p.8610-104 – EXCEPTIONAL DESIGNS
p.86(a) Requirements. If a building permit applicant proposes to use a performance compliance approach, and the
p.86building designs cannot be adequately modeled by an approved calculation method, an applicant shall be granted a building permit if the Commission finds:
p.861. That the design cannot be adequately modeled with an approved calculation method;
p.862. Using an alternative evaluation technique, that the design complies with Part 6; and
p.863. That the enforcement agency has determined that the design complies with all other legal requirements.
p.86(b) Applications. The applicant shall submit four copies of a signed application with the following materials to the
p.86Executive Director:
p.861. A copy of the plans and documentation required by Section 10-103(a)2; and
p.862. A statement explaining why meeting the energy budget cannot be demonstrated using an approved calculation method; and
p.863. Documentation from the enforcement agency stating that:
p.86A. Meeting the energy budget requirements cannot be demonstrated using an approved calculation
p.86method; and
p.86B. The design complies with all other legal requirements; and
p.864. A detailed evaluation of the energy consumption of the proposed building and the building's materials, components, and manufactured devices proposed to be installed to meet the requirements of Part 6 using an alternative evaluation technique. The evaluation shall include a copy of the technique, instructions for its use, a list of all input data, and all other information required to replicate the results.
p.86CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 1, CHAPTER 10, SECTION 104 – EXCEPTIONAL DESIGNS