JA13.3.2 Minimum Performance Requirements

p.2672025 Joint Appendices

p.2682025 Joint Appendices

p.267conform to UL 60730-1, ASSE 1082, or ASSE 1084.

p.2683. Return to Standard Operation: The System terminates any demand management function and returns to user-selected standard operation mode until the next demand management function is activated;

p.267Minimum Performance Requirements

Figure on PDF page 267
p.267 Needs alt text review

p.267The installed System shall meet or exceed the following performance specifications:

p.2684. Light Shed: The System will defer complete recovery for the duration of the shed event unless user needs cannot be met; The water heater shall avoid use of electric resistance elements during and immediately after the event unless user needs cannot be met;

p.267(a) Efficiency: meet all requirements of the Northwest Energy Efficiency

p.267Alliance (NEEA) Advanced Water Heater Specification Tier 3 or higher.

p.267(b) Thermal storage: comply with the first hour rating requirements in the

p.2685. Deep Shed: same as Light Shed, but the System will completely avoid use of electric resistance elements during the event; and

p.267following table (Chapter 5, Table 501.1(2) in 2025 California Plumbing Code):

p.2686. Full Shed: same as Light Shed, but the System will completely avoid use of both compressor and electric resistance element during the event.

Feature (Requirement)ABCDEFGHIJK
Number of bathrooms1 to 1.51 to 1.51 to 1.52 to 2.52 to 2.52 to 2.52 to 2.53 to 3.53 to 3.53 to 3.53 to 3.5
Number of bedrooms12323453456
First Hour Rating Required (gallons)3849494962627462747474

p.268The demand management signals may be sent from a local utility, a remote aggregator, a local demand manager (e.g., local time-of-use demand manager) or be internal to the System (e.g., internal schedule- or price-based demand management).

p.268The “Advanced Load Up” function shall only be enabled by a deliberate action of the user through the system’s physical or remote interface upon enrolling in a utility’s demand response program. The “Advanced Load Up” function shall be capable of being disabled deliberately by the user, or remotely by the utility or third-party service provider without deliberate action by the user.

p.267Control Requirements

Figure on PDF page 267
p.267 Needs alt text review

p.267The requirements below are applicable to all control strategies:

p.267(a) Time-of-use schedules: The System shall have the capability of storing a

p.268For a water heater sized in accordance with JA13.3.2(b) and with the default set point as shipped from the manufacturer, the System shall be able to shift:

p.267minimum of five time-of-use schedule(s) locally, each supporting a minimum of five distinct time periods for both weekdays and weekends, at least three separate seasonal schedules, and daylight savings time changes. The System shall support both local and remote setup, selection, and update of time-of-use schedules. Local and remote setup, selection, and update shall be possible through a user interface (such as an app).

p.268• A minimum of 0.5 kWh of user electrical energy per (Basic Load Up + Light Shed) event; and

p.268• A minimum of 1 kWh of user electrical energy per (Advanced Load Up + Light Shed) event, including at least 0.5 kWh on Advanced Load Up.

p.267(b) Demand management functionality

p.268(c) Non-standard mode exception: The demand management functionality

p.267Upon receiving a demand management price or dispatch signal, the System shall be capable of all the following automatic event responses:

p.268shall be achieved in all user-selected modes except for vacation and off modes, which are deemed non-standard modes. The System shall return to the previous standard operation mode once the water heater exits from a non-standard mode.

p.2671. Basic Load Up: The System will store extra thermal energy without exceeding the user set point temperature. It will avoid use of electric resistance elements unless user needs cannot be met;

p.268(d) Local time management: In the event of a loss of power, the System

p.268settings, including operating mode, time-of-use schedules, and local clock, shall be retained, or reacquired, for at least three months. The local clock shall have a maximum drift of less than 5 minutes per year under standard operating conditions and without requiring remote connectivity.

p.2672. Advanced Load Up: The System stores extra thermal energy, where some or all of the tank may exceed the set point temperature chosen by the user, within safe operating conditions. Advanced Load Up must only be enabled after agreement by the user and utility as defined below. It will avoid use of electric resistance elements unless user needs cannot be met. Advanced Load Up will only be available in Advanced Demand Response Control mode as defined in JA13.3.3.2;

p.268(e) Override and permanent disabling: The System shall provide local and

p.268remote means for the user to override or permanently disable the demand management functions. The override shall be temporary and have a maximum duration of 72 hours. Permanent disabling shall not be available

p.267Appendix JA13 – Qualification Requirements for Heat Pump Water Heater Demand Management Systemp.268

p.268Appendix JA13 – Qualification Requirements for Heat Pump Water Heater Demand Management System