JA4.2 Roofs and Ceilings (part 2 of 2)

p.1062025 Joint Appendices Appendix JA25 U-factors are selected from Column A of this table when there is no continuous insulation. When continuous insulation is installed either at the ceiling or at the roof, then U-factors from other columns may be selected. The continuous insulation is typically a rigid polystyrene or polyisocyanurate foam insulation, but can also include mineral wool or other suitable materials.

p.1082025 Joint Appendices Appendix JA27

p.1102025 Joint Appendices Appendix JA29

p.1122025 Joint Appendices Appendix JA31

p.105Appendix JA24 Table 4.2.5 – Continued U-factors of Metal Framed Rafter Roofs – 24 in. OC Spacing

p.109Appendix JA28 Table 4.2.7 – Continued U-factors for Metal Building Roofs - Standing Seam Roof with Single Layer of Insulation Draped over Purlins and Compressed. Thermal blocks at supports.2

p.111Appendix JA30 Notes:

p.113Assumptions: Data in Column A of this table is taken from the ASHRAE/IESNA Standard 90.1-2004, Appendix A. The data is also published in the NAIMA Compliance for Metal Buildings, 1997.

Figure 4.2.6 – Span Deck and Concrete Roof Assumptions: These calculations are made using the parallel path method documented in the 2009 ASHRAE Handbook of Fundamentals. The assembly is assumed to consist of an exterior air film of R-0.17, a single ply roofing membrane (R-0.15), protective board (R­ 1.06), continuous insulation (if any), concrete topping with a density of 120 lb/ft and an R- value of 0.11 per inch (if any), metal span deck (negligible), and fireproofing (R-0.88). While a suspended ceiling typically exists below the structure, this is not considered part of the construction assembly therefore the same U-values are used for assemblies with or without suspended ceilings. The fireproofing is assumed to be equivalent to 60 lb/ft3 concrete with a resistance of 0.44 per inch.
Figure 4.2.6 – Span Deck and Concrete Roof Assumptions: These calculations are made using the parallel path method documented in the 2009 ASHRAE Handbook of Fundamentals. The assembly is assumed to consist of an exterior air film of R-0.17, a single ply roofing membrane (R-0.15), protective board (R­ 1.06), continuous insulation (if any), concrete topping with a density of 120 lb/ft and an R- value of 0.11 per inch (if any), metal span deck (negligible), and fireproofing (R-0.88). While a suspended ceiling typically exists below the structure, this is not considered part of the construction assembly therefore the same U-values are used for assemblies with or without suspended ceilings. The fireproofing is assumed to be equivalent to 60 lb/ft3 concrete with a resistance of 0.44 per inch. — p.108
Figure 4.2.9 –Insulated Metal Panel Roofs
Figure 4.2.9 –Insulated Metal Panel Roofs — p.115
Table 4.2.5 – U-factors of Metal Framed Rafter Roofs – 16 in. OC Spacing p.104 Download CSV
R-Value of Insulation Between FramingNominal Framing SizeR-0R-2R-4R-6R-7R-8R-10R-14
NoneAny0.3250.1970.1410.1100.0990.0900.0760.059
R-1122x40.1290.1030.0850.0730.0680.0630.0560.046
R-1322x40.1210.0970.0820.0700.0660.0610.0550.045
R-1522x40.1150.0930.0790.0680.0640.0600.0530.044
R-192,32x40.1210.0970.0820.0700.0660.0610.0550.045
R-112x60.1230.0990.0820.0710.0660.0620.0550.045
R-132x60.1150.0930.0790.0680.0640.0600.0530.044
R-1522x60.1010.0840.0720.0630.0590.0560.0500.042
R-1922x60.1000.0830.0710.0630.0590.0560.0500.042
R-1922x80.0960.0810.0690.0610.0570.0540.0490.041
R-212x80.0930.0780.0680.0600.0560.0530.0480.040
R-252x100.0840.0720.0630.0560.0530.0500.0460.039
R-3042x100.0790.0680.0600.0540.0510.0480.0440.038
R-302x120.0760.0660.0580.0520.0500.0470.0430.037
R-38 42x120.0710.0620.0550.0500.0470.0450.0420.036
R-38 42x140.0680.0600.0530.0480.0460.0440.0400.035
R-Value of Insulation Between FramingNominal Framing SizeR-0R-2R-4R-6R-7R-8R-10R-14
NoneAny0.3220. 1700.1410.1100.0990.0900.0760.058
R-1122x40.1110.0910.0770.0670.0620.0590.0530.043
R-1322x40.1020.0850.0720.0630.0600.0560.0500.042
R-1522x40.0960.0810.0690.0610.0570.0540.0490.041
R-192,32x40.1020.0850.0720.0630.0600.0560.0500.042
R-112x60.1070.0880.0750.0650.0610.0580.0520.043
R-132x60.0990.0830.0710.0620.0580.0550.0500.041
R-1522x60.0860.0730.0640.0570.0540.0510.0460.039
R-1922x60.0830.0710.0620.0550.0520.0500.0450.038
R-1922x80.0800.06900.0610.0540.0510.0490.0440.038
R-212x80.0760.0660.0580.0520.0500.0470.0430.037
R-252x100.0680.0600.0530.0480.0460.0440.0400.035
R-3042x100.0630.0560.0500.0460.0440.0420.0390.033
R-302x120.0610.0540.0490.0450.0430.0410.0380.033
R-3842x120.0550.0500.0450.0410.0400.0380.0350.031
R-3842x140.0530.0480.0440.0400.0390.0370.0350.030
Table 4.2.6 –U-factors for Span Deck and Concrete Roofs – with Fireproofing p.107 Download CSV
Concrete Topping Over Metal DeckNoneR-4R-6R-8R-10R-12R-15R-20R-25R-30
None0.3480.1450.1130.0920.0780.0670.0560.0440.0360.030
2 in.0.3240.1410.1100.0900.0760.0660.0550.0430.0360.030
4 in.0.3020.1370.1070.0880.0750.0650.0550.0430.0350.030
6 in.0.2830.1330.1050.0870.0740.0640.0540.0420.0350.030
Figure on PDF page 112
p.112 Needs alt text review
Figure 4.2.5 – Metal Framed Rafter Roof
Figure 4.2.5 – Metal Framed Rafter Roof — p.106
Table 4.2.8 – U-factors for Insulated Ceiling with Removable Panels p.113 Download CSV
R-value of Insulation Over Suspended CeilingU-factor
None0.304
70.152
110.132
130.126
190.113
210.110
220.109
300.102
380.098
490.094
600.092
Table 4.2.9 – U-factors of Insulated Metal Panel Roofs and Ceilings p.114 Download CSV
Panel ThicknessU-factor (Btu/0F-ft2) A
2”0.079
2 ½”0.064
3”0.054
4”0.041
5”0.033
6”0.028
Table 4.2.6 – Continued U-factors for Span Deck and Concrete Roofs – without p.107 Download CSV
Concrete Topping Over Metal DeckNoneR-4R-6R-8R-10R-12R-15R-20R-25R-30
None0.5030.1670.1250.1000.0830.0710.0590.0450.0370.031
2 in.0.4520.1610.1220.0980.0820.0700.0580.0450.0370.031
4 in.0.4120.1560.1190.0960.0800.0690.0570.0450.0360.031
6 in.0.3770.1500.1160.0940.0790.0680.0570.0440.0360.031

p.1100.022

p.1100.019

p.1100.022

p.1100.019

Figure 4.2.7 – Metal Building Roofs
Figure 4.2.7 – Metal Building Roofs — p.112

p.106Assumptions: These data are calculated using the zone calculation method documented in the 2009 ASHRAE Handbook of Fundamentals. These calculations assume an exterior air film of R-0.17, asphalt shingles of R-0.44 (AR02), building paper of R-0.06 (BP01), 1⁄2 inch of wood based sheathing (Custom), the insulation / framing layer, 1⁄2 inch gypsum of R-0.45 (GP01), and an interior air film (heat flow up diagonally) of R-0.62 The continuous insulation may either be located at the ceiling or over the structural deck. The thickness of framing members is assumed to be 3.50, 5.50, 7.25, 9.25, and 11.25 inch for 2x4, 2x6, 2x8, 2x10, and 2x12 nominal sizes. High-density batt insulation is assumed to be 8.5 in. thick for R-30 and 10.5 in thick for R-38. Framing spacing is 10 percent for 16 inches on center and 7 percent for 24 inches on center. Steel framing has 1.5 inch flange and is 0.075 inch thick steel with no knockouts. U-factors calculated using EZ Frame 2.0.

Figure 4.2.8 – Insulated Ceiling with Removable Panels
Figure 4.2.8 – Insulated Ceiling with Removable Panels — p.113
Table 4.2.7 – Continued U-factors for Metal Building Roofs - Filled Cavity with Thermal p.110 Download CSV
R-Value of InsulationOverall U- Factor for Entire Base Roof AssemblyR-6R-9R-13R-15R-19R-22R-25R-32R-38
R10 + R­ 190.0410.0330.0300.0270.0250.0230.0220.0200.0180.016
Table 4.2.7 – U-factors for Metal Building Roofs - Screw Down Roofs with no Thermal p.108 Download CSV
R-Value of InsulationOverall U- Factor for Entire Base Roof AssemblyR-6R-9R-13R-15R-19R-22R-25R-32R-38
R-100.1840.0870.0690.0540.0490.0410.0360.0330.0270.023
R-110.1820.0870.0690.0540.0490.0410.0360.0330.0270.023
R-130.1740.0850.0680.0530.0480.0400.0360.0330.0260.023
R-160.1570.0810.0650.0520.0470.0390.0350.0320.0260.023
R-190.1510.0790.0640.0510.0460.0390.0350.0320.0260.022
R-Value of InsulationOverall U- Factor for Entire Base Roof AssemblyR-6R-9R-13R-15R-19R-22R-25R-32R-38
None1.2800.1470.1020.0730.0630.0510.0440.0390.0310.026
R-100.1150.0680.0570.0460.0420.0360.0330.0300.0250.021
R-110.1070.0650.0550.0450.0410.0350.0320.0290.0240.021
R-130.1010.0630.0530.0440.0400.0350.0310.0290.0240.021
R-160.0960.0610.0520.0430.0390.0340.0310.0280.0240.021
R-190.0820.0550.0470.0400.0370.0320.0290.0270.0230.020
R-Value of InsulationOverall U- Factor for Entire Base Roof AssemblyR-6R-9R-13R-15R-19R-22R-25R-32R-38
R-10 + R­ 100.0880.0580.0490.0410.0380.0330.0300.0280.0230.020
R-10 + R­ 110.0860.0570.0480.0410.0380.0330.0300.0270.0230.020
R-11 + R­ 110.0850.0560.0480.0400.0370.0330.0300.0270.0230.020
R-10 + R­ 130.0840.0560.0480.0400.0370.0320.0290.0270.0230.020
R-11 + R­ 130.0820.0550.0470.0400.0370.0320.0290.0270.0230.020
R-13 + R­ 130.0750.0520.0450.0380.0350.0310.0280.0260.0220.019
R-10 + R­ 190.0740.0510.0440.0380.0350.0310.0280.0260.0220.019
R-11 + R­ 190.0720.0500.0440.0370.0350.0300.0280.0260.0220.019
R-13 + R­ 190.0680.0480.0420.0360.0340.0300.0270.0250.0210.019
R-16 + R­ 190.0650.0470.0410.0350.0330.0290.0270.0250.0210.019
R-19 + R­ 190.0600.0440.0390.0340.0320.0280.0260.0240.0210.018

p.113Figure 4.2.8 – Insulated Ceiling with Removable Panels

p.104Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.105

p.105Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.106

p.106Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.107

p.107Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.108

p.108Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.109

p.109Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.110

p.110Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.111

p.111Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.112

p.112Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.113

p.113Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.114

p.114Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.115

p.115Appendix JA4 – U-factor, C-factor, and Thermal Mass Data