the building site for review by the enforcement agency in conjunction with requests for final inspection for each individual system. Alternatively, the enforcement agency may elect to view the certificates on an approved Data Registry.

p.473The builder shall leave in the building, for the building owner at occupancy, copies of all compliance, operating, maintenance, and ventilation information specified in applicable sections of Title 24, Part 1, Section 10-103(b).