p.6252. Space-conditioning systems.
p.626Entirely new or complete replacement duct systems shall also conform to the requirements of Sections 160.2(a)1 and 160.3(b)5L. If the air handler and ducts are located within a vented attic, the requirements of Section 180.2(b)1Bi shall also be met.
p.627b. The measured duct leakage to outside shall be equal to or less than 10 percent of
p.628that can be verified using the procedure specified in RA3.3 or an approved alternative in RA1.
p.629demonstrate compliance, the installer may elect to utilize the verification procedure in Reference Residential Appendix Section RA3.2.3.2. If the verification procedure in Section RA3.2.3.2 is used for compliance, the system's thermostat shall conform to the specifications in Section 110.12. Ducted systems shall comply with the minimum system airflow rate requirements in Section 180.2(b)2AivbI.
p.631b. Entirely new or replacement duct systems installed as part of an alteration
p.632a. For all altered units where the existing thermostat does not comply with the
p.627air handler airflow as determined utilizing the procedures in Reference Residential Appendix Section RA3.1.4.3.4; or
p.631shall be leakage-tested in accordance with Section 160.2(c)2H. Entirely new or replacement duct systems installed as part of an alteration shall be constructed of at least 75 percent new duct material, and up to 25 percent may consist of reused parts from the building's existing duct system, including registers, grilles, boots, air handlers, coils, plenums, and ducts, if the reused parts are accessible and can be sealed to prevent leakage.
p.632requirements for demand responsive controls specified in Section 110.12, the existing thermostat shall be replaced with a demand responsive thermostat that complies with Section 110.12. All newly installed space-conditioning systems requiring a thermostat shall be equipped with a demand responsive thermostat that complies with Section 110.12; and
p.625A. Space-conditioning systems serving dwelling units.
| Airflow | Multi-Zone VAV Systems1 ≤5,000 cfm | Multi-Zone VAV Systems1 >5,000 and ≤10,000 cfm | Multi-Zone VAV Systems1 >10,000 cfm | All Other Fan Systems ≤5,000 cfm | All Other Fan Systems >5,000 and ≤10,000 cfm | All Other Fan Systems >10,000 cfm |
|---|---|---|---|---|---|---|
| Supply Fan System Additional Allowance | 0.135 | 0.114 | 0.105 | 0.139 | 0.12 | 0.107 |
| Supply Fan System Additional Allowance In Unit with Adapter Curb | 0.033 | 0.033 | 0.043 | 0.000 | 0.000 | 0.000 |
| Exhaust/ Relief/ Return/ Transfer Fan System Additional Allowance | 0.07 | 0.061 | 0.054 | 0.07 | 0.062 | 0.055 |
| Exhaust/ Relief/ Return/ Transfer Fan System Additional Allowance In Unit with Adapter Curb | 0.016 | 0.017 | 0.022 | 0.000 | 0.000 | 0.000 |
p.628I. The minimum system airflow rate shall comply with the applicable Subsection
p.625i. Entirely new or complete replacement space-conditioning systems installed as
p.627c. If it is not possible to meet the duct sealing requirements of either Section
p.628A or B below as confirmed through field verification and diagnostic testing in accordance with the procedures specified in Reference Residential Appendix Section RA3.3 or an approved alternative procedure as specified in Section RA1.
p.625part of an alteration shall include all the system heating or cooling equipment, including but not limited to: condensing unit, cooling or heating coil, and air handler for split systems; or complete replacement of a packaged unit; plus entirely new or replacement duct system [Section 180.2(b)2Aiib]. Entirely new or complete replacement space-conditioning systems shall meet the requirements of Sections 160.2(a)1, 160.3(a)1, 160.3(b)1 through 3, 160.3(b)5, 160.3(b)6, 160.3(c)1, 170.2(c)3B, 180.2(b)2Av, and Table 180.2-C.
p.626II. Extension of an existing duct system. If the new ducts are an extension of
p.627180.2(b)2Aiiia or b, then all accessible leaks shall be sealed and verified through a visual inspection and a smoke test by a certified ECC-Rater utilizing the methods specified in Reference Residential Appendix RA3.1.4.3.5.
p.626an existing duct system serving multifamily dwellings, the combined new and existing duct system shall meet one of the following requirements:
p.632b. The duct system that is connected to the new or replaced space-conditioning
p.632system equipment shall be sealed, if the duct system meets the criteria of Section 120.4(g), as confirmed through acceptance testing, in accordance with the applicable procedures for duct sealing of altered existing duct systems as specified in Reference Nonresidential Appendix NA7.5.3, and conforming to the applicable leakage compliance criteria in Section 180.2(b)2Bii.
p.626A. The measured duct leakage shall be equal to or less than 15 percent of
p.628A. Small duct high velocity systems shall demonstrate a minimum system
p.626air handler airflow as confirmed by field verification and diagnostic testing utilizing the procedures in Reference Residential Appendix Section RA3.1.4.3.1; or
p.628airflow rate greater than or equal to 250 cfm per ton of nominal cooling capacity; or
p.625ii. Altered duct systems—duct sealing: In all climate zones, when more than 25 feet
p.628B. All other air-cooled air conditioner or air-source heat pump systems shall
p.629v. Altered Space-Heating System. Altered or replacement space-heating systems shall
p.625of new or replacement space-conditioning system ducts are installed, the ducts shall comply with the applicable requirements of Subsections a and b below. New ducts located in unconditioned space shall meet the applicable requirements of Sections 160.3(b)5A through J and the duct insulation requirements of Table 180.2-C, and a. The altered duct system, regardless of location, shall be sealed as confirmed
p.626B. The measured duct leakage to outside shall be equal to or less than 10
p.628demonstrate a minimum system airflow rate greater than or equal to 300 cfm per ton of nominal cooling capacity.
p.629not use electric resistance as the primary heat source.
p.626percent of air handler airflow as confirmed by field verification and diagnostic testing utilizing the procedures in Reference Residential Appendix Section RA3.1.4.3.4; or
p.631c. If the new ducts are an extension of an existing duct system, the combined
p.626C. If it is not possible to meet the duct sealing requirements of either
p.631new and existing duct system meets the criteria in Subsections I, II, and III below. The duct system shall be sealed to a leakage rate not to exceed 15 percent of the nominal air handler airflow rate as confirmed through acceptance testing, in accordance with Reference Nonresidential Appendix NA7.5.3:
p.626Section 180.2(b)2AiicI or II then all accessible leaks shall be sealed and verified through a visual inspection and a smoke test by a certified ECC-Rater utilizing the methods specified in Reference Residential Appendix RA3.1.4.3.5.
p.625through field verification and diagnostic testing in accordance with all applicable procedures for duct sealing of altered existing duct systems as specified in Reference Residential Appendix RA3.1, utilizing the leakage compliance criteria specified in Subsection I or II below.
p.627iv. Altered space-conditioning system mechanical cooling. When a space-conditioning
p.629B. Common Use Area Space Conditioning Systems
p.631I. The duct system provides conditioned air to an occupiable space for a
p.625TABLE 180.2-C DUCT INSULATION R-VALUE
p.627system is an air conditioner or heat pump that is altered by the installation or replacement of refrigerant-containing system components such as the compressor, condensing coil, evaporator coil, refrigerant metering device or refrigerant piping, the altered system shall comply with the following requirements:
p.630Footnotes to Table 180.2-D:
p.631constant volume, single zone, space-conditioning system; and
p.629i. New or Replacement Space-Conditioning Systems or Components other than
| Climate Zones 3, 5 through 7 | Climate Zones 1, 2, 4, 8 through 16 |
|---|---|
| R-6 | R-8 |
p.6301. See FAN SYSTEM, MULTI-ZONE VARIABLE AIR VOLUME (VAV) for the definition of a Multi-Zone VAV System.
p.631II. The space conditioning system serves less than 5,000 square feet of
p.629new or replacement space-conditioning system ducts shall meet the requirements of Sections 170.2(c)1, 2, and 4, applicable to the systems or components being altered. For compliance with Section 170.2(c)4A, additional fan power adjustment credits are available as specified in TABLE 180.2-D.p.630
p.631conditioned floor area; and
p.6323. Hot water systems. Altered or replacement water-heating systems or components serving individual dwelling units shall meet the applicable requirements below:
p.631III. The combined surface area of the ducts located in the following spaces is
p.625I. Entirely new or complete replacement duct system. If the new ducts
p.627a. All thermostats associated with the system shall be replaced with setback
p.631more than 25 percent of the total surface area of the entire duct system:
p.628II. The installer shall charge the system according to manufacturer’s
p.632A. Pipe insulation. For newly installed piping and existing accessible piping, the
p.625form an entirely new or complete replacement duct system directly connected to the air handler, the duct system shall meet one of the following requirements:
p.627thermostats meeting the requirements of Section 110.2(c).
p.628specifications. Refrigerant charge shall be verified according to one of the following options, as applicable.
p.632insulation requirements of Section 160.4(e) shall be met.
p.626iii. Altered space-conditioning system—duct sealing. In all climate zones, when a
p.627b. In Climate Zones 2 and 8 through 15, air-cooled air conditioners and air-source
p.626space-conditioning system serving a multifamily dwelling is altered by the installation or replacement of space-conditioning system equipment, including replacement of the air handler, outdoor condensing unit of a split system air conditioner or heat pump, or cooling or heating coil, the duct system that is connected to the altered space-conditioning system equipment shall be sealed, as confirmed through field verification and diagnostic testing in accordance with the applicable procedures for duct sealing of altered existing duct systems as specified in Reference Residential Appendix RA3.1 and the leakage compliance criteria specified in Subsection a, b or c below.
p.632B. Distribution system. For recirculation distribution system serving individual dwelling
p.627heat pumps, including but not limited to ducted split systems, ducted package systems, small duct high velocity air systems, and minisplit systems, shall comply with Subsections I and II, unless the system is of a type that cannot be verified using the specified procedures. Systems that cannot comply with the requirements of Section 180.2(b)2Aivb shall comply with Section 180.2(b)2Aivc.
p.631B. In a space directly under a roof that:
p.628A. The installer and rater shall perform the standard charge verification
p.632units, only demand recirculation systems with manual on/off control as specified in Reference Appendix RA4.4.9 shall be installed.
p.625A. The total leakage of the duct system shall not exceed 12 percent of
p.631i. Has a U-factor greater than the U-factor of the ceiling, or if the
p.628procedure as specified in Reference Residential Appendix Section RA3.2.2, or an approved alternative procedure as specified in Section RA1; or
p.625the air handler airflow as determined utilizing the procedures in Reference Residential Appendix Section RA3.1.4.3.1, or
p.631roof does not meet the requirements of Section 170.2(a)1B, or
p.632C. Water-heating system. The water-heating system shall meet one of the following:
p.631ii. Has fixed vents or openings to the outside or unconditioned
p.628B. The installer shall perform the weigh-in charging procedure as specified
p.625B. The duct system leakage to outside shall not exceed 6 percent of the
p.632i. A natural gas or propane water-heating system; or
p.631spaces; or
p.628by Reference Residential Appendix Section RA3.2.3.1, provided the system is of a type that can be verified using the RA3.2.2 standard charge verification procedure and RA3.3 airflow rate verification procedure or approved alternatives in RA1. The ECC-Rater shall verify the charge using RA3.2.2 and RA3.3 or approved alternatives in RA1.
p.625air handler airflow as determined utilizing the procedures in Reference Residential Appendix Section RA3.1.4.3.4.
p.6301. The system is not a single package air-cooled commercial unitary air conditioner or heat pump; and
p.632ii. A single heat pump water heater. The storage tank shall not be located outdoors
p.631C. In an unconditioned crawl space; or
p.632and shall be placed on an incompressible, rigid insulated surface with a minimum thermal resistance of R-10. The water heater shall be installed with a communication interface that either meets the requirements of Section 110.12(a) or has an ANSI/CTA-2045-B communication port; or
p.625Entirely new or complete replacement duct systems installed as part of an alteration are constructed of at least 75 percent new duct material, and up to 25 percent may consist of reused parts from the dwelling unit's existing duct system, including but not limited to registers, grilles, boots, air handler, coil, plenums and duct material, if the reused parts are accessible and can be sealed to prevent leakage.p.626
p.6302. The cooling capacity of the system is less than 54,000 Btu/h.
p.631D. In other unconditioned spaces.
p.626A. The measured duct leakage shall be equal to or less than 15 percent of air
p.630ii. Altered duct systems. When new or replacement space-conditioning system
p.631iii. Altered space-conditioning systems. When a space-conditioning system is altered
p.626handler airflow as determined utilizing the procedures in Reference Residential Appendix Section RA3.1.4.3.1; orp.627
p.630ducts are installed to serve an existing building, the new ducts shall meet the requirements of Section 160.3(c)2 and meet a or b below:
p.631by the installation or replacement of space-conditioning system equipment (including replacement of the air handler, outdoor condensing unit of a split system air conditioner or heat pump, or cooling or heating coil:p.632
p.632iii. A single heat pump water heater that meets the requirements of NEEA Advanced
p.632Water Heater Specification Tier 3 or higher; or
p.630a. Reserved.p.631
p.625SECTION 180.2 – ALTERATIONS
p.626SECTION 180.2 – ALTERATIONS
p.627SECTION 180.2 – ALTERATIONS
p.628SECTION 180.2 – ALTERATIONS
p.629SECTION 180.2 – ALTERATIONS
p.630SECTION 180.2 – ALTERATIONS