SECTION 110.10 – MANDATORY REQUIREMENTS FOR SOLAR READINESS

p.214A. All thermostats are demand responsive controls that comply with Section 110.12(a), and are

p.215iii. Install alternative plumbing piping to permit the discharge from the clothes washer and all

p.2163. Shading.

p.213SECTION 110.10 – MANDATORY REQUIREMENTS FOR SOLAR READINESS

p.214capable of receiving and responding to Demand Response Signals prior to granting of an occupancy permit by the enforcing agency.

p.215showers and bathtubs to be used for an irrigation system in compliance with the California Plumbing Code and any applicable local ordinances; or

p.216A. No obstructions, including but not limited to, vents, chimneys, architectural features and roof

p.213(a) Covered occupancies.

p.216mounted equipment, shall be located in the solar zone.

p.2131. Single-family residences. Single-family residences located in subdivisions with ten or more single-family residences and where the application for a tentative subdivision map for the residences has been deemed complete or approved by the enforcement agency, which do not have a photovoltaic system installed, shall comply with the requirements of Sections 110.10(b) through 110.10(e)

p.214B. Comply with one of the following measures:

p.215iv. Install a rainwater catchment system designed to comply with the California Plumbing Code

p.216B. Any obstruction, located on the roof or any other part of the building that projects above a solar zone

p.215and any applicable local ordinances, and that uses rainwater flowing from at least 65 percent of the available roof area.

p.214i. Install a dishwasher that meets or exceeds the ENERGY STAR® Program requirements with a refrigerator that meets or exceeds the ENERGY STAR Program requirements, a whole house fan driven by an electronically commutated motor, or an SAE J1772 Level 2 Electric Vehicle Supply Equipment (EVSE or EV charger) with a minimum of 40 amperes; or

p.216shall be located at least twice the distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of the nearest point of the solar zone, measured in the vertical plane.

p.215B. Meet the Title 24, Part 11, Section A4.106.8.2 requirements for electric vehicle charging spaces.

p.2132. Low-rise multifamily buildings. Low-rise multifamily buildings that do not have a photovoltaic system installed shall comply with the requirements of Sections 110.10(b) through 110.10(d).

p.214ii. Install a home automation system capable of, at a minimum, controlling the appliances and lighting of the dwelling and responding to demand response signals; or

p.2133. Hotel/motel occupancies and high-rise multifamily buildings. Hotel/motel occupancies and high-rise multifamily buildings with ten habitable stories or fewer, that do not have a photovoltaic system installed, shall comply with the requirements of Sections 110.10(b) through 110.10(d).

p.2152. Azimuth range. All sections of the solar zone located on steep-sloped roofs shall have an azimuth range between 90 degrees and 300 degrees of true north.p.216

p.2164. Structural design loads on construction documents. For areas of the roof designated as solar zone, the structural design loads for roof dead load and roof live load shall be clearly indicated on the construction documents.

p.214iii. Install alternative plumbing piping to permit the discharge from the clothes washer and all

p.214showers and bathtubs to be used for an irrigation system in compliance with the California Plumbing Code and any applicable local ordinances; or

p.2134. Nonresidential buildings. Nonresidential buildings with three habitable stories or fewer, other than I-2 and I-2.1 buildings, that do not have a photovoltaic system installed, shall comply with the requirements of Sections 110.10(b) through 110.10(d).

p.214iv. Install a rainwater catchment system designed to comply with the California Plumbing Code

p.214and any applicable local ordinances, and that uses rainwater flowing from at least 65 percent of the available roof area.

p.216(c) Interconnection pathways.

p.213(b) Solar zone.

p.2161. The construction documents shall indicate a location reserved for inverters and metering equipment and a pathway reserved for routing of conduit from the solar zone to the point of interconnection with the electrical service.

p.2131. Minimum solar zone area. The solar zone shall have a minimum total area as described below. The solar zone shall comply with access, pathway, smoke ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local jurisdiction. The solar zone total area shall be comprised of areas that have no dimension less than five feet and are no less than 80 square feet each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for buildings with roof areas greater than 10,000 square feet.

p.214B. Multifamily buildings, hotel/motel occupancies and nonresidential buildings. The solar zone shall be

p.214located on the roof or overhang of the building or on the roof or overhang of another structure located within 250 feet of the building or on covered parking installed with the building project, and shall have a total area no less than 15 percent of the total roof area of the building excluding any skylight area. The solar zone requirement is applicable to the entire building, including mixed occupancy.

p.2162. For single-family residences and central water-heating systems, the construction documents shall indicate a pathway for routing of plumbing from the solar zone to the water-heating system.

p.216(d) Documentation. A copy of the construction documents or a comparable document indicating the information

p.213A. Single-family residences. The solar zone shall be located on the roof or overhang of the building and

p.216from Sections 110.10(b) through 110.10(c) shall be provided to the occupant.

p.213have a total area no less than 250 square feet.

p.216(e) Main electrical service panel.

p.2161. The main electrical service panel shall have a minimum busbar rating of 200 amps.

p.2162. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a future solar electric installation. The reserved space shall be permanently marked as “For Future Solar Electric”.

p.214A. In each dwelling unit, comply with one of the following measures:

p.214i. Install a dishwasher that meets or exceeds the ENERGY STAR Program requirements with either a refrigerator that meets or exceeds the ENERGY STAR Program requirements or a whole house fan driven by an electronically commutated motor; or

p.214ii. Install a home automation system that complies with Section 110.12(a) and is capable of, at a minimum, controlling the appliances and lighting of the dwelling and responding to demand response signals; orp.215

p.213SECTION 110.10 – MANDATORY REQUIREMENTS FOR SOLAR READINESS

p.214SECTION 110.10 – MANDATORY REQUIREMENTS FOR SOLAR READINESS

p.215SECTION 110.10 – MANDATORY REQUIREMENTS FOR SOLAR READINESS

p.216SECTION 110.10 – MANDATORY REQUIREMENTS FOR SOLAR READINESS