10-103.3 Administrative Procedures for the Energy Code Compliance Program (part 2 of 4)

p.59c. Slide text and graphics must be legible.

p.60vii. Practical test. ECC-Rater applicants shall take a practical test offered by an ECC-

p.62B. Information regarding the following:

p.63iv. Certification status, limited to Certified-Active, Exemplary-Active, notice of

p.64b. ECC-Raters must not be informed that their field verification and

p.67e. The desk audit results shall be documented by the ECC-Provider,

p.68B. Commission-Initiated Queries and Complaints. The Commission may direct an ECC-

p.69iv. The ECC-Rater will have 10 days of receipt of the notice of violation to respond

p.61103.3(d)1A requirements. ECC-Providers may offer a challenge test in compliance with

p.65applicable, Section 10-103.3(d)5Cii (Shadow Audits) for an ECC-

p.66based compliance documents from the developer, contractor, or ECC-

p.70notice to the ECC-Rater and any ECC-Rater Company for which the ECC-Rater performs

p.60Provider to demonstrate competence in all subjects specified in Sections 10-

p.61Section 10-103.3(d)1B. Laboratory training (Section 10-103.3(d)1Aiv) and practical

p.63violation, Probation, Suspended, Decertified, Inactive.

p.64diagnostic test is receiving an onsite audit until the onsite audit is

p.65Rater.

p.66Rater regarding the project.

p.67provided to the ECC-Rater and ECC-Rater Company, and recorded in

p.68Provider to investigate any queries related to the performance of the FV&DT program.

p.69in writing. If the ECC-Provider receives a response, the ECC-Provider shall

p.70field verification and diagnostic testing services.

p.59d. Governmental logos must not appear on class materials (including

p.62i. The roles and responsibilities of all entities regulated by Section 10-103.3 and in

p.60103.3(d)1Ai and 10-103.3(d)1Aii as they apply to the performance of FV&DT

p.61testing (Section 10-103.3(d)1Avii) shall only be required if changes made during any

p.64complete and the results are documented.

p.67the ECC-Provider’s quality assurance database (Section 10-103.3(d)9B).

p.68An ECC-Provider shall respond within 30 days of receiving a Commission direction to

p.69acknowledge the response and within 10 days, request additional information

p.63G. The ECC-Provider shall maintain any Declarations of ECC-Rater Company Separation of

p.65(iv) A failed onsite audit of the tested dwelling unit shall constitute a

p.66c. Shadow audits are limited to QII verifications where the ECC-Rater

p.70i. The notice of suspension shall be in writing and include the basis for

p.59course descriptions, web pages, slides, videos, handouts, and manuals)

p.62the Building Energy Efficiency Standards, Reference Appendices RA1, RA2, RA3,

p.60procedures. The ECC-Provider shall retain all results for five years from the date

p.61Triennial Code Cycle include modifications or new diagnostic test procedures or field

p.63Services (Section 10-103.3(f)2Diii) in the ECC-Provider data registry such that it is accessible for verification by the Energy Commission and local enforcement agencies.

p.68investigate a query.

p.69needed from the ECC-Rater. The ECC-Rater shall have 10 days to provide

p.64c. At a minimum, onsite audits shall include all of the following:

p.67f. If the desk audit shows that the ECC-Rater did not accurately perform

p.59unless the department, office, or agency has given permission to do so,

p.62RA4, NA1, NA2, and JA7.

p.65failed onsite audit for the ECC-Rater. A failed onsite audit of

p.66shall make the necessary observations and record results.

p.70suspension, duration of suspension, and all corrective action the ECC-Rater

p.60of the test. The practical test shall comply with the following:

p.61verifications.

p.69additional information to the ECC-Provider. Within 30 days of the date of the

p.68C. ECC-Rater and ECC-Rater Company-Initiated Queries and Complaints. ECC-Providers

p.59and then only if usage adheres to respective guidelines. The logo may

p.65either the tested or untested dwelling unit shall be recorded in

p.67the field verification and diagnostic test or accurately collect or report

p.70must complete during suspension.

p.62ii. Discipline procedure for ECC-Raters (Section 10-103.3(d)7) and ECC-Rater

p.64(i) A verification of correctly completed certificates of installation

p.66d. Reserved.

p.635. Quality Assurance. An ECC-Provider shall maintain a quality assurance program to ensure

p.69notice of violation or within 20 days of receiving a response or additional

p.60a. All practical tests shall be performed in any Commission approved

p.612. ECC-Rater Certification.

p.59appear without express permission on official publications whether

p.65the ECC-Provider’s quality assurance database (Section 10-

p.67data, the ECC-Provider shall initiate disciplinary action (Section 10-

p.68shall have a system for ECC-Raters and ECC-Rater Companies to report potential

p.70ii. The ECC-Rater shall have 10 days of receipt of the notice of suspension to

p.62Companies (Section 10-103.3(d)8), and the appeal process (Section 10-

p.64(if the ECC-Rater is acting as the Authorized Representative

p.66e. The shadow audit results shall be documented by the ECC-Provider,

p.63appropriate oversight of the ECC-Raters it certifies. This program shall, at a minimum, include the

p.69information from the ECC-Rater, whichever is later, the ECC-Provider shall

p.59distributed in whole or in part.

p.60facility as required by the Laboratory Training Requirements in Section

p.65103.3(d)9B). A failed onsite audit of either the tested or untested

p.67103.3(d)7).

p.68violations of these regulations by ECC-Raters, ECC-Rater Companies, and ECC-Providers.

p.61A. Certification Requirements. Certification as an ECC-Rater is limited to a single Triennial

p.62103.3(h)).

p.64under Section 10-103(a)3A) and verification (Section 10-

p.70respond in writing. If the ECC-Provider receives a response, the ECC-Provider

p.63following:

p.66provided to the ECC-Rater and ECC-Rater Company, and recorded in

p.69provide a final determination of a violation to the ECC-Rater, any affected

p.6010-103.3(d)1Aiv.

p.65dwelling unit shall be reported to the developer, ECC-Rater, and

p.59v. Laboratory Training. Laboratory training shall cover all FV&DT procedures listed

p.67D. Remedy for Flawed Field Verification and Diagnostic Tests

p.687. ECC-Rater Discipline. If an ECC-Rater violates these regulations, including but not limited to the

p.61Code Cycle. The ECC-Provider shall record each Triennial Code Cycle for which an

p.64103(a)4) for the project.

p.70shall acknowledge the response and, within 10 days, request additional

p.62iii. Quality assurance process (Section 10-103.3(d)5).

p.66the ECC-Provider’s quality assurance database (Section 10-103.3(d)9B).

p.69homeowners, and any ECC-Rater Company for which the ECC-Rater performs

p.63A. Quality Assurance Staff. ECC-Providers shall maintain the necessary qualified staff to

p.65ECC-Rater Company as soon as is possible. Failed onsite audits of

p.60b. All practical tests shall be in-person only using a live proctor with no

p.59in Building Energy Efficiency Standards Reference Appendices RA1, RA2, RA3,

p.61individual ECC-Rater has been certified to provide field verification and diagnostic test

p.68failure to perform accurate and complete field verification and diagnostic tests, the ECC-Provider

p.70information needed from the ECC-Rater. The ECC-Rater shall have 10 days to

p.64(ii) Performance of the field verification and diagnostic test that

p.67i. A flawed field verification and diagnostic test is any field verification and

p.62iv. Conflict of interest requirements (Section 10-103.3(b)1).

p.66f. If the shadow audit reveals the ECC-Rater did not accurately perform

p.69field verification and diagnostic testing services. The violation shall not be

p.63ensure a functioning quality assurance program that includes, at a minimum, performing

p.65dwelling units within a sample-group shall not be deemed to fail

p.59RA4, NA1, and NA2 and comply with the following requirements:

p.60more than five test takers to one proctor.

p.61services. For each Triennial Code Cycle, an ECC-Provider shall certify an eligible ECC-Rater

p.68shall take the following disciplinary steps to address and correct the noncompliance. In the event

p.70provide additional information to the ECC-Provider. Within 30 days of the date

p.64was performed by the ECC-Rater.

p.67diagnostic test that is inconsistent with an audit, or that is otherwise

p.69effective until the ECC-Rater has exhausted the right to request reconsideration

p.63the types of quality assurance reviews listed in Section 10-103.3(d)5 on ECC-Raters. Any

p.66the QII test or accurately collect or report data, the ECC-Provider shall

p.62v. Prohibition on False, Inaccurate, or Incomplete Information (Section 10-

p.65or impact in any way the compliance status of the sample-group.

p.61applicant who meets the minimum requirements for an ECC-Rater, as verified by the

p.68of a severe violation, however, the ECC-Provider shall proceed immediately to the suspension

p.70of the notice of suspension or within 20 days of receiving a response or

p.59a. All laboratory training facilities shall be designed to provide consistent

p.60c. Any equipment required to complete the practical test shall be made

p.67determined by the Executive Director, the Commission, or the ECC-Provider to

p.64d. A passing result shall include the following at a minimum:

p.69by the ECC-Provider or until the time to exercise that right has lapsed (Section

p.63form of audit is subject to the same standards of required conduct as any other field

p.66initiate disciplinary action (Section 10-103.3(d)7).

p.62103.3(b)2).

p.65g. If the ECC-Provider is refused access to the development, the ECC-

p.61ECC-Provider, and completes and passes all training requirements. Prior to certification,

p.68step for the first severe violation and to the decertification step for a second severe violation. A

p.70additional information from the ECC-Rater, whichever is later, the ECC-Provider

p.59and repeatable practical training exercises and be approved in advance

p.60available to each test taker. Test takers shall not work in teams to

p.67be untrue or inaccurate.

p.6910-103.3(d)7Aiv).

p.63verifications and diagnostic tests and is also subject to Quality Assurance review. Quality

p.64(i) Correct and completed certificates of installation (if the ECC-

p.66iii. Reserved

p.61an ECC-Provider shall advise the ECC-Rater applicant on the required conduct for ECC-

p.624. ECC-Rater Company Certification

p.65Rater may be subject to investigation and disciplinary action at the

p.68severe violation of these regulations includes knowingly creating false field verification or

p.70shall provide a final determination of suspension to the ECC-Rater and any ECC-

p.59by the Commission.

p.60complete any portion of the practical test.

p.67ii. The ECC-Rater or ECC-Rater Company is responsible for remedying any flawed

p.63Assurance staff may not include active ECC-Raters.

p.69B. Step 2: Probation. If an ECC-Rater fails to comply with a notice of violation within the

p.64Rater is signature authorized under Section 10-103(a)3A) and

p.61Raters in Section 10-103.3(e), the progressive discipline requirements in Section 10-

p.65discretion of the ECC-Provider. The onsite results shall be documented

p.66iv. Desk Audits. Desk audits consist of an ECC-Provider using registered compliance

p.68diagnostic testing documents, any violation involving criminal activity, coordinating or

p.70Rater Company for which the ECC-Rater performs field verification and

p.62A. Certification Requirements. An ECC-Provider shall certify an eligible ECC-Rater Company

p.59b. Laboratory training shall be conducted in a controlled space with

p.60d. All practical tests shall be approved by the Commission by

p.67field verification and diagnostic tests identified by audit or by any other means.

p.69specified timeframe or receives a second notice of violation within a three-month

p.63B. Exemplary ECC-Rater. An ECC-Rater is designated as an “Exemplary ECC-Rater” once the

p.64verification (Section 10-103(a)4) for the project free from

p.61103.3(d)7, and the appeal process in Section 10-103.3(h).

p.65by the ECC-Provider, provided to the ECC-Rater and ECC-Rater

p.68participating in an organized scheme to violate these regulations, or a demonstrated pattern of

p.70diagnostic testing services. The suspension shall not be effective until the ECC-

p.66documents within an ECC-Provider data registry to evaluate an ECC-Rater’s

p.62applicant that meets the minimum requirements for an ECC-Rater Company, as verified

p.59appropriate safety measures such as proper ventilation, safe egress,

p.60demonstration during the application process (Section 10-103.3(c)1).

p.67iii. A flawed field verification and diagnostic test is remedied by providing an

p.69period, the ECC-Provider shall issue a notice to the ECC-Rater and any ECC-Rater

p.63ECC-Rater has been (1) continuously certified as an ECC-Rater for a minimum of 5 years

p.64false, inaccurate, or incomplete information.

p.65Company, provided to the homeowner, and recorded in the ECC-

p.68violating these regulations. The ECC-Provider and ECC-Rater may extend, by written agreement,

p.70Rater has exhausted their right to appeal pursuant to Section 10-103.3(h) or

p.66Certificates of Compliance (Section 10-103(a)), Certificates of Installation

p.61B. Certification Agreement. Prior to certification, the ECC-Provider shall ensure that the

p.62by the ECC-Provider, and completes and passes all training requirements. Prior to

p.59appropriate lighting, and fire response systems. Laboratory training

p.60viii. Proctoring Software. Any proctoring software or learning management system

p.69Company for which the ECC-Rater performs field verification and diagnostic testing

p.63and (2) confirmed for designation by the applicable ECC-Provider after passing all

p.67additional field verification and diagnostic test to the hiring party that corrects

p.64(ii) All field verification and diagnostic test audit results that

p.65Provider’s quality assurance database (Section 10-103.3(d)9B).

p.68the time for response, reply, and final determination for each step below. At any time, the

p.70until the time to exercise their right to appeal has lapsed.

p.66(Section 10-103(b), and Certificates of Verification (Section 10-103(d)) for

p.61applicant signs the ECC-Rater Agreement with the ECC-Provider, in which the ECC-Rater

p.62certification, an ECC-Provider shall advise the ECC-Rater Company applicant on the

p.59must not be conducted in an occupied residence.

p.69services, placing the ECC-Rater on probation for up to six months.

p.60that includes proctoring features used for training and exams shall be approved

p.63required quality assurance audits within a 12-month period, including at least one

p.67the untrue or inaccurate reporting.

p.68Executive Director may direct an ECC-Provider to investigate an ECC-Rater or discipline an ECC-

p.64include a field test or measurement must pass as required in

p.66consistency and accuracy. ECC-Providers shall perform desk audits of all

p.65h. If the onsite audit reveals the ECC-Rater did not accurately perform the

p.70iii. Once the suspension becomes effective, the ECC-Provider shall prohibit the

p.61shall agree, at minimum, to comply with all applicable laws and regulations, including the

p.62required conduct for ECC-Rater Companies in Section 10-103.3(f)2, the discipline

p.59c. All laboratory training shall be in person and be supervised by an

p.60in advance by the Commission and comply with the following:

p.63annual quality insulation installation (QII) shadow audit and one desk audit.

p.69i. While on probation, the ECC-Rater shall be required to retake the training for

p.67E. Payment of Fees; Proportionality. As part of their contractual arrangements with ECC-

p.68Rater pursuant to Sections 10-103.3(d)7A through 10-103.3(d)7D.

p.64the Building Energy Efficiency Standards, Reference

p.66certified ECC-Raters at least once per year and as directed by the Commission or

p.61requirements provided in Section 10-103.3, and shall maintain a copy of the signed

p.65field verification and diagnostic test or accurately collect or report

p.70ECC-Rater from submitting any new compliance documents (Section 10-103) or

p.62requirements Section 10-103.3(d)8 and the appeal process in Section 10-103.3(h).

p.59instructor with no more than ten students to one instructor.

p.60a. Proctoring software for training or exams must be time limited.

p.69both written and laboratory (Section 10-103.3(d)1Ai and Section 10-

p.63i. The ECC-Provider shall immediately revoke this designation for any audit failure

p.64Appendices RA1, RA2, RA3, RA4, NA1, and NA2.

p.66at the discretion of the ECC-Provider. For Exemplary ECC-Raters, the desk audit

p.67Raters, ECC-Providers may charge a Quality Assurance fee. The entirety of any Quality

p.68A. Step 1: Notice of Violation. Upon identification of one or more violations of these

p.61agreement.

p.65data, the ECC-Provider shall initiate disciplinary action (Section 10-

p.70otherwise accessing the ECC-Provider data registry until the suspension has

p.62B. Certification Agreement. The ECC-Rater Company applicant shall sign the ECC-Rater

p.59Laboratory instruction shall include an electronic or hardcopy manual

p.69103.3(d)1Aii) and pass the required testing (Section 10-103.3(d)1Av and Section

p.63or the failure to be recertified as an ECC-Rater in any subsequent Triennial Code

p.66frequency shall be reduced from once per year to once per Triennial Code Cycle.

p.67Assurance fee may only be used by the ECC-Provider to fund Quality Assurance activities.

p.60b. Proctoring software shall monitor the computer desktop, webcam

p.64e. Onsite audits shall be performed when an ECC-Provider is investigating

p.65103.3(d)7).

p.68regulations by an ECC-Rater, the ECC-Provider shall issue a notice of violation to the ECC-

p.70ended.

p.61C. Eligibility. An ECC-Rater is eligible if they have not been prohibited from practicing by

p.62Company agreement with the ECC-Provider in which the ECC-Rater Company shall agree,

p.59for each student.

p.6910-103.3(d)1Avi) related to the violated regulations.

p.63Cycle.

p.66Desk audits shall comply with the following:

p.676. Queries and Complaints

p.68Rater and any ECC-Rater Companies for which the ECC-Rater performs FV&DT services.

p.60video, and audio of the individual completing the training or exam. The

p.64a complaint from a homeowner about a field verification and

p.65i. Onsite audits shall include the use of photographic evidence to be

p.70D. Step 4: Decertification. If an ECC-Rater fails to comply with the terms of suspension or

p.61the Executive Director or Commission pursuant to Section 10-103.3(g)1.

p.62at minimum, to comply with all applicable laws and regulations, including the

p.59d. Any equipment necessary to complete the laboratory training shall be

p.69ii. The notice shall be in writing and include a description of the regulatory

p.66a. ECC-Providers shall develop and document a maximum variance for

p.68The ECC-Rater Company or Independent Rater shall notify the affected homeowner and

p.60proctoring software, including any interactions with a proctoring

p.63ii. This designation, once obtained, may be included in marketing materials. If this

p.64diagnostic test.

p.65recorded in the ECC-Provider data registry as provided in Building

p.67A. Public Queries and Complaints. ECC-Providers shall have a system for receiving queries

p.70receives a new notice of violation while suspended or while a notice of suspension is

p.62requirements provided in this Section 10-103.3.

p.61D. The ECC-Provider shall maintain a list of all certified ECC-Raters with the following

p.59available to students at a ratio of no greater than one test equipment

p.68show proof of such notice to the ECC-Provider. Within 3 months of issuance of the

p.69requirements and violations, the date and approximate time of the violations,

p.60service, shall take reasonable steps to detect the use of prohibited

p.63designation is revoked, it shall be removed from marketing materials within 10

p.66each data entry point for each field verification and diagnostic test.

p.64f. Onsite audits shall be performed for every 100 dwelling units or single-

p.65Energy Efficiency Standards Reference Appendix JA7.5.6.3.

p.70pending, the ECC-Provider shall issue a notice of decertification to the ECC-Rater and any

p.67and complaints from consumers, ECC-Raters, ECC-Rater Companies, authorities having

p.61information:

p.62C. Public List. ECC-Providers shall maintain a publicly available list of certified ECC-Rater

p.59per five students. Each student shall perform the laboratory training

p.68Notice of Violation, the ECC-Provider will perform a desk audit (Section 10-103.3(d)5Civ)

p.69the parties affected by the violations, any corrective action the ECC-Rater must

p.60outside resources on the exam, and return a failing grade if the use of

p.63business days.

p.66b. ECC-Providers shall identify a project to audit where the ECC-Rater

p.70ECC-Rater Company for which the ECC-Rater performs field verification and diagnostic

p.64family residences (or both in combination) in a single development

p.67jurisdiction, and the general public. The ECC-Provider shall respond to, investigate, and

p.65ii. Shadow Audits. A shadow audit requires the ECC-Provider to audit the ECC-

p.62Companies.

p.61i. First and last name.

p.59independently with full access to the necessary equipment.

p.68on the ECC-Rater.

p.69take, any costs the ECC-Rater must reimburse, and the timeframe for complying

p.60prohibited outside resources are in fact detected.

p.70testing services.

p.63C. Types of Quality Assurance Review. Quality Assurance Review shall take the form of

p.64constructed by a single developer that make use of the sample-group

p.66provided field verification and diagnostic test services. The ECC-

p.67resolve queries and complaints related to field verification and diagnostic testing in a

p.65Rater as they perform a Quality Insulation Installation field verification (Building

p.62D. Eligibility. An ECC-Rater Company is eligible if it meets the minimum qualifications

p.59vi. Written test. An ECC-Rater applicant shall take a written test, offered by an

p.61ii. Business contact information.

p.69with all requirements of the notice of violation.

p.68i. The ECC-Provider shall require the ECC-Rater take additional training or other

p.60B. Challenge Test. An ECC-Provider may also offer challenge testing that evaluates

p.63onsite, shadow, and desk audits.

p.64provisions (Building Energy Efficiency Standards Reference Appendix

p.66Provider shall collect all compliance documents associated with the

p.67timely manner. ECC-Providers shall ensure the ECC-Raters they certify inform field

p.70i. The notice of decertification shall be in writing and include the basis for

p.65Energy Efficiency Standards Reference Appendix RA3.5). The ECC-Provider’s

p.62enumerated in Section 10-103.3(f)1B and has not been prohibited from practicing by the

p.59ECC-Provider, to confirm the applicant’s understanding of all mandatory

p.69iii. The ECC-Rater will have 10 days of receipt of the notice of probation to respond

p.61a. Phone.

p.68corrective action related to the violations within a specified timeframe.

p.60competence in all subjects specified in Sections 10-103.3(d)1Ai and 10-103.3(d)1Aii. If a

p.64RA 2.6) beginning with the hundredth dwelling unit or single family

p.66project as necessary to audit the field verifications and diagnostic tests

p.67verifications and diagnostic testing service recipients about the query and complaint

p.65auditor shall observe and may not aid the ECC-Rater during the shadow audit.

p.70decertification.

p.63i. Onsite Audits. The ECC-Provider performs an onsite audit following field

p.62Executive Director or Commission pursuant to Section 10-103.3(g)2.

p.59training information specified in Sections 10-103.3(d)1Ai and 10-103.3(d)1Aii.

p.69in writing. If the ECC-Provider receives a response, the ECC-Provider shall

p.60challenge test is used it must comply with the following requirements:

p.64residence. Nothing in this provision shall require that any dwelling unit

p.66performed by the ECC-Rater at the project site and may contact

p.67system. ECC-Providers shall retain all records of queries and complaints, the

p.68ii. The ECC-Provider shall inform the ECC-Rater of their responsibilities for the

p.61b. Address.

p.65All ECC-Raters shall receive a shadow audit for QII once per year. For Exemplary

p.63verification and diagnostic testing by an ECC-Rater it certified. Onsite audits are

p.70ii. The ECC-Rater will have 10 days of receipt of the notice of decertification to

p.59Tests shall only be used to verify the knowledge of ECC-Rater applicants and

p.62E. After its initial certification, an ECC-Rater Company does not need to complete the

p.69acknowledge the response and, within 10 days, request additional information

p.64in any sample-group remain open beyond the requirements in Building

p.66outside authorities, such as the local building authority with

p.67corresponding investigation, and the response for a minimum of 5 years from receipt of

p.60i. Only an ECC-Rater with a current and valid certification shall be eligible to sit for

p.65ECC-Raters, the shadow audit frequency shall be reduced from once per year to

p.68following: the ECC-Rater shall be responsible for the costs of quality assurance

p.63performed at the invitation of the homeowner through the complaint process,

p.61c. Email.

p.70respond in writing. If the ECC-Provider receives a response, the ECC-Provider

p.59may not be used for training purposes. ECC-Providers shall retain all results for

p.62training curriculum again or be recertified for each Triennial Code Cycle as long as it

p.69needed from the ECC-Rater. The ECC-Rater shall have 10 days to provide

p.64Energy Efficiency Standards Reference Appendix RA 2.6. These onsite

p.66jurisdiction over the project.

p.67the query or complaint. ECC-Providers shall annually report to the Commission a

p.65once per Triennial Code Cycle. A shadow audit shall also be performed if

p.68testing and additional training for the violations, and the ECC-Rater shall be

p.60a challenge test. ECC-Raters with a suspended certification are not eligible.

p.63at the request of the Commission, or at the discretion of the ECC-Provider.

p.70shall acknowledge the response and, within 10 days, request additional

p.59five years from the date of the test. The written test shall comply with all of the

p.61iii. Certification status, limited to Certified-Active, Exemplary-Active, notice of

p.62maintains its eligibility under Section 10-103.3(f)1B.

p.69additional information to the ECC-Provider. Within 30 days of the date of notice

p.64audits shall comply with the following:

p.67summary of all queries, complaints, and actions taken over the last 12 months. The

p.65requested by the Commission or at the discretion of the ECC-Provider. Shadow

p.66c. The ECC-Provider shall confirm the measurements, calculations, and

p.68responsible for the costs to the property owner for the original field verification

p.63Every year, at least one onsite audit shall be performed by the ECC-Provider for

p.60ii. The challenge test shall include a written test to be taken using a live proctor.

p.70information needed from the ECC-Rater. The ECC-Rater shall have 10 days to

p.59following:

p.61violation, Probation, Suspended, Decertified, Inactive.

p.69of probation or within 20 days of receiving a response or additional information

p.62F. The ECC-Provider shall maintain a list of all certified ECC-Raters Companies with the

p.67Queries and Complaints Annual Summary shall include all of the following for each query

p.64(i) The ECC-Provider shall perform the onsite audit at an untested

p.65audits shall comply with the following:

p.68and diagnostic test and any necessary retesting because of the violations. The

p.63each ECC-Rater it has certified, either at random or as directed above. For

p.66other information obtained during field verifications and diagnostic

p.70provide additional information to the ECC-Provider. Within 30 days of the date

p.60iii. The challenge test shall include no less than 100 and no more than 1,000

p.59a. Be online using proctoring software (Section 10-103.3(d)1Avii) or in

p.69from the ECC-Rater, whichever is later, the ECC-Provider shall provide a final

p.613. ECC-Rater Company Training. For each Triennial Code Cycle, the ECC-Provider shall develop and

p.67or complaint received:

p.62following information:

p.68ECC-Provider shall not be responsible for any costs related to flawed field

p.63Exemplary ECC-Raters, the minimum onsite audit frequency shall be reduced

p.64home and a tested home.

p.66tests at the project are within expected tolerances.

p.65a. The ECC-Rater shall be informed of the shadow audit for scheduling

p.70of the notice of decertification or within 20 days of receiving a response or

p.60questions prepared by the ECC-Provider.

p.69determination of probation to the ECC-Rater and any affected ECC-Rater

p.59person using a live proctor.

p.61maintain a course of training to summarize the responsibilities of the ECC-Rater Company in the

p.67i. A tracking number identifying each query or complaint in the ECC-Provider

p.68verification and diagnostic test as performed by the ECC-Rater.

p.62i. First and last name of certified primary.

p.63from once per year to once per Triennial Code Cycle. The audit results shall be

p.64(ii) If the ECC-Provider is refused access to the development, all

p.65purposes and the ECC-Provider’s auditor will explain their presence to

p.66d. The ECC-Provider shall compare the field verification and diagnostic

p.70additional information from the ECC-Rater, whichever is later, the ECC-Provider

p.69Company. The terms of probation shall last no more than six months and shall

p.60iv. The challenge test shall comply with all requirements in Section 10-

p.61performance of field verifications and diagnostic testing as prescribed in Section 10-103.3(d)3.

p.59b. Consist of between 10 and 100 questions per subject area specified in

p.63included in the annual reporting to the Commission (Section 10-103.3(d)11E) or

p.67queries and complaints tracking system.

p.68iii. The notice of violation shall be in writing and include a description of the

p.65the homeowner. The homeowner may grant entry to the auditor. If

p.70shall provide a final determination on proceeding with decertification to the

p.62ii. ECC-Rater Company name.

p.64sample-groups for the development will be considered

p.66test results from the project site to no less than 20 other field

p.69not be effective until the ECC-Rater has exhausted the right to request for

p.60103.3(d)1Avi.

p.61The ECC-Rater Company training may not exceed 8 hours in duration. All training materials shall

p.59Sections 10-103.3(d)1Ai and 10-103.3(d)1Aii.

p.63provided in response to a request by the Commission. Onsite audits shall

p.65entry is refused, the ECC-Provider shall reschedule the shadow audit.

p.67ii. The name and contact phone or email of the person(s) submitting the query or

p.68regulatory requirements and violations, the date and approximate time of the

p.70ECC-Rater and any ECC-Rater Company for which the ECC-Rater performs field

p.64conflicted data (Section 10-103.3(b)1B).

p.66verification and diagnostic test results performed by the same ECC-

p.62iii. Business contact information.

p.69reconsideration by the ECC-Provider or until the time to exercise that right has

p.61be approved by the Commission as part of the ECC-Provider’s application (Section 10-103.3(c)1).

p.60C. Training and Testing for Subsequent Triennial Code Cycle Updates. An ECC-Provider

p.63comply with the following:

p.59c. Require a passing score of no less than 70 percent.

p.68violations, the parties affected by the violations, any corrective action the ECC-

p.70verification and diagnostic testing services. The decertification shall not be

p.66Rater on other project sites prior to the audited project. If the

p.67complaint.

p.65b. For newly constructed buildings, the developer or contractor shall not

p.64(iii) At the discretion of an ECC-Provider, this onsite audit may also

p.69lapsed (Section 10-103.3(d)7Biii).

p.61An ECC-Provider’s training curriculum for ECC-Rater Company applicants must, at minimum,

p.62a. Phone.

p.60shall provide training to previously certified ECC-Raters on changes made during any

p.68Rater shall take, any costs the ECC-Rater shall reimburse, the timeframe for

p.70effective until the ECC-Rater has exhausted their right to appeal pursuant to

p.63a. Onsite audits must not be performed in the presence of the ECC-Rater

p.66comparison suggests the subject project results could have been

p.59d. Be approved by the Commission at the time of ECC-Provider

p.65refuse a shadow auditor if sampling is being used on the development.

p.67iii. A summary of the query or complaint.

p.64be used to satisfy the requirements for an onsite audit as

p.61include all of the following:

p.69C. Step 3: Suspension. If an ECC-Rater fails to fully comply with the terms of probation or

p.60Triennial Code Cycle update that would affect the performance of field verification and

p.62b. Address.

p.68complying with all requirements of the notice of violation.p.69

p.70Section 10-103.3(h) or until the time to exercise their right to appeal has lapsed.

p.63and can be performed any time after the ECC-Rater has left the project

p.66copied from prior project sites, the ECC-Provider shall investigate

p.65If the auditor is refused entry, the data registry will not accept sample-p.66

p.59application (Section 10-103.3(c)1).p.60

p.64required by Section 10-103.3(d)5Ci (Onsite Audits) or, ifp.65

p.67iv. A summary of the results of the ECC-Provider investigation and related actions.

p.69receives a new notice of violation while on probation, the ECC-Provider shall issue ap.70

p.61A. A summary of the training curriculum for ECC-Rater applicants provided in Section 10-

p.60diagnostic testing, including changes that would trigger testing or in testing procedures.

p.63site.p.64

p.66further to determine if results were falsified or otherwise inaccurate.p.67

p.62c. Email.p.63

p.67v. A summary of the resolution of the query or complaint.p.68

p.60The Triennial Code Cycle Update training and testing shall comply with all Section 10-p.61

p.61103.3(d)1.p.62

p.59CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.60CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.61CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.62CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.63CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.64CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.65CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.66CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.67CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.68CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.69CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM

p.70CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM