RA3.2.3 Weigh-In Charging Procedure

p.3502025 Residential Appendices In order to allow for inevitable differences in measurements, the Pass/Fail criteria are different for the Installer than for the ECC-Rater.

p.350(d) If the Subcooling Deviation is within the subcooling tolerance allowed by Table RA3.2-1,

p.350then the system complies with the subcooling criterion, otherwise the system does not comply.

p.350(e) For the HVAC installer, if the system does not comply, and if the Actual Subcooling value is

p.350greater than the Target Subcooling value, the Installer shall remove refrigerant. If the Actual Subcooling value is less than the Target Subcooling value, the Installer shall add refrigerant. The Installer shall determine whether there are other system faults that may affect the validity of the refrigerant charge verification procedure and make any needed system repairs or adjustments to clear system faults prior to completion of the refrigerant charge verification procedure. The Installer shall adjust the refrigerant charge and check the measurements as many times as necessary to pass the test. After the final adjustment has been made, the Installer shall allow the system to run 15 minutes before completing the final measurement procedure.

p.350(f) Calculate Actual Superheat as the suction line temperature minus the evaporator

p.350saturation temperature. Actual Superheat = Tsuction, – Tevaporator, sat.

p.350(g) If possible, determine the Superheat Range specified by the manufacturer.

p.350(h) In order to allow for inevitable differences in measurements, the Pass/Fail criteria are

p.350different for the Installer than for the ECC-Rater.

p.350If the superheat is within the tolerance allowed by Table RA3.2-1, then the system complies with the metering device criterion, otherwise the system does not comply.

p.350For the HVAC installer, if the system does not comply remedial actions must be undertaken to ensure the TXV or EXV is operating properly.

p.350RA3.2.3 Weigh-In Charging Procedure

p.350This section specifies the weigh-in charging procedure in which the weight of the required refrigerant charge is determined by using the manufacturer's specifications for a standard refrigerant charge weight and taking into account adjustment factors such as deviations in refrigerant line length and diameter. The calculated weight of refrigerant is then installed using a refrigerant scale. RA3.2.3 provides two procedures: Section RA3.2.3.1 shall be used by the HVAC installer when the weigh-in procedure is required by the Standards for compliance. Section RA3.2.3.2 shall be used by the ECC-Rater when the Standards specify use of the procedure for compliance or specify it as an optional procedure for compliance. The weigh-in charging procedure is an acceptable method for demonstrating compliance at any outdoor temperature, however if the weigh-in charging procedure is used, verification of compliance cannot use group sampling.

p.350HVAC installers shall use the weigh-in charging procedure in accordance with the space conditioning system manufacturer’s specifications.

p.350Both the HVAC installer and the ECC-Rater shall test the system airflow as specified by Standards Sections 150.1(c)7Aib and 150.2(b)1Fiia as applicable.

p.350Appendix RA3– Residential Field Verification and Diagnostic Test Protocols