p.348RA3.2.2.6 Refrigerant Charge and Metering Device Calculations
p.348The following steps describe the calculations to determine if the system meets the required refrigerant charge and metering device function using the measurements determined in Section RA3.2.2.5. If a system fails, then remedial actions must be taken by the HVAC system installer. Be sure to run the air conditioner for 15 minutes after the final adjustments before taking any measurements.
p.348RA3.2.2.6.1 Fixed Metering Device Calculations - Superheat Charging Method
p.348The Superheat Charging Method is used only for systems equipped with fixed metering devices. These include capillary tubes and piston-type metering devices.
p.348Appendix RA3– Residential Field Verification and Diagnostic Test Protocolsp.349
p.3492025 Residential Appendices (a) Calculate Actual Superheat as the suction line temperature minus the evaporator
p.349saturation temperature.
p.349Actual Superheat = Tsuction, – Tevaporator, sat.
p.349(b) Determine and record the Target Superheat using Table RA3.2-2 or the manufacturer's
p.349superheat chart using the return air wet-bulb temperature (Treturn, wb) and condenser air dry-bulb temperature (Tcondenser, db).
p.349(c) If a dash mark is read from Table RA3.2-2, the target superheat is less than 5°F. Note that
p.349a valid refrigerant charge verification test cannot be performed under these conditions. A severely undercharged unit will show over 9°F of superheat. However overcharged units cannot be detected from the superheat method under these conditions. The usual reason for a target superheat determination of less than 5°F is that outdoor conditions are too hot, and the indoor conditions are too cool. One of the following is needed so a target superheat value can be obtained from Table RA3.2-2 either 1) turn on the space heating system and/or open the windows to warm up indoor temperature; or 2) retest at another time when conditions are different.
p.349(d) Calculate the difference between actual superheat and target superheat (Actual
p.349Superheat - Target Superheat).
p.349(e) In order to allow for inevitable differences in measurements, the Pass/Fail criteria are
p.349different for the Installer and the ECC-Rater.
p.349(f) For the Installer, if the difference is within the tolerance given as compliance criteria in
p.349Table RA3.2-1, then the system passes the required refrigerant charge criterion.
p.349(g) For the ECC-Rater inspecting the system, if the difference is within the criteria in Table
p.349RA3.2-1, then the system passes the required refrigerant charge criterion.
p.349(h) For the Installer, if the system fails to meet the criteria, refrigerant needs to be added if
p.349the superheat is too high and refrigerant needs to be removed if it is too low. The installer needs to remain aware of other potential system faults. Adjust refrigerant charge and check the measurements as many times as necessary to pass the test. After the final adjustment has been made, allow the system to run 15 minutes before completing the final measurement procedure.