SECTION 160.8 – MANDATORY REQUIREMENTS FOR SOLAR READY BUILDINGS

p.539SECTION 160.8 – MANDATORY REQUIREMENTS FOR SOLAR READY BUILDINGS

p.539(a) Solar ready buildings. Newly constructed multifamily buildings shall meet the requirements of

p.539Section 110.10 applicable to the building project.

p.539SECTION 160.8 – MANDATORY REQUIREMENTS FOR SOLAR READY BUILDINGS