NA1.3.4 Enforcement Agency

p.4752025 Nonresidential Appendices i. Quality HVAC installation procedures, common causes of failure, and corrections.

p.475ii. Understanding of the Standards requirements for field verification and diagnostic

p.475testing of measures, which are subject to TPQCP program procedures.

p.475iii. Understanding all applicable specifications for field verification and diagnostic

p.475testing procedures specified in the Reference Residential Appendices.

p.475iv. Any applicable specialized TPQCP-specific procedures.

p.475(b) Collect field verification and diagnostic test data (data) from participating installers for

p.475each installation completed,

p.475(c) Confirm the location of the system undergoing testing using an electronic tracking

p.475means such as Global Positioning System (GPS) technology,

p.475(d) Provide data checking analysis to evaluate the validity and accuracy of the collected

p.475data to independently determine whether compliance has been achieved, and to uncover invalid or erroneous information,

p.475(e) Provide real-time direction to the installer to retest and correct problems when data

p.475checking determines that compliance has not been achieved, or erroneous information is present, so that testing can be redone and corrections can be made before the installer leaves the site,

p.475(f) Ensure the installer resubmits updated data from new testing when retesting and

p.475correction is completed,

p.475(g) Maintain a database of all data submitted by participating TPQCP installers, and

p.475(h) Enable Energy Commission staff to query retained TPQCP data or documents.

p.475TPQCPs do not impose restrictions on ECC-Raters or Providers that limit their independence or ability to properly perform their functions, nor do they impose restrictions on the ECC-Rater’s use of equipment (beyond those required by the Energy Commission).

p.475Refer to NA1.7 for additional detail describing the roles and responsibilities and approval procedures for TPQCP.

p.475NA1.3.4 Enforcement Agency

p.475The enforcement agency, at its discretion, may require independent testing and field verification to be scheduled so that it can be completed in conjunction with the enforcement agency’s required inspections. The enforcement agency may also require that it observe the diagnostic testing and field verification performed by builders or subcontractors and the certified ECC-Rater in conjunction with the enforcement agency’s required inspections to corroborate the results documented on the Certificate of Installation, Certificate of Acceptance, and the Certificate of Verification.

p.475For buildings for which field verification and diagnostic testing is required for compliance, the enforcement agency shall not approve a building for occupancy until the enforcement agency has received a completed Certificate of Installation and Certificate of Acceptance that has been signed by the builder/owner or installing subcontractor, and a completed registered copy of the Certificate of Verification that has been made available by the ECC- Provider Data Registry. The Certificates shall be posted at the building site for review by the enforcement agency in conjunction with requests for final inspection. Alternatively,

p.475Appendix NA1– Nonresidential Verification, Testing, and Documentation Procedures