JA4.1.2 California Energy Commission Approved Software

p.84California Energy Commission approved software used for performance or prescriptive calculations may make adjustments to the data contained in this appendix to account for the special circumstances of particular constructions. This section defines the rules for making these adjustments. These adjustments may not be made when the tables are used manually. Software may have input screens where the user may choose a construction by entering the cavity insulation (or insulation penetrated by framing); the continuous insulation; and other factors such as framing spacing. To the software user, the process of using these tables may look very much like a traditional U-factor calculation.

p.84JA4.1.2.1 Determining R-value and U-factor of Construction Assemblies

p.84The installer shall provide documentation from the manufacturer supporting the installed R-value. Some products have R-value markings, others do not. For site applied insulation (i.e., loose-fill glass fiber and mineral fiber, cellulose, and spray polyurethane foam insulation), the insulation shall be installed in conformance to the manufacturer’s coverage chart, R-value chart, or similar performance data sheet.

p.84Data presented in the tables is not inclusive of all materials or combinations of materials used in construction of residential and nonresidential buildings. Information presented for framed and nonframed assemblies provides a summary of the reference assembly components representing the R-value and U-factor necessary for determining prescriptive compliance with the Standards. This data is also used by approved compliance software to establish the required thermal efficiencies affecting energy use for the standard design building in performance compliance calculations.

p.84R-value is used to describe insulation effectiveness, but R-value does not describe the overall performance of the complete assembly. Construction assemblies usually have more than one layer and each layer has its own conductance, or rate of heat transfer. The U-factor more fully describes the conductance of every component of the construction assembly.

p.84The prescriptive compliance table values for framed and nonframed assemblies of wood and steel roof and ceilings, walls, and floors are developed from series and parallel path procedures of the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE). Approved computer software uses more detailed calculations and must be used for all buildings using mass type construction. Prescriptive compliance can be demonstrated when the insulation’s R-value is equal to or greater than the R- value required for the envelope feature in the climate zone which the building is permitted for construction; or has an overall U-factor equal to or less than the U-factor required for the envelope feature in the climate zone which the building is permitted for construction.

p.84For example, the R-value and U-factor of components within assemblies of wood framing that are not represented in the tables can be calculated using the procedure shown below (i.e., substituting for different components). For example, R-values of different insulation types can be inserted into Table 4.1.1 and the assembly’s overall R-value and U-factor can be determined. Each layer of the assembly is entered in sequence at a cross-section through its cavity, from outside to inside.

p.84Appendix JA4 – U-factor, C-factor, and Thermal Mass Datap.85

p.85For more advanced assemblies, and for steel framed assemblies, within the California Building Code Compliance software (CBECC) for both residential and nonresidential buildings, the Energy Commission has developed an assembly calculator to automate ASHRAE procedures in order to help the building community in calculating R-values and U-factors of wood and metal framed assemblies with a higher degree of accuracy and speed. The output forms of this program can be used as part of a residential or nonresidential building permit submittal.

p.85Table 4.1.1 U-Factor Calculations for Wood Framed Assembly

p.85Assembly Type: Wall 2x4 16 in. o.c

p.85R-Value R-Value

p.85Framing Material: WoodA -­ -­

p.85Assembly Components Cavity (Rc) Frame (Rf)

p.85Outside air film 0.17 0.17

p.853/8 inch 2-coat stucco 0.08 0.08

p.851 inch, R-4 EPS insulating sheathing

p.854.0 4.0

p.85Building paper (felt) 0.06 0.06

p.85R-15 insulation 15 -­

p.852x4 inch doug fir framing @ R­ 0.99 per inch -­ 3.47

p.850.50 inch gypsum board 0.45 0.45

p.85Inside air film 0.68 0.68

p.85Subtotal 20.44 8.91 A. [ 1/Rc x (1 – (Frame% / 100)) ] + [ (1/Rf) x (Frame% / 100) ] = Assembly U-Factor, where: Frame percentage (%) determined by Table 4.1.6