SECTION 160.9 – MANDATORY REQUIREMENTS FOR ELECTRIC READY BUILDINGS

p.541B. The main electrical service panel shall have a reserved space to allow for the

p.542B. If the future HPWH space is designed to vent indoors, the designated space for the

p.543i. The space reserved shall be the space required for a heat pump water heater system that

p.544A. The electrical power required to power a heat pump water heater system that meets

p.541installation of a double pole circuit breaker for a future electric clothes dryer installation. The reserved space shall be permanently marked as “For Future 240V use.”

p.542future heat pump water heater shall vent to a communicating space in the same pressure boundary. The total combined volume connected shall be 700 cubic feet or larger and vent to the interior via:

p.543meets the total building hot water demand as calculated and documented by the responsible person associated with the project; or

p.544the total building hot water demand as calculated and documented by the responsible person associated with the project.

p.540SECTION 160.9 – MANDATORY REQUIREMENTS FOR ELECTRIC READY BUILDINGS

p.540(a) General requirements. Multifamily buildings shall comply with the applicable requirements

p.543ii. The space reserved shall meet the requirements specified in Joint Appendix JA15.2.2.

p.544B. The electrical power required that meets the requirements specified for the heat

p.540of subsection 160.9. The building electrical system shall be sized to meet the future electric requirements of the electric ready equipment specified in sections 160.9(b) through (f). The building main service conduit, the electrical system to the point specified in each subsection, and any on-site distribution transformers shall have sufficient capacity to supply full rated amperage at each electric ready appliance in accordance with the California Electrical Code.

p.5412. Systems in common use areas shall include:

p.542i. Fully louvered doors with fixed louvers consisting of a single layer of fixed flat slats and

p.544pump in Joint Appendix JA15.2.5.

p.5433. Ventilation shall be provided by meeting one of the following:

p.542a minimum total NFA of 250 square inches; or

p.541A. Conductors or raceway shall be installed with termination points at the main

p.544ii. Temperature Maintenance Tank. Meet one of the following.

p.543A. Physical space reserved for the heat pump shall be located outside; or

p.541electrical panel, via subpanels panels if applicable, to a location no more than 3 feet from each gas outlet or a designated location of future electric replacement equipment. Both ends of the conductors or raceway shall be labelled “Future 240V Use.” Gas flow rates shall be determined in accordance with the California Plumbing Code. Capacity shall be one of the following:

p.542ii. Two permanent openings of equal area with a minimum total NFA of 250 square inches

p.544A. The electrical power required to power a heat pump water heater system

p.542located within 12 inches from the enclosure top and bottom; or

p.543B. A pathway shall be reserved for future routing of supply and exhaust air via ductwork

p.544temperature maintenance tank that meets the total building hot water demand as calculated and documented by the responsible person associated with the project.

p.543from the reserved heat pump location to a suitable outdoor location. Penetrations through the building envelope for louvers and ducts shall be planned and identified for future use. The reserved pathway and penetrations through the building envelope shall be sized to meet one of the following:

p.542iii Two 8-inch ducts to a communicating space.

p.540(b) Heat Pump Space Heater Ready. Systems using gas or propane furnaces to serve individual

p.540dwelling units shall include the following:

p.542C. If the future HPWH space is designed to vent to the building exterior, the designated

p.542space for the future heat pump water heater shall vent to the exterior via:

p.544B. The electrical power required that meets the requirements specified for the

p.5401. A dedicated 240 volt branch circuit wiring shall be installed within 3 feet from the furnace and accessible to the furnace with no obstructions. The branch circuit conductors shall be rated at 30 amps minimum. The blank cover shall be identified as “240V ready.” All electrical components shall be installed in accordance with the California Electrical Code.

p.541i. 24 amps at 208/240 volts per clothes dryer;

p.544temperature maintenance tank in Joint Appendix JA15.2.5.

p.542i. Fully louvered doors with fixed louvers consisting of a single layer of fixed flat slats

p.543i. The reserved pathway and penetrations shall be sized to serve a heat pump water

p.541ii. 2.6 kVA for each 10,000 Btu per hour of rated gas input or gas pipe capacity; or

p.542and a minimum total NFA of 250 square inches; or

p.543heater system that meets the total building hot water demand as calculated and documented by the responsible person associated with the project.

p.541iii. The electrical power required to provide equivalent functionality of the gas-

p.542ii. Two permanent openings of equal area with a minimum total NFA of 250 square

p.541powered equipment as calculated and documented by the responsible person associated with the project.

p.542inches located within 12 inches from the enclosure top and bottom; or

p.543ii. The reserved pathway and penetrations shall be sized to meet the requirements

p.5402. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a future heat pump space heater installation. The reserved space shall be permanently marked as “For Future 240V use.”

p.543specified in Joint Appendix JA15.2.3.

p.542iii. Two 8 inches capped ducts. All ducts that cross the pressure boundary shall be

p.541(e) Individual Heat Pump Water Heater Ready. Systems using gas or propane water heaters to

p.542insulated to a minimum insulation level of R-6 and the ducts, connections, and building penetrations shall be sealed.

p.5434. Condensate drainage piping. An approved receptacle that is sized per the California Plumbing Code for condensate drainage shall be installed within 3 feet of the reserved heat pump location, or piping shall be installed from within 3 feet of the reserved heat pump location to an approved discharge location that is sized in accordance with the California Plumbing Code, and meet one of the following:

p.541serve individual dwelling units shall include the following components for each gas or propane water heater:

p.540(c) Electric Cooktop Ready. Systems using gas or propane cooktops to serve individual dwelling

p.542(f) Central Heat Pump Water Heater Ready. Central water heating systems using gas or propane to serve multiple dwelling units shall meet the following requirements:

p.540units shall include the following:

p.5411. A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor branch circuit rated to 30 amps minimum, within 3 feet from the water heater and accessible to the water heater with no obstructions. In addition, all the following:

p.5401. A dedicated 240 volt branch circuit wiring shall be installed within 3 feet from the cooktop and accessible to the cooktop with no obstructions. The branch circuit conductors shall be rated at 50 amps minimum. The blank cover shall be identified as “240V ready.” All electrical components shall be installed in accordance with the California Electrical Code.

p.5421. The system input capacity of the gas or propane water heating system shall be determined as the sum of the input gas or propane capacity of all water heating devices associated with each gas or propane water heating system.

p.543i. Condensate drainage shall be sized to serve a heat pump water heater system that

p.543meets the total building hot water demand as calculated and documented by the responsible person associated with the project.

p.541A. Both ends of the unused conductor shall be labeled with the word “spare” and be

p.541electrically isolated; and

p.5422. Space reserved shall include:

p.543ii. Condensate drainage piping shall be sized to meet the requirements specified in Joint

p.5402. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a future electric cooktop installation. The reserved space shall be permanently marked as “For Future 240V use.”

p.541B. A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit

p.542A. Heat Pump. The minimum space reserved shall include space for service clearances and

p.543Appendix JA15.2.4.

p.541breaker for the branch circuit in A above and labeled with the words “Future 240V Use”; and

p.542air flow clearances and shall meet one of the following:

p.5435. Electrical

p.542i. The space reserved shall be the space required for a heat pump water heater system

p.543A. Physical space shall be reserved on the bus system of the main switchboard or on the bus

p.540(d) Electric Clothes Dryer Ready. Clothes dryer locations with gas or propane plumbing shall

p.5412. A condensate drain that is no more than 2 inches higher than the base of the installed water heater and allows natural draining without pump assistance, and

p.542that meets the total building hot water demand as calculated and documented by the responsible person associated with the project; or

p.543system of a distribution board to serve the future heat pump water heater system, including the heat pump and temperature maintenance tanks. In addition, the physical space reserved shall be capable of providing adequate power to the future heat pump water heater in accordance with the following:

p.540include the following:

p.5401. Systems serving individual dwelling units shall include:

p.5413. The construction drawings shall designate a space at least 39 inches by 39 inches and 96 inches tall for the future location of heat pump water heater.

p.542ii. The space reserved shall meet the requirements specified in Joint Appendix JA15.2.1.

p.540A. A dedicated 240 volt branch circuit wiring shall be installed within 3 feet from the

p.542B. Tanks. The minimum space reserved shall include space for service clearances and shall

p.540clothes dryer location and accessible to the clothes dryer location with no obstructions. The branch circuit conductors shall be rated at 30 amps minimum. The blank cover shall be identified as “240V ready.” All electrical components shall be installed in accordance with the California Electrical Code.p.541

p.5414. A ventilation method meeting one of the following:

p.543i. Heat Pump. Meet one of the following.p.544

p.542meet one of the following:p.543

p.541A. The designated space for the future heat pump water heater shall have a minimum

p.541volume of 700 cubic feet; orp.542

p.540SECTION 160.9 – MANDATORY REQUIREMENTS FOR ELECTRIC READY BUILDINGS

p.541SECTION 160.9 – MANDATORY REQUIREMENTS FOR ELECTRIC READY BUILDINGS

p.542SECTION 160.9 – MANDATORY REQUIREMENTS FOR ELECTRIC READY BUILDINGS

p.543SECTION 160.9 – MANDATORY REQUIREMENTS FOR ELECTRIC READY BUILDINGS

p.544SECTION 160.9 – MANDATORY REQUIREMENTS FOR ELECTRIC READY BUILDINGS