p.718. ECC-Rater Company Discipline. If an ECC-Rater Company violates these regulations, the ECC-
p.72B. Step 2: Probation. If an ECC-Rater Company fails to complete all corrective actions and
p.74i. An ECC-Provider shall record all Quality Assurance and disciplinary actions taken
p.75D. ECC-Providers shall maintain digital copies of all files that can be indexed and searched
p.82B. ECC-Rater Companies shall have view-only access to the compliance documents
p.73suspension is pending, the ECC-Provider shall issue a notice of decertification to the ECC-
p.76project, and code violations for each failed audit (as prescribed in Section 10-
p.77Reference Joint Appendix JA7. Requests for data shall be limited to information needed to
p.78needed from the ECC-Provider. The ECC-Provider will have 5 days to provide additional
p.79terms of suspension and proposed effective date. Within 30 days of the date of
p.80remediated ECC-Provider eligible to submit an ECC-Provider Application
p.81and diagnostic test activity, the ECC-Rater shall be able to directly monitor and verify
p.71Provider shall take the following disciplinary steps to address and correct the noncompliance.
p.72reimburse all costs specified for a violation within the required timeframe or receives
p.73Rater Company.
p.74against each ECC-Rater and ECC-Rater Company.
p.75at a minimum by calendar year or designated code cycle. It is the responsibility of ECC-
p.76103.3(d)5).
p.77confirm compliance with, assess the Section 10-103.3 ECC Program, or both.
p.78information to the Executive Director. Within 30 days of the date of the notice of
p.79the notice, the ECC-Provider may appeal the new terms pursuant to Section 10-
p.80pursuant to Section 10-103.3(c)3 according to the process set out in Section 10-
p.81that any tests or measurements were performed properly in accordance with
p.82registered by its ECC-Rater.
p.71However, in the event of a severe violation, the ECC-Provider shall proceed immediately to the
p.72two violations within a three-month period, the ECC-Provider shall issue a notice of
p.75Providers to maintain the necessary systems to support these functions, unless the
p.78violation or within 20 days of receiving additional information from the ECC-Provider,
p.79103.3(h) or accept the new terms. If the ECC-Provider does not respond to the
p.80110. A remediated ECC-Provider is only eligible for a full application pursuant to
p.81regulations.
p.73i. The notice of decertification shall be in writing and include the basis for
p.74ii. The ECC-Provider shall maintain a database tracking system indicating the
p.76ii. The ECC-Provider shall submit all Quality Assurance Quarterly Reports to the
p.77B. The provider shall comply with the request in the timeframe specified by the Executive
p.82C. ECC-Rater Companies shall not change data entered into the ECC-Provider data registry
p.71suspension or decertification step. A severe violation of these regulations includes knowingly
p.72probation to the ECC-Rater Company.
p.75Commission or Executive Director explicitly authorizes the ECC-Provider, in writing, to
p.78whichever is later, the Executive Director shall provide a final determination of a
p.79notice, the new terms shall go into effect on the 31st day after the date of the
p.80Section 10-103.3(c)3.
p.81F. ECC-Raters shall not provide information based on assumptions, averages, or otherwise
p.73decertification.
p.74certificate status of all certified ECC-Raters and ECC-Rater Companies and all
p.76Commission in a docket prepared by the Commission.
p.77Director.
p.82for any Certificates of Verification.
p.71creating false field verification or diagnostic testing documents, any violation involving criminal
p.75operate without this functionality or process.
p.78violation to the ECC-Provider.
p.79notice.
p.72i. The notice of probation shall be in writing and include the basis for probation,
p.80(e) ECC-Rater Certification and Responsibilities.
p.74Quality Assurance or disciplinary actions taken against each ECC-Rater and ECC-
p.81generated in any way other than by field verification and diagnostic testing performed in
p.73ii. The ECC-Rater Company will have 10 days of receipt of the notice of
p.76F. Quality Assurance Annual Report.
p.77C. ECC-Providers have the sole responsibility to ensure that their systems can comply with
p.82D. ECC-Rater Companies may be the “Document Author” for Certificates of Compliance and
p.71activity, coordinating or participating in an organized scheme to violate these regulations, or a
p.75E. Nothing in this subsection shall be construed as requiring an ECC-Provider to process, re-
p.78B. Step 2: Probation. If an ECC-Provider fails to complete all corrective action prescribed by
p.79iv. 180-day Report. After 180 days of suspension, the Executive Director has 30
p.72the duration of probation, and all corrective action the ECC-Rater Company
p.74Rater Company.
p.81accordance with these regulations. Any such information is presumed to be untrue,
p.801. Certification.
p.73decertification to respond in writing. If the ECC-Provider receives a response,
p.77the data request provisions of this subsection, including providing the Commission with
p.82Certificates of Installation registered in the ECC-Provider data registry but may not sign
p.76i. An ECC-Provider shall submit a Quality Assurance Annual Report to the
p.71demonstrated pattern of violating these regulations. The ECC-Provider and ECC-Rater Company
p.72must complete during probation.
p.75package, or otherwise modify any historical information collected prior to January 1,
p.78the Executive Director within the specified timeframe or receives a second notice of
p.79days to send to the ECC-Provider’s Designated Contact and publicly post a 180-
p.81inaccurate, and/or incomplete unless the ECC-Rater has the written permission of the
p.74iii. Quality Assurance Data regarding ECC-Raters and ECC-Rater Companies shall
p.73the ECC-Provider shall acknowledge the response and, within 10 days, request
p.77reasonable access to any and all compliance documents, including Compliance
p.82as the “Responsible Person” or “Installing Technician” (Sections 10-103(a)1 and 10-
p.80A. Certification Process. ECC-Rater applicants shall apply to a Commission approved ECC-
p.76Commission for each calendar year no later than the end of February of the
p.71may extend, by written agreement, the time for response, reply, and final determination for each
p.752026.
p.78violation within a three-month period, the Executive Director shall issue a notice of
p.79day report that includes each outstanding violation, a timeline of when notices
p.81Executive Director that explains how that information is collected and why such data is
p.72ii. The ECC-Rater Company will have 10 days of receipt of the notice of probation
p.73additional information needed from the ECC-Rater Company. The ECC-Rater
p.74include all of the following:
p.77Registration Packages, submitted within the past 10 years.
p.82103(a)3).
p.76following year.
p.80Provider for certification pursuant to the application process established by the ECC-
p.71step below. At any time, the Executive Director may direct an ECC-Provider to investigate an ECC-
p.78probation to the ECC-Provider’s designated contact. The Executive Director shall also
p.79of potential violation and notices of violation were given for each outstanding
p.81not untrue, inaccurate, and/or incomplete.
p.7511. Data Reporting. ECC-Providers shall comply with the following reporting requirements:
p.72to respond in writing. If the ECC-Provider receives a response, the ECC-Provider
p.73Company shall have 10 days to provide additional information to the ECC-
p.74a. Name, business address, and contact information for each certified
p.7713. Data Registry Requirements. ECC-Providers must comply with all data registry requirements
p.82i. An ECC-Rater or ECC-Rater Company may sign the Certificate of Installation as the “Authorized Representative” if they have a Delegation of Signature Authority (Section 10-103(a)3A) agreement with the Responsible Person and in place with ECC-Provider.
p.80Provider.
p.71Rater Company or discipline an ECC-Rater Company pursuant to Section 10-103.3(d)8.
p.76ii. The Quality Assurance Annual Report shall include all specified records within
p.78publicly post the notice of probation. The notice shall be in writing, include a description
p.79violation, the date the probation began, the date suspension began and all
p.81G. ECC-Raters not employed by an ECC-Rater Company are considered independent.
p.72shall acknowledge the response, and, within 10 days, request additional
p.73Provider. No earlier than 30 days of the date of the notice of suspension or 20
p.75A. ECC-Providers shall maintain a database of the information specified in Section 10-
p.74ECC-Rater, ECC-Rater Company, or applicant.
p.77provided by the Building Energy Efficiency Standards Reference Joint Appendix JA7, and Section
p.80B. Minimum Qualifications. ECC-Rater applicants shall have completed all training set forth
p.76the annual timeframe.
p.71A. Step 1: Notice of Violation. Upon identification of one or more violations of these
p.78of the regulatory requirements and violations, and specify the probation duration. The
p.79terms of suspension, any amendments during the suspension, all steps the
p.72information needed from the ECC-Rater Company. The ECC-Rater Company
p.73days of receiving a response or additional information from the ECC-Rater,
p.81Independent ECC-Raters shall submit an Annual Activity Report no later than the end of
p.75103.3(d)9A and in compliance with Building Energy Efficiency Standards, Reference
p.7710-109.
p.74b. Current status of certification, limited to one of the following:
p.80in Section 10-103.3(d)1.
p.71regulations by an ECC-Rater Company, the ECC-Provider shall issue a notice of violation
p.76iii. The Quality Assurance Annual Report shall summarize all quality assurance
p.78ECC-Provider will have 10 days of receipt of the notice of probation to respond in
p.79Executive Director is aware that the ECC-Provider has taken to remedy each
p.72shall have 10 days to provide additional information to the ECC-Provider. Within
p.73whichever is later, the ECC-Provider shall provide a final determination of
p.81March of each year starting in 2027 to the Commission that includes the information
p.75Appendix JA7, for the greater of: 500 buildings field verified and diagnostically tested by
p.7714. No Approved ECC-Providers. If there are no certified ECC-Providers, the CEC may perform the
p.74Application-in-Review, In-training, Certified, Exemplary, Under Notice
p.82ii. The ECC-Rater Company may not provide additional project services beyond
p.71to the ECC-Rater Company and any affected homeowners.
p.78writing. If the Executive Director receives a response, the Executive Director shall
p.79violation, and any other information the Executive Director deems relevant,
p.80C. ECC-Rater Agreement. Prior to being certified, an ECC-Rater applicant shall sign the ECC-
p.76actions taken for each ECC-Rater certified by the ECC-Provider during the
p.7230 days of the date of notice of probation or within 20 days of receiving a
p.73decertification. The decertification shall not be effective until the ECC-Rater
p.81listed in Sections 10-103.3(f)2Fiii and 10-103.3(f)2Fiv.
p.75ECC-Raters certified by the respective ECC-Provider each year, or a 10 percent random
p.74of Violation, on Probation, on Suspension, Decertified, Certification
p.77ECC-Provider Responsibilities provided in Section 10-103.3(d) or suspend all or a portion of the
p.82field verification and diagnostic testing or as provided in Sections 10-103.3(f)2D
p.78acknowledge the response and, within 5 days, request additional information needed
p.79including the Executive Director’s intentions moving forward with respect to the
p.76preceding year.
p.80Rater agreement with the ECC-Provider, in which the ECC-Rater shall agree, at minimum,
p.71i. The ECC-Provider may require the ECC-Rater Company to take additional
p.72response or additional information from the ECC-Rater, whichever is later, the
p.73Company has exhausted its right to appeal pursuant to Section 10-103.3(h) or
p.813. Failure to Adhere to Required Conduct. ECC-Raters are subject to the disciplinary action set forth
p.75sample of buildings field verified and diagnostically tested by ECC-Raters certified by the
p.74Dormant (no data registration activity in one year).
p.77FV&DT program, including (but not limited to) relevant provisions of the Building Energy
p.82and 10-103.3(f)2Di, including design, construction management, permitting, or
p.78from the ECC-Provider. The ECC-Provider will have 5 days to provide additional
p.79ECC-Provider.
p.80to comply with all applicable laws and regulations, including the requirements provided
p.71training or other corrective action related to the violations within a specified
p.72ECC-Provider shall provide a final determination of probation to the ECC-Rater
p.73until the time to exercise its right to appeal has lapsed.
p.76iv. Detailed Quality Assurance Action Records (Section 10-103.3(d)9Biiid) are not
p.75respective ECC-Provider each year. Requests for data shall be limited to information
p.81in Section 10-103.3(d)7 for the failure to adhere to the required conduct and these regulations.
p.77Efficiency Standards found in the Residential Appendices RA1, RA2, RA3 and RA4; Nonresidential
p.82“Responsible Person” signatories (Sections 10-103(a)1 and 10-103(a)3) unless
p.74c. Current ECC-Provider pricing assigned to the ECC-Rater or ECC-Rater
p.78information to the Executive Director. Within 30 days of the date of the notice of
p.80in this Section 10-103.3.
p.79D. Step 4: Rescinding Approval. If an ECC-Provider fails to comply with the terms of
p.71timeframe.
p.72Company. The terms of probation shall last no more than six months and shall
p.76required to be submitted annually to the Commission but shall be subject to
p.739. Data Recording
p.75needed to confirm compliance with and/or assess the ECC program.
p.814. Appeal and Reconsideration of Discipline.
p.77Appendices NA1 and NA2; Reference Joint Appendix JA7; and Section 10-109.
p.82the ECC-Rater Company submits a Declaration of ECC-Rater Company
p.78probation or within 20 days of receiving additional information from the ECC-Provider,
p.74Company for the costs and services for field verification and diagnostic
p.72not be effective until the ECC-Rater Company has exhausted its right to request
p.79suspension or receives a new notice of violation while suspended or while a notice of
p.80D. Clean Certification Record. ECC-Providers shall not issue a new ECC-Rater certification to
p.76Commission requests for information made pursuant to Section 10-103.3(d)12.
p.71ii. The ECC-Provider shall inform the ECC-Rater Company of their responsibilities
p.73A. Data Recording for Field Verification and Diagnostic Tests. Each ECC-Provider shall
p.75B. Beginning January 1, 2027, ECC-Providers shall provide this information annually in
p.82Separation of Services as provided in Section 10-103.3(f)2Diii.
p.7715. ECC-Provider Discipline. If the Executive Director becomes aware of an ECC-Provider’s violation of
p.78whichever is later, the Executive Director shall provide a final determination of probation
p.81A. ECC-Raters may seek reconsideration and review of a disciplinary action as set forth in
p.74testing registration including any Quality Assurance fees.
p.72reconsideration by the ECC-Provider or until the time to exercise that right has
p.79suspension is pending, the Executive Director shall issue a notice of rescinding approval
p.80any ECC-Rater applicant if that applicant has an ongoing disciplinary proceeding
p.71for the following: the ECC-Rater Company shall be responsible for the costs of
p.76G. Annual Reporting Requirements Regarding ECC-Rater Companies.
p.73record all data collected by an ECC-Rater for a field verification and diagnostic test,
p.75electronic form to the Commission for evaluating the effectiveness of field verification
p.78to the ECC-Provider.
p.77these regulations, including any Conditions of Approval, the Executive Director shall take the
p.81Section 10-103.3(d)7.
p.82iii. Declaration of ECC-Rater Company Separation of Services. The Declaration of
p.72lapsed (Section 10-103.3(d)8Bii).
p.74d. Quality Assurance Actions. List and indicate pass or fail with an
p.79to the ECC-Provider’s designated contact. The rescinded approval shall not be effective
p.80requiring resolution by another ECC-Provider.
p.71quality assurance testing and additional training for the violations, and the ECC-
p.73including the following data:
p.75and diagnostic testing.
p.76i. By the first of June of each year starting in 2027, an ECC-Provider shall submit
p.77disciplinary steps necessary to address and correct the violation. Violations that trigger the
p.82ECC-Rater Company Separation of Services provides proof to the ECC-Provider
p.78C. Step 3: Suspension. If an ECC-Provider fails to complete all corrective action or receives a
p.79until the ECC-Provider has exhausted its right to appeal pursuant to Section 10-103.3(h)
p.81B. ECC-Raters may appeal a disciplinary action imposed on them as set forth in Section 10-
p.74explanation of all of the following audits for each certified ECC-Rater:
p.72C. Step 3: Suspension. If an ECC-Rater Company fails to fully comply with the terms of
p.71Rater Company shall be responsible for the costs to the property owner for the
p.80i. At a minimum, the issuing ECC-Provider shall require an ECC-Rater applicant to
p.76an ECC-Rater Company Annual Report to the Commission. The report shall be
p.73i. The registered Certificate(s) of Compliance, Certificate(s) of Installation,
p.75C. This information shall be organized according to climate zones as defined in the Building
p.77disciplinary process include failure to comply with quality assurance requirements (Section 10-
p.82showing that the ECC-Rater(s) employed or contracted by the ECC-Rater
p.78new notice of violation while on probation, the Executive Director shall issue a notice of
p.79or until the time to exercise its right to appeal has lapsed, at which time the rescinded
p.81103(h).
p.71original field verification and diagnostic test and any necessary retesting
p.72probation or receives a new notice of violation while on probation, the ECC-Provider
p.74(i) Onsite audits (Section 10-103.3(d)5Ci).
p.80attest that the ECC-Rater applicant is in good standing with all other ECC-
p.76clearly labeled as confidential and transmitted to the Commission as
p.73Certificate(s) of Verification, and their associated Compliance Registration
p.75Energy Efficiency Standards, Section 100.1(b).
p.77103.3(d)5), failure to investigate or discipline ECC-Raters and ECC-Rater Companies (Section 10-
p.82Company to provide field verification and diagnostic services is in compliance
p.78suspension to the ECC-Provider’s designated contact. The Executive Director shall also
p.79approval shall be deemed to have been imposed by the Commission.
p.71because of the violations. The ECC-Provider shall not be responsible for any
p.72shall issue a notice of suspension to the ECC-Rater Company.
p.81(f) ECC-Rater Company Certification and Responsibilities.
p.80Providers.
p.74(ii) Shadow audits (Section 10-103.3(d)5Cii).
p.76confidential submission and will be treated as such as permitted by law. The
p.73Packages.
p.77103.3(d)7 and Section 10-103.3(d)8), failure to allow the Commission full access to the ECC-
p.82with the requirements in Section 10-103.3(b)1 and is independent and acting as
p.75D. FV&DT Data Reporting. Within ninety days of the Executive Director approving a CEC-
p.78publicly post the notice of suspension. The notice shall be in writing and include a
p.79i. The ECC-Provider shall have 10 days of receipt of the notice of rescinded
p.71costs related to flawed field verification and diagnostic test as performed by the
p.72i. The notice of suspension shall be in writing and include the basis for
p.80ii. Any ECC-Provider may submit a complaint to the Commission if it suspects that
p.811. Certification.
p.76report becomes nonconfidential 5 years following submission but may receive
p.74(iii) Desk-audits (Section 10-103.3(d)5Civ).
p.77Provider data registry (Section 10-103.3(d)12), refusal to comply with Commission data requests
p.82a third party as defined by Section 10-103(a)5 from the person(s) employed or
p.73ii. The energy efficiency improvements verified or tested, if applicable.
p.78description of the regulatory requirements, violations, and proposed terms of
p.75maintained electronic document repository, an ECC-Provider shall transmit to the
p.71ECC-Rater employed by the ECC-Rater Company.
p.79approval to respond in writing. If the Executive Director receives a response, the
p.72suspension, the duration of suspension, and all corrective action the ECC-Rater
p.76confidential redesignation if the ECC-Provider requests extension of confidential
p.80an ECC-Rater with an outstanding disciplinary status requiring resolution has
p.77(Section 10-103.3(d)12), failure to cooperate in a Commission complaint investigation (Section
p.81A. Certification Process. ECC-Rater Company applicants shall apply to a Commission
p.82contracted by the ECC-Rater Company to provide services beyond the field
p.78suspension. The terms of suspension shall not be effective until the ECC-Provider has
p.74e. Detailed Quality Assurance Action Records. The ECC-Provider shall
p.75Commission electronic document depository Certificate(s) of Certification, Certificate(s)
p.73iii. Whether the builder chose to include the home in a sample for FV&DT as
p.79Executive Director shall acknowledge the response and, within 5 days, request
p.71iii. The notice of violation shall be in writing and include a description of the
p.72Company must complete during suspension.
p.76status using the steps outlined in Title 20 Cal. Code. Regs., Section 2505 et seq.
p.80been issued a new ECC-Rater certification by another ECC-Provider.
p.7710-103.3(d)12), and failure to otherwise comply with any applicable law or regulation. In the
p.81approved ECC-Provider pursuant to the application process established by the ECC-
p.82verifications and diagnostic testing services including design, construction
p.78exhausted its right to appeal pursuant to Section 10-103.3(h) or until the time to exercise
p.75of Installation, Certificate(s) of Verification documents (Section 10-103) and their
p.74keep all field notes and associated records regarding passed, warnings
p.79additional information needed from the ECC-Provider. The ECC-Provider will
p.73specified in the Residential Appendices.
p.71regulatory requirements and violations, the date and approximate time of the
p.72ii. During suspension, the ECC-Provider will disable access to its registry for all
p.77event of a severe violation, the Executive Director may proceed immediately to issue a notice of
p.802. Required Conduct.
p.81Provider.
p.82management, permitting, or “Responsible Person” signatories (Section 10-
p.78its right to appeal has lapsed, at which time the terms of suspension shall be deemed to
p.75associated Compliance Registration Packages that are registered and retained by a data
p.74issued, or failed quality assurance tests for each certified ECC-Rater for
p.79have 5 days to provide additional information to the Executive Director. Within
p.71violations, the parties affected by the violations, any corrective action the ECC-
p.73iv. Whether initial FV&DT as specified in the Residential Appendices was
p.72ECC-Raters of the ECC-Rater Company.
p.77suspension for the first severe violation and to issue a notice of decertification for a second
p.82103(a)1 and Section 10-103(a)3) on the same project.
p.78have been imposed by the Commission.
p.75registry in accordance with Section 10-103 and Building Energy Efficiency Standards,
p.76iii. The ECC-Provider shall ensure that the ECC-Rater Company Annual Report
p.80A. ECC-Raters shall provide field verification services in compliance with these regulations,
p.81B. Minimum Qualifications. At least one principal of the ECC-Rater Company applicant shall
p.74no less than 5 years.
p.7930 days of the date of the notice of rescinded approval or within 20 days of
p.71Rater Company must take, any costs the ECC-Rater Company must reimburse,
p.73conducted on the home.
p.77severe violation. A severe violation of these regulations includes knowingly creating false field
p.72iii. The ECC-Rater Company will have 10 days of receiving the notice of suspension
p.75Appendix JA7. The ECC-Provider shall submit this data no less than once per calendar
p.76includes the current ECC-Provider pricing assigned to each ECC-Rater Company
p.80including any regulations contained in the California Building Energy Efficiency Standards
p.81hold an active ECC-Rater certification issued by a Commission approved ECC-Provider or
p.82a. The ECC-Rater Company must show proof that the person(s) providing
p.78i. The ECC-Provider shall have 10 days of receipt of the notice of suspension to
p.79receiving additional information from the ECC-Provider, whichever is later, the
p.7410. Data Retention.
p.71and the timeframe for complying with all requirements of the notice of
p.73v. Whether the home in a sample was selected and verified or tested as specified
p.77verification or diagnostic testing documents, any violation involving criminal activity, coordinating
p.72to respond in writing. If the ECC-Provider receives a response, the ECC-Provider
p.75quarter and in a manner as directed by the Commission. Once implemented, this
p.76and Independent ECC-Rater for the costs of all services for field verification and
p.80and related Reference Appendices RA1, RA2, RA3, RA4, JA7, NA1, and NA2.
p.81be actively pursuing certification as evidenced by enrollment in training courses. A
p.82these additional services do not have management, hiring or firing,
p.78respond in writing. If the Executive Director receives a response, the Executive
p.79Executive Director shall provide a final determination of a rescinded approval to
p.71violation.
p.74A. An ECC-Provider shall maintain all information in the original format in which it collects,
p.77or participating in an organized scheme to violate these regulations, or a demonstrated pattern of
p.73in the Residential Appendices.
p.72shall acknowledge the response and, within 10 days, request additional
p.75requirement shall supersede the requirements of Sections 10-103.3(d)11A, 10-
p.76diagnostic testing registration, including any Quality Assurance fees.
p.81principal of an ECC-Rater Company is defined as a senior management-level employee
p.82payment or any other authority over the ECC-Rater or direct the ECC-
p.78Director shall acknowledge the response and, within 5 days, request additional
p.79the ECC-Provider.
p.80B. ECC-Raters shall not create, record, submit, or certify untrue, inaccurate, or incomplete
p.74receives, or records the data for a minimum of 10 years.
p.71iv. The ECC-Rater Company will have 10 days of receipt of the notice of violation to
p.77violating these regulations.
p.72information needed from the ECC-Rater Company. The ECC-Rater Company
p.73vi. Whether the home in a sample was selected for resampling and verified or
p.75103.3(d)11B and 10-103.3(d)11C.
p.81and is not limited to an owner or shareholder of the ECC-Rater Company.
p.82Rater activities in any regard on the same project(s).
p.78information needed from the ECC-Provider. The ECC-Provider will have 5 days
p.76H. Immediate Reporting of Disciplinary Actions. The ECC-Provider shall provide written
p.80field verification and diagnostic test information or report field verification and
p.79E. Remediation required to restore eligibility to apply to be an ECC-Provider. Once an ECC-
p.71respond in writing. If the ECC-Provider receives a response, the ECC-Provider
p.74B. ECC-Providers shall maintain a system that allows the Commission to readily search and
p.77A. Step 1: Notice of Violation. Upon identification of one or more violations of these
p.72shall have 10 days to provide additional information to the ECC-Provider. Within
p.73tested after a sampling failure was found in the sample as specified in the
p.75E. Quality Assurance Quarterly Report. The ECC-Provider shall send a report each quarter
p.78to provide additional information to the Executive Director. Within 30 days of
p.81C. Training. Prior to being certified, the ECC-Rater Company applicant shall complete all
p.76notification of any ECC-Rater or ECC-Rater Company decertification to the Commission
p.80diagnostic test results that did not comply with these regulations.
p.82b. The ECC-Rater Company must show proof that the person(s) providing
p.79Provider has been decertified, neither that entity nor any successor, subsidiary, or
p.71shall acknowledge the response and, within 10 days, request additional
p.74query compliance documents, quality assurance data, and ECC-Rater and ECC-Rater
p.7230 days of the date of the notice of suspension or 20 days of receiving a
p.77regulations by an ECC-Provider, the Executive Director shall issue a notice of violation to
p.73Residential Appendices.
p.78the date of the notice of suspension or within 20 days of receiving additional
p.75to the Commission that includes all failed quality assurance audits (Section 10-
p.76within 24 hours of decertification. The Commission shall notify all ECC-Providers of the
p.81required training provided by the ECC-Provider.
p.82these additional services is qualified to do so under Division 3 of the
p.79otherwise affiliated or substantially similar organization, is eligible to apply to operate as
p.80C. ECC-Raters shall not accept payment or other consideration in exchange for reporting a
p.71information needed from the ECC-Rater Company. The ECC-Rater Company
p.74Company information collected in accordance with ECC-Provider responsibilities (Section
p.72response or additional information from the ECC-Rater, whichever is later, the
p.77the ECC-Provider’s designated contact and publicly post the notice. The Executive
p.78information from the ECC-Provider, whichever is later, the Executive Director
p.73vii. Whether the home in a sample was verified or tested and corrective action was
p.75103.3(d)5). The ECC-Provider shall comply with all of the following:
p.76decertification and instruct all ECC-Providers to immediately suspend the ECC-Rater’s or
p.82Business and Professions Code.
p.79or apply to become a certified ECC-Provider until it has completed the following
p.81D. ECC-Rater Company Agreement. Prior to being certified, the ECC-Rater Company
p.80field verification and diagnostic test result not conducted and reported in compliance
p.71shall have 10 days to provide additional information to the ECC-Provider. Within
p.7410-103.3(d)). The Commission shall be able to search and query the information stored
p.72ECC-Provider shall provide a final determination of suspension. The suspension
p.77Director shall require the ECC-Provider to take corrective action related to the violations
p.78shall provide a final determination of a suspension to the ECC-Provider.
p.73taken after a resampling failure was found in the sample as specified in the
p.76ECC-Rater Company’s access credentials to their respective data registries.
p.75i. Submit a Quality Assurance Quarterly Report for each project where an audit
p.79remediation process:
p.80with these regulations.
p.81applicant shall sign an agreement with the ECC-Provider, in which the ECC-Rater
p.82c. The ECC-Rater Company must show proof that the person(s) providing
p.7130 days of the date of the notice of violation or within 20 days of receiving a
p.74on the ECC-Provider’s system in a way that is not substantially limited compared to the
p.72shall not be effective until the ECC-Rater Company has exhausted its right to
p.77within a specified timeframe. The notice of violation shall be in writing and include a
p.73Residential Appendices.
p.78ii. Terms of Suspension. Suspension may include conditionally or unconditionally
p.75(Section 10-103.3(d)5) was performed and failed within the calendar quarter.
p.7612. Responses to Commission Requests for Data.
p.81Company shall agree, at minimum, to comply with all applicable laws and regulations,
p.82signatory services under Section 10-103(a)1 and Section 10-103(a)3 will
p.79i. A decertified ECC-Provider may regain their eligibility to apply to become an
p.71response or additional information from the ECC-Rater Company, whichever is
p.80D. ECC-Raters shall comply with the conflict-of-interest prohibitions set forth in Section 10-
p.74ability of the ECC-Provider.
p.72appeal pursuant to Section 10-103(h) or until the time to exercise its right to
p.77description of the legal requirements and violations, any corrective action the ECC-
p.78restricting access to the Report Generator by the ECC-Provider. The duration of
p.73viii. Whether the homeowner declined to have verification or testing, and corrective
p.75The Quality Assurance Quarterly Report shall be submitted no less than 60 days
p.81including but not limited to the requirements provided in Section 10-103.3.
p.82be legally responsible for design, construction, or installation in the
p.71later, the ECC-Provider shall provide a final determination of a violation to the
p.79ECC-Provider by submitting an Application for Remediation pursuant to Section
p.76A. At any time, the Executive Director may request access to or a digital copy of one or
p.80103.3(b)1.
p.72appeal has lapsed.
p.77Provider must take, and the timeframe for complying with all the notice of violation
p.74C. ECC-Providers may not restrict or degrade the Commission’s ability to query, access,
p.78suspension shall be included in the terms of suspension.
p.75after the end of the calendar quarter. Each reported project shall list the
p.73action taken after occupancy as specified in the Residential Appendices.
p.82applicable classification for the scope of work and will sign as the
p.71ECC-Rater Company within 30 days. The violation shall not be effective until the
p.7910-103.3(c)9 and receiving the Commission’s approval.
p.812. Required Conduct.
p.76more registered compliance documents, associated with Compliance Registration
p.77requirements. The ECC-Provider will have 10 days of receipt of the notice of violation to
p.80E. ECC-Raters shall be present and personally participate in any field verification and
p.74sort, or filter this information in any way that is substantially different compared to the
p.72D. Step 4: Decertification. If an ECC-Rater Company fails to comply with the terms of
p.75contractor information, ECC-Rater information, project address, project permit
p.82Responsible Person.
p.78iii. Amendment to Terms of Suspension. The Executive Director may amend any
p.71ECC-Rater Company has exhausted its right to request reconsideration by the
p.73B. Data Recording for Quality Assurance Actions.p.74
p.76Packages, and quality assurance records that an ECC-Provider is required to maintain
p.79ii. Once a decertified ECC-Provider has completed the remediation process by
p.77respond in writing. If the Executive Director receives a response, the Executive Director
p.81A. Reservedp.82
p.74ability of the ECC-Provider.p.75
p.80diagnostic test or field verification activity. If an ECC-Rater relies on employees,
p.72suspension or receives a new notice of violation while suspended or while a notice ofp.73
p.75code (if available), other project identification available to help identify thep.76
p.71ECC-Provider or until the time to exercise that right has lapsed (Section 10-
p.78term of the suspension by issuing a notice of amendment to terms of
p.76pursuant to Section 10-103.3(d)9 and the Building Energy Efficiency Standards,p.77
p.77shall acknowledge the response and, within 5 days, request additional informationp.78
p.79receiving the Commission’s approval, the decertified ECC-Provider becomes ap.80
p.80designees, trainees, or any other individual to assist them in performing field verificationp.81
p.71103.3(d)8Aiv).p.72
p.78suspension to the ECC-Provider’s Designated Contact that includes the newp.79
p.71CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.72CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.73CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.74CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.75CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.76CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.77CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.78CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.79CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.80CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.81CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM
p.82CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 103.3 – ADMINISTRATIVE PROCEDURES FOR THE ENERGY CODE COMPLIANCE PROGRAM