p.370RA3.4.3 Time Delay Relay Verification Procedure
p.370When a system rating specification includes a time delay relay, the installation of the time delay relay shall be verified.
p.370The procedure shall be:
p.370(a) Turn the thermostat down until the compressor and indoor fan are both running.
p.370(b) Turn the thermostat up so the compressor stops running.
p.370(c) Verify that the indoor fan continues to run for at least 30 seconds.
p.370RA3.4.4 HVAC System Verification Procedures
p.370This section defines procedures for field verification of installed HVAC systems.
p.370RA3.4.4.1 Rated Space Conditioning System Equipment Verification Procedure
p.370When installation of specific matched system equipment is necessary for compliance with requirements for higher than minimum values for system HSPF2, SEER2, or EER2, the installed system equipment shall be verified according to the procedure specified in this section. The verification shall utilize certified rating data from the AHRI Directory of Certified Product Performance at http://www.ahridirectory.org http://www.ahridirectory.org or another directory of certified product performance ratings approved by the Energy Commission for determining compliance.
p.370The procedure shall consist of visual verification of installation of the following system equipment components and confirmation that the installed equipment is rated to achieve the required HSPF2, SEER2 or EER2 rating:
p.370(a) The manufacturer name and the model number of the outdoor unit or package unit.
p.370(b) The manufacturer name and the model number of the inside coil if applicable.
p.370(c) The name of the product directory used to certify the system performance.
p.370(d) The certification number of the installed system if certification numbers for listed
p.370products are published by the product directory.
p.370(e) The HSPF2, SEER2 or EER2 value published by the product directory.
p.370(f) The manufacturer name and the model of the furnace or air handler when a specific
p.370furnace or air handler is necessary to achieve the SEER2, or EER2 rating.
p.370(g) The specified metering device when a specific refrigerant metering device (such as a TXV
p.370or an EXV) is necessary to achieve the high efficiency rating.
p.370(h) When a system rating specification includes a time delay relay, the installation of the time
p.370delay relay shall be verified according to the procedure in Section 3.4.3.
p.370– Residential Field Verification and Diagnostic Test Protocolsp.371
p.3712025 Residential Appendices RA3.4.4.2 Rated Heat Pump Capacity Verification Procedure