p.51a. Affirmatively indicating, upon submitting any data to the ECC-Provider,
p.52A. ECC-Providers shall not knowingly accept, store, or disseminate untrue, inaccurate, or
p.53i. Methods of Producing Evidence. An applicant may evidence its ability to satisfy
p.54i. The original Full Application, all previously submitted and approved Triennial
p.557. Post-Approval Amendments. An approved ECC-Provider shall submit a Post-Approval
p.57a. The roles and responsibilities of all entities regulated by Section 10-
p.58(iii) Where to find specified certifications and ratings.
p.48they will or are reasonably expected to perform field verification or diagnostic
p.49ECC-Rater Company or Independent Rater and in good standing with the ECC-
p.50Rater when they have a conflict of interest, regardless of its accuracy, shall be
p.56unrelated owners, shareholders (if applicable), executive management, employees,
p.48testing services.
p.49Provider. Except as provided in subdivision (a) below, only the ROR may register
p.50considered conflicted data. Any data collected through sampling procedures (Building
p.51that the data is not conflicted data, or that the ECC-Rater or ECC-Rater
p.52incomplete information or information received through actions not conducted in
p.53the ECC-Provider Requirements by providing a written strategy for how it
p.54Reapprovals, any Updated Applications, including Conditions of Certification,
p.55Amendment to the Executive Director when the ECC-Provider wishes to make a modification to
p.56physical assets, intangible assets, intellectual property, business practices, registered
p.57103.3 and in the Building Energy Efficiency Standards, Reference
p.58g. Compliance document and registration.
p.4710-103.3 Administrative Procedures for the Energy Code Compliance Program
p.49a subsequent passing field verification or diagnostic test previously registered
p.50Energy Efficiency Standards, Reference Appendix RA2.6) where the ECC-Provider is
p.51Company had a conflict of interest at the time the data was collected
p.52compliance with these regulations, including information related to field verification and
p.53intends to satisfy each requirement, citing examples of how it has been able to
p.54and any Post-Approval Amendments that were submitted and/or approved.
p.55their approved application or, as a result of any circumstances other than the transition to a new
p.56organization names, branding, marketing materials, and trademarks.
p.57Appendices RA1, RA2, RA3, RA4, NA1, NA2, and JA7.
p.48vi. ECC-Raters or ECC-Rater Companies shall provide a report to the building or
p.58(i) Building Energy Efficiency Standards regulations, associated
p.47(a) Scope. The requirements in this section apply to ECC-Providers, ECC-Raters, and ECC-Rater Companies
p.49as a failure.
p.50refused access to perform an onsite quality assurance audit (Section 10-103.3(d)5Ci)
p.51but had express written approval from the Executive Director excusing
p.52diagnostic testing information, field verification and diagnostic test results, or results on
p.53satisfy each regulatory requirement, or by any other means of introducing
p.55Triennial Code Cycle or progressive discipline pursuant to Section 10-103.3(c)3, or the application
p.54ii. All correspondence concerning progressive discipline between the ECC-Provider
p.56D. Final Agency Action. If the Commission determines that the applicant has failed to
p.57b. Energy Code nomenclature that designates building types, dwelling
p.48project owner for field verification or diagnostic testing services performed on
p.58testing protocols, and the corresponding forms for data entry.
p.47performing work relating to residential field verification and diagnostic testing for the Energy Code
p.50shall be considered conflicted data.
p.51the conflict.
p.52a certificate of compliance or certificate of installation documents.
p.53evidence into the record acceptable to the Executive Director or Commission.
p.55no longer accurately reflects the ECC-Provider’s operations.
p.49a. Under any of the following circumstances, the ECC-Provider may
p.48the project site. The report may be provided through a contractor or other
p.54and the Commission commencing with the notice of potential violation for each
p.56demonstrate it is not a decertified ECC-Provider, or any successor, subsidiary, or
p.57units, systems, and compliance methods.
p.58(ii) Documentation workflow and data input.
p.47Compliance (ECC) Program. The ECC Program is intended to verify that the newly constructed residential
p.50i. ECC-Providers shall not knowingly accept conflicted data on their systems. ECC-
p.51b. Any other process approved by the CEC.
p.52B. ECC-Providers shall not accept payment or other consideration in exchange for use of
p.53ii. Disputed Evidence. Any interested party may introduce evidence
p.55A. Process. The ECC-Provider may submit a Post-Approval Amendment as either
p.48project representative to the building or project owner but must be a
p.49release a project from the ROR but must verify that the retest for the
p.54violation that led to rescinding approval.
p.56otherwise affiliated or substantially similar organization to a decertified ECC-Provider,
p.57c. Basic building science concepts, including:
p.47buildings and additions and alterations to existing residential buildings comply with the requirements of
p.58(iii) Form logic and validation.
p.51v. Any ECC-Rater or ECC-Rater Company may apply to the Executive Director for
p.48conspicuous and separate document from other documents provided by the
p.49failed field verification or diagnostic test is legitimate either through a
p.50Providers may demonstrate that they have fulfilled this requirement by, for
p.52their data registry to report a field verification and diagnostic test result that was
p.53demonstrating that an applicant either cannot satisfy, or in the past has failed
p.55substantive or non-substantive. The Executive Director may determine whether a post-
p.56the Commission may deem the applicant a decertified ECC-Provider ineligible to apply
p.54iii. A Remediation Report and Plan explaining why each violation leading to a
p.57(i) Principles of heat transfer.
p.47the Building Energy Efficiency Standards in order to protect consumers from poor construction and
p.48contractor or project representative. The report must include all of the
p.49site visit, photographic evidence (or other remote verification), or a
p.50example:
p.51express written approval excusing a conflict of interest under this section.
p.52knowingly conducted and reported out of compliance with these regulations.
p.53to satisfy, one or more regulatory requirements specified in Section 10-
p.55approval amendment is substantive or non-substantive.
p.56until the applicant has completed remediation or specify when the applicant may re-
p.58(iv) Group sampling.
p.54rescinded approval occurred and the steps that the ECC-Provider has taken to
p.47installations.
p.57(ii) Energy conservation features.
p.51a. Such an application must include the following information: an
p.48following elements:
p.49desk audit (Section 10-103.3(d)5Civ) on the project:
p.53103.3(c)1.
p.56submit an application. The period of time before re-submittal may not exceed three
p.50a. Requiring ECC-Raters to affirmatively indicate, upon submitting any
p.52C. Only the ECC-Rater who performs a field verification and diagnostic test shall have
p.55B. Substantive. If the Executive Director determines that a post-approval amendment is
p.54remedy past violations and prevent future violations similar to those that led to
p.58h. Professionalism and conduct when working with various trades,
p.47(b) General Provisions.
p.51explanation of the conflict of interest, the beginning and ending date
p.56years from when the appeal was submitted.
p.57(iii) Framing, fenestration, insulation, and other built or installed
p.48a. The ECC-Rater’s or ECC-Rater Company’s name, logo (if any), contact
p.49(i) The ROR agrees to release the project.
p.53B. The full legal name of the applicant is registered with the California Secretary of State.
p.50data to the ECC-Provider, that the data is not conflicted data or that
p.52signatory authority for all certificates of verification related to the field verification and
p.54its rescinded approval.
p.55substantive, the amendment shall follow the process specified by Section 10-110 and be
p.58owners, and other site personnel.
p.51of the conflict of interest (if any), and written justification providing
p.471. Conflicts of Interest.
p.57features.
p.56(d) ECC-Provider Responsibilities.
p.48information, and certification number.
p.50the ECC-Rater had a conflict of interest at the time the data was
p.52diagnostic test.
p.55approved by the Commission. Substantive changes include any changes to training,
p.49(ii) The ROR is physically unable to continue work on the project
p.53C. The full legal name, date of birth, current residential address, and social security number
p.54iv. A draft Full Application that incorporates all necessary modifications to address
p.58i. Resources available on the Commission website related to the Building
p.51compelling and persuasive evidence that (1) the conflict of interest will
p.50collected but had express written approval from the Executive Director
p.55certification, or oversight (including quality assurance) that would result in any impact to
p.57(iv) Energy consuming appliances.
p.47A. Prohibition of Conflicts of Interest.
p.48b. The ECC-Provider data registry link and registry numbers for all compliance
p.52i. ECC-Raters shall not use technicians who are not certified ECC-Raters to
p.561. ECC-Rater Training. For each Triennial Code Cycle, ECC-Providers shall provide training to existing
p.49due to injury, misfortune, or availability.
p.53of every individual with an ownership interest in and principal of the ECC-Provider
p.54the issues described in the Remediation Report and Plan.
p.58Energy Efficiency Standards.
p.51not result in inaccurate data and (2) unnecessary hardship will result
p.50waiving the conflict of the ECC-Rater.
p.55consumers, ECC-Raters, ECC-Rater Companies, or the ability of the ECC-Provider to
p.48documents registered by the ECC-Rater or ECC-Rater Company for the
p.52perform field verification and diagnostic testing unless said technicians are
p.53applicant.
p.56ECC-Raters and new ECC-Rater applicants. The ECC-Provider may also provide this training for
p.57(v) Types of space conditioning and ventilating systems.
p.47i. ECC-Providers shall be independent from, and have no financial interest in, ECC-
p.49(iii) The ROR’s certification has been suspended (Section 10-
p.54C. Basis for Approval. The Commission may approve an Application for Remediation if the
p.58j. Progressive discipline of ECC-Raters (Section 10-103.3(d)7) and the
p.51from the application of the prohibition on conflicted data in this
p.55comply with any requirement of Section 10-103.3(c)1.
p.50b. Any other process approved by the CEC.
p.48project.
p.52directly supervised by the ECC-Rater in person on the project site.
p.56prior Triennial Code Cycles. To fulfill the training requirements (Section 10-103.3(d)), an ECC-
p.47Rater Companies or ECC-Raters.
p.53D. A complete list of any entities that have business relationships with the applicant such as
p.49103.3(d)7C) or decertified (Section 10-103.3(d)7D).
p.54Commission finds:
p.57(vi) Types of water heating systems.
p.58appeal process (Section 10-103.3(h)).
p.51instance.
p.55C. Nonsubstantive. If the Executive Director determines that a post-approval amendment
p.56Provider shall confirm that an ECC-Rater applicant has completed a training curriculum that
p.48c. An itemization of each field verification or diagnostic test, as well as any
p.50ii. ECC-Providers shall take all reasonable steps to detect, deter, isolate, and
p.52ii. No other person shall sign the certificates of verification other than the ECC-
p.53parent companies, subsidiaries, affiliates, and/or any past names under which the entity
p.47ii. ECC-Providers, ECC-Raters, and ECC-Rater Companies shall operate
p.49(iv) The ROR is unwilling to continue work on the project.
p.54i. The decertified ECC-Provider has demonstrated a good faith willingness to take
p.57(vii) Categories of lighting systems and lighting controls.
p.58k. Quality assurance process (Section 10-103.3(d)5).
p.51b. The Executive Director may grant such written approval only if the
p.55is nonsubstantive, they may approve the amendment by informing the ECC-Provider’s
p.56covers all information necessary to perform all FV&DTs in accordance with the applicable Building
p.48other services performed for the project, the amount charged, and the
p.50identify conflicted data in their systems, including in compliance documents and
p.52Rater who preformed or directly supervised technicians who performed the
p.53has conducted business as an ECC-Provider, if applicable.
p.47independently and shall not have any financial interest in the builder, designer,
p.54feasible steps toward remediation.
p.49b. The ECC-Provider shall lock the project compliance documentation
p.51Executive Director finds there is compelling and persuasive evidence of
p.57(viii) Energy generating and storage systems.
p.58l. Conflict of interest requirements (Section 10-103.3(b)1).
p.55Designated Contact and posting the proposed post-approval amendment application. A
p.56Energy Efficiency Standards and passed all associated tests. Alternatively, if offered by the ECC-
p.48results in terms of pass or fail.
p.50Compliance Registration Packages. ECC-Providers may demonstrate that they
p.52field verification and diagnostic test.
p.47or subcontractor serving as the “Responsible Person” signatory as specified in
p.53E. The Triennial Code Cycle for which the applicant intends to operate as an ECC-Provider.
p.51the factors identified in Section 10-103.3(b)1Bva.
p.54ii. The decertified ECC-Provider has presented a remediation plan that can remedy
p.49within the data registry by address, permit number, or other
p.55non-substantive update is any change that is not considered a substantive update,
p.56Provider, an existing ECC-Rater may apply for approval without completing an ECC-Provider’s
p.57(ix) Energy efficiency effects of building characteristics.
p.58m. Prohibition on False, Inaccurate, or Incomplete Information (Section
p.50have taken all reasonable steps, for example:
p.47Sections 10-103(a)1 and 10-103(a)3 on a project. However, an exception applies
p.48vii. The ECC-Provider shall develop a Consumer Information Form, and the
p.52(c) ECC-Provider Approval.
p.53F. The contact information for one or more Designated Contacts who the Commission can
p.49reasonable means and shall not allow any further compliance
p.54past violations and prevent future violations similar to those that led to its
p.51c. Unsupported or general assertions of trustworthiness or accuracy are
p.55including correcting typographical errors, modifying contact information, renaming
p.56training curriculum by passing a challenge test, which is a comprehensive test of advanced FV&DT
p.5810-103.3(b)2).
p.47if the ECC-Rater Company submits a Declaration of ECC-Rater Company
p.57d. Worksite safety.
p.50a. Requiring ECC-Raters to complete training, prior to certification,
p.48Commission may request to review and provide recommendations on the
p.521. Approval Process. Approval as an ECC-Provider is limited to a single Triennial Code Cycle. To
p.49documents to be registered for a failed test at the project site other
p.53contact as needed.
p.54rescinded approval.
p.51neither compelling nor persuasive evidence of the factors identified in
p.55positions or programs, and making changes that do not impact consumers, ECC-Raters,
p.56technical knowledge that verifies the ECC-Rater applicant has sufficient knowledge necessary to
p.47Separation of Services, as provided in Section 10-103.3(f)2Diii. This applies
p.58iii. Classroom Training. Classroom training shall include an electronic or hardcopy
p.48content of that form. The Consumer Information Form shall include educational
p.50regarding the requirements of Section 10-103.3(b)1A, including that it
p.57(i) Personal protective equipment and appropriate dress.
p.49than from the ROR or allowable substitute under Section 10-
p.52become an ECC-Provider, an applicant shall submit a Full Application. To continue as an ECC-
p.51Section 10-103.3(b)1Bva.
p.53G. Any other information relating to the applicant’s ability to satisfy each regulatory
p.54iii. The decertified ECC-Provider has demonstrated the ability to adequately
p.55ECC-Rater Companies, or alter the ability of the ECC-Provider to comply with any
p.56perform FV&DT in accordance with the applicable Building Energy Efficiency Standards. The
p.47specifically to projects where the ECC-Rater is involved in, or is reasonably
p.58manual for each student and comply with the following requirements:
p.48materials regarding the ECC Program, the roles and responsibilities of ECC-
p.50applies to data, or by some other reasonable method to deter
p.49103.3(b)1Aviiia.
p.52Provider for a subsequent Triennial Code Cycle, a current ECC-Provider shall submit a Triennial
p.57(ii) Communication with site management personnel.
p.55requirement of Section 10-103.3(c)1.
p.56Commission shall approve all training materials under the full training curriculum and challenge
p.53requirement specified in Section 10-103.3(c)1 or specifically requested by the Executive
p.54implement the remediation plan.
p.51d. The Executive Director may, at their discretion, request additional
p.47expected to provide, field verification and diagnostic testing services.
p.48Raters, ECC-Providers and ECC-Rater Companies, and the means by which the
p.50conflicted data.
p.58a. Classroom training may be provided online or in person and may be
p.52Reapproval Application. Applications will be considered pursuant to the procedures in Section 10-
p.49c. An ECC-Provider shall not knowingly accept compliance documents for
p.56test as part of the ECC-Provider’s application (Section 10-103.3(b)).
p.53Director or Commission.
p.57(iii) Awareness of site hazards (including asbestos, fall risks, lifted
p.558. Conditions of Approval. As a prerequisite of approval of any ECC-Provider application, the
p.51information, provide express written approval, provide conditional
p.54D. Upon Approval. If the decertified ECC-Provider’s Application for Remediation is
p.48owner may file a complaint. The Consumer Information Form must also include
p.47iii. For the purposes of this subdivision, a “financial interest” includes:
p.58taught by an in-person instructor, an online instructor or online
p.50b. Instituting a desk audit program that assesses data submitted to the
p.52110. A Full Application or a Triennial Reapproval Application may be updated as set forth in
p.49registration for a project that has an active failed field verification or
p.56A. Training and testing curriculum. An ECC-Provider’s training curriculum for ECC-Rater
p.57loads, confined spaces, vehicles, powered equipment and
p.51express written approval, or reject the request. If an applicant does not
p.534. Triennial Reapproval Application. The Commission may approve an existing ECC-Provider’s
p.55Commission may impose Conditions of Approval as the Commission deems necessary to ensure
p.54approved by the Commission, the decertified ECC-Provider is eligible to submit a Full
p.48the owner’s valid contact information, comprised of the owner's name, project
p.58proctoring software as provided in Section 10-103.3(d)1Aviii.
p.50ECC-Provider pursuant to Section 10-103.3(d)5Civ to confirm whether
p.52Section 10-103.3(c)6. An approved ECC-Provider may make modifications to its application as set
p.47a. a business entity in which the entity or individual has a direct or
p.49diagnostic tests in any other ECC-Provider data registry.
p.57tools, pressurized vessels and pipes, electrical terminals and
p.51receive a reply within 120 calendar days, their request is denied.
p.55that the applicant can meet the requirements of Section 10-103.3(c)1 if approved. If the
p.56applicants must include the following:
p.53application to continue as an ECC-Provider for a subsequent Triennial Code Cycle if the
p.54Application.
p.48address, phone number, and email. Prior to the start of any field verification or
p.50the submitting ECC-Rater had a disqualifying conflict of interest
p.52forth in Section 10-103.3(c)7. All applications must include a statement of scope that indicates
p.47indirect investment worth $2,000 or more, or in which the entity or
p.58b. When administered online, the modules must be naturally paced,
p.57fixtures, etc.), occupants in the dwelling unit, and escape
p.49(i) ECC-Providers shall submit a complaint to the Commission
p.55Commission imposes Conditions of Approval, the Commission may require the applicant to
p.53application includes each of the following:
p.51vi. Upon identifying data that may be conflicted, the ECC-Provider shall perform a
p.56i. Building Energy Efficiency Standards mandatory subject areas. The training
p.48diagnostic testing at a project site, the ECC-Rater or ECC-Rater Company shall
p.54E. Upon Rejection. If a decertified ECC-Provider’s Application for Remediation is rejected
p.50pursuant to Section 10-103.3(b)1A at the time of the data’s
p.52what services the applicant intends to provide to the marketplace. Upon a first-time approval of
p.47individual is a director, officer, partner, trustee, or employee. However,
p.58recorded, and played back no faster than 100 percent speed. Modules
p.57routes.
p.55demonstrate that the applicant will satisfy each Condition of Approval prior to approval. Violating
p.49(Section 10-103.3(d)6B) upon suspected violation of this
p.48provide a copy of the most recent version of the Consumer Information Form
p.51desk audit to assess whether the data is in fact conflicted data, such as by
p.53A. The original Full Application for the previous cycle, any Updated Applications, including
p.56curriculum shall instruct ECC-Raters how to perform FV&DT as set forth in the
p.54by the Commission, the ECC-Provider may re-submit an Application for Remediation only
p.50submission, or by some other reasonable method to detect conflicted
p.52an ECC-Provider, the Energy Commission shall assign the ECC-Provider a three-digit identification
p.47this prohibition on investments does not include ownership of less
p.58must require occasional student interaction not limited to brief quizzes
p.55a Condition of Approval imposed by the Commission shall constitute a violation of these
p.49requirement.
p.57(iv) Site security.
p.48developed by the ECC-Provider to the owner or owner representative and shall
p.51contacting the submitting ECC-Rater or ECC-Rater Company and asking them to
p.56following Building Energy Efficiency Standards, Reference Appendices:
p.53Conditions of Approval, and any Post-Approval Amendments that were submitted
p.54with the written approval of the Executive Director or Commission.
p.50data.
p.52number.
p.47than five percent of a publicly traded company.
p.58to progress through topics and encourage engagement with the
p.55regulations and may result in disciplinary action, up to and including rescinding of approval.
p.48submit a completed Consumer Information Form to the ECC-Provider. Failure to
p.49(ii) Upon investigation, the Commission may take disciplinary
p.51confirm, in writing, whether the data was conflicted or not. Upon discovery of a
p.53and/or approved.
p.57(v) Other practices, not limited to those relevant to home energy
p.56a. RA1: Alternative Residential Field Verification and Diagnostic Test
p.546. Updated Application.
p.58platform.
p.50c. Investigating and, as necessary, quarantining or marking conflicted
p.522. Confidential Information. An applicant may identify any information in its application the
p.47b. an ownership interest, debt agreement, or employer/employee
p.559. Executive Director Rejection of Decertified ECC-Provider’s Application.
p.48register a valid Consumer Information Form will make the ECC-Rater or ECC-
p.51violation of the conflict-of-interest restrictions in Section 10-103.3(b)1A, the
p.49action against an ECC-Provider (Section 10-103.3(d)15) if the
p.57testing and verification procedures and equipment.
p.53B. All previously submitted and approved Triennial Reapproval, if any.
p.56Protocols
p.50data, or otherwise identifying that data as conflicted, including
p.52applicant considers confidential and request from the Commission a confidential designation as
p.54A. Update with Executive Director‘s Approval. With the written permission of the
p.47relationship.
p.58c. Classroom training may include pre-recorded video instructions but
p.48Rater Company subject to discipline as described in Sections 10-103.3(d)7 and
p.51ECC-Provider shall use this gathered information to initiate disciplinary action
p.49CEC can demonstrate noncompliance or recommend
p.55A. The Executive Director may reject any application if the Executive Director determines
p.57e. Instrumentation.
p.56b. RA2: Residential Verification, Testing, and Documentation Procedures
p.50pursuant to Section 10-103.3(b)1Bvi.
p.52specified in Title 20, California Code of Regulations, Section 2505. If an applicant requests a
p.53C. Information demonstrating that the applicant can and will satisfy each regulatory
p.54Executive Director, at any point during the Section 10-110 process, an applicant may
p.58must not solely rely on pre-recorded videos.
p.47iv. ECC-Providers, ECC-Raters, and ECC-Rater Companies or principals of an ECC-
p.4810-103.3(d)8. For projects with no current owner in residence, the owner's
p.51against either (or both) the ECC-Rater (Section 10-103.3(d)7) and ECC-Rater
p.49disciplinary action against an ECC-Rater or ECC-Rater
p.55the applicant is an ECC-Provider that has previously been decertified, or is a successor,
p.52designation of confidential information, the applicant shall also submit a non-confidential
p.53requirement not otherwise addressed in any previously approved Application, subject to
p.54submit an updated application, which shall be identified as an Updated Application and
p.57(i) Diagnostic devices used in the measurement of, but not
p.50d. Any other process approved by the CEC.
p.56c. RA3: Residential Field Verification and Diagnostic Test Protocols
p.47Provider or ECC-Rater Company shall not perform field verification or diagnostic
p.58d. Classroom training may use mock tests or exams, but mock tests or
p.48contact information may be that of the landlord, developer, builder, or any
p.51Company (Section 10-103.3(d)8) responsible for the registered data in question.
p.49Company (Sections 10-103.3(d)7 and 10-103.3(d)8).
p.55subsidiary, or otherwise affiliated or substantially similar organization to an ECC-Provider
p.52summary of its application.
p.53the same evidentiary constraints and requirements as a Full Application.
p.54made available to interested parties for review and comment for at least 30 days prior to
p.57limited to, duct leakage testing, dwelling unit leakage (blower
p.47testing services for builders, designers, or subcontractors owned or operated by
p.58exams may not be used to comply with the Tests and Exams
p.48other such person with a real property interest. For the purposes of a Consumer
p.50iii. ECC-Providers may not use, rely on, sell, or offer for sale, any conflicted data for
p.56d. RA4: Eligibility Criteria for Energy Efficiency Measures
p.51vii. ECC-Providers shall flag or otherwise mark verified conflicted data (Section 10-
p.49ix. Use of Registered Certificates. The use of registered certificates, including
p.55that has previously been decertified, and that has not completed the Application for
p.54consideration by the Commission at a business meeting.
p.523. Full Application. The Commission may approve a full application to become an ECC-Provider if
p.57doors), system air flow and pressure, and refrigerant pressure
p.53D. Alternatively, an existing ECC-Provider may submit a full Application for the Triennial
p.47close familial relatives. For purposes of this subdivision, “close familial relative”
p.58requirements in Section 10-103.3(d)1Avi.
p.48Information Form, register is defined as submitting the information outlined in
p.50any purpose other than to detect, deter, isolate, and identify conflicted data
p.51103.3(b)1Bvi) in the data registry and inform all of the following of the
p.55Remediation process pursuant to Section 10-103.3(c)5.
p.56e. NA1: Nonresidential Verification, Testing, and Documentation
p.49Certificates of Compliance, Certificates of Installation, and Certificates of
p.57and temperature.
p.52the application includes each of the following:
p.54B. Update at Commission Direction, Conditions of Approval. The Executive Director or
p.47means a spouse, domestic partner, or cohabitation partner or a parent,
p.53Code Cycle.
p.48this paragraph to the ECC-Provider.
p.50from their systems, or to otherwise prevent the generation or transmission of
p.58iv. Instructional Materials.
p.51identification of the data and which field verification and diagnostic tests reliant
p.49Verification, is limited to the demonstration and documentation of the project
p.56Procedures
p.55B. An applicant may appeal the Executive Director’s decision to reject its application to the
p.47grandparent (including greats), sibling, child, grandchild (including greats) of the
p.54Commission may direct an applicant to update their application in order to address any
p.57(ii) Accuracy and tolerance.
p.52A. Evidence of Ability to Satisfy ECC-Provider Requirements. Information sufficient to
p.50conflicted data.
p.535. Application for Remediation.
p.48viii. Once an ECC-Rater has registered a failed field verification or diagnostic test,
p.51on the data are invalidated: the homeowner, ECC-Rater, ECC-Rater Company,
p.49compliance with the Building Energy Efficiency Standards. Other uses of
p.58a. The materials shall address all topics listed in Sections 10-103.3(d)1Ai
p.55full Commission pursuant to Section 10-103.3(h). The applicant shall establish that it is
p.56f. NA2: Nonresidential Field Verification and Diagnostic Test Procedures
p.47individual or spouse, domestic partner, or cohabitation partner, and any person
p.54issues or concerns raised by any interested party with respect to the applicant’s ability to
p.52demonstrate, by a preponderance of the evidence, that the applicant can and will satisfy
p.57(iii) Calibration requirements.
p.48that ECC-Rater or ECC-Rater Company (or Independent Rater) shall become the
p.50iv. ECC-Raters and ECC-Rater Companies may not submit any conflicted data
p.51authority having jurisdiction over the issued construction permit, and the
p.49registered certificates, such as for federal tax credits, is only permitted for
p.53A. An ECC-Provider that has been decertified may submit one Application for Remediation
p.58and 10-103.3(d)1Aii.
p.55not a decertified ECC-Provider, successor, subsidiary, or otherwise affiliated or similar
p.56ii. Other mandatory subject areas. The training curriculum shall inform ECC-Rater
p.47living in the same household.
p.54completely fulfil the role of ECC-Provider, including by imposing Conditions of Approval.
p.52each regulatory requirement specified as the ECC-Provider Approval Process in Section
p.48ECC-Rater of Record (ROR) for the specific field verification or diagnostic test at
p.51Commission.
p.49projects that have been completed and are closed within the data registry.
p.50without the express written approval of the Executive Director. ECC-Raters and
p.53pursuant to Section 10-110 during the Triennial Code Cycle in which it was decertified.
p.57f. Equipment certification.
p.55organization to a decertified ECC-Provider.
p.58b. Materials that are presented in a slideshow format must be
p.56applicants about:p.57
p.5210-103.3(c)1 for the duration of their tenure as an ECC-Provider.p.53
p.54C. Applicant Withdrawal and Re-submission. Applicants who have submitted an
p.47v. ECC-Raters and ECC-Rater Companies shall not perform any construction
p.48the project site. If the ROR is an ECC-Rater Company or Independent Rater, then
p.50ECC-Rater Companies may fulfill this requirement by, for example:p.51
p.512. Prohibition on False, Inaccurate, or Incomplete Informationp.52
p.49B. Conflicted Data. The prohibitions on conflicts of interest specified in Section 10-
p.53B. An Application for Remediation shall include:p.54
p.55C. Minimum Evidentiary Requirements. At a minimum, an appeal from rejection shall
p.58accompanied by a script or detailed outline that explains the narrative
p.57(i) Overview of manufacturer-certified equipment ratings.
p.47activity on a project site for which a construction permit is issued and for whichp.48
p.54application may withdraw their application at any time before approval and may submit
p.48the ROR may be replaced by any ECC-Rater that is a fulltime employee of thep.49
p.49103.3(b)1A apply to any data collected by an ECC-Rater. Any data collected by an ECC-p.50
p.58and the purpose of each visual.
p.55demonstrate that the applicant and decertified ECC-Provider have dissimilar andp.56
p.57(ii) When and why certification applies for verification.p.58
p.54a new application pursuant to this section and Section 10-110.p.55
p.47CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.48CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.49CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.50CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.51CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.52CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.53CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.54CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.55CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.56CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.57CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.58CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM