JA12.3.3.2 Strategy Specific Requirements

p.262JA12.3.3.2 Strategy Specific Requirements

p.262BESS shall be commissioned to meet the requirements of one of the following control strategies below.

p.262JA12.3.3.2.1 Basic Control

p.262To qualify for the Basic Control strategy, when combined with an on-site solar photovoltaic system, the BESS shall only allow charging when the photovoltaic system production is greater than the on-site electrical load. The BESS shall discharge whenever the photovoltaic system production is less than the on-site electrical load.

p.262JA12.3.3.2.2 Time-of-Use (TOU) Control

p.262To qualify for the TOU Control strategy, when combined with an on-site solar photovoltaic system, the BESS shall begin discharging during the highest priced TOU hours of the day. The operation schedule shall be preprogrammed from the factory, updated remotely, or commissioned during the installation/commissioning of the system. At a minimum, the system shall be capable of programming three separate seasonal TOU schedules, such as spring, summer, and winter.

p.262JA12.3.3.2.3 Advanced Demand Flexibility Control

p.262To qualify for the Advanced Demand Flexibility Control strategy, when combined with an on-site solar photovoltaic system, the BESS shall be programmed as either Basic Control as described in JA12.3.3.2.1 or TOU control as described in JA12.3.3.2.2. The BESS shall meet the demand response control requirements specified in Section 110.12(a)1 and Section 110.12(a)2. Additionally, the BESS shall have the capability to change the charging and discharging periods in response to signals from the load serving entity or a third-party aggregator.